Battery storage projects in the UK, by county
The UK planning system holds 2,164 live battery storage projects with 131.8 GW of capacity between them: 187 operating (5,726 MW), 126 under construction (10,591 MW), 1,394 consented and not yet built (79,223 MW) and 457 awaiting a planning decision (36,250 MW). The figures are from the Renewable Energy Planning Database, Q3 2026, which the Department for Energy Security and Net Zero publishes every quarter and which lists every project over 150 kW from the day its application goes in. Each site is counted once: 17 records that repeat another — the same application entered twice, or a resubmission for the same site and size — are left out of every figure and list here, though they stay in the published data, marked.
The operating figure is lower than the 7.3 GW the balancing mechanism registry counts, and is not meant to agree with it: the planning record lists sites by consent and lags the market by up to a quarter, while Elexon lists every unit that trades. Consented capacity is not a forecast. Most of it will not be built in its current form, and the queue for a grid connection, not planning, is what decides which of it is.
- Operating 5.7 GW
- Under construction 10.6 GW
- Consented, not built 79.2 GW
- In planning 36.3 GW
Battery storage near you
Every battery project in the planning record, and every battery trading on the grid, within reach of the place you name.
Built each year
GW becoming operational each year, by the date the planning record gives. 2026 is the year so far.
Every county
Megawatts by stage, where the record states a capacity. A county links to every project in it.
| County | Region | Operating MW | Building MW | Consented MW | In planning MW | Projects |
|---|---|---|---|---|---|---|
| Lincolnshire | East Midlands | 10 | 202 | 3,626 | 2,621 | 76 |
| Strathclyde | Scotland | 800 | 260 | 3,233 | 1,041 | 66 |
| South Yorkshire | Yorkshire and Humber | 100 | 59 | 4,484 | 599 | 52 |
| Nottinghamshire | East Midlands | 50.1 | 480 | 3,563 | 930 | 49 |
| Highland | Scotland | 55 | 34 | 1,953 | 2,481 | 92 |
| Aberdeenshire | Scotland | 50.9 | 40 | 1,869 | 2,220 | 42 |
| Lanarkshire | Scotland | 99.9 | 1,000 | 1,535 | 1,037 | 27 |
| Kent | South East | 387 | 408 | 1,351 | 1,277 | 78 |
| North Yorkshire | Yorkshire and Humber | 191 | 577 | 1,296 | 1,280 | 48 |
| Norfolk | Eastern | 13.6 | 330 | 830 | 2,000 | 44 |
| Lancashire | North West | 89 | 247 | 2,571 | 182 | 66 |
| Leicestershire | East Midlands | 142 | 0 | 1,526 | 1,352 | 34 |
| East Riding of Yorkshire | Yorkshire and Humber | 0 | 0 | 2,959 | 0.4 | 25 |
| Staffordshire | West Midlands | 20 | 400 | 600 | 1,938 | 42 |
| West Midlands | West Midlands | 204 | 600 | 1,819 | 198 | 78 |
| Ayrshire | Scotland | 0 | 915 | 1,681 | 110 | 27 |
| Hampshire | South East | 160 | 131 | 972 | 1,392 | 58 |
| Cheshire | North West | 177 | 407 | 1,429 | 628 | 43 |
| West Yorkshire | Yorkshire and Humber | 170 | 50.1 | 1,821 | 555 | 47 |
| Derbyshire | East Midlands | 36 | 37.5 | 2,323 | 180 | 48 |
| Cambridgeshire | Eastern | 50.7 | 250 | 1,766 | 438 | 49 |
| Essex | Eastern | 426 | 87 | 1,200 | 669 | 77 |
| Cleveland | North East | 0 | 0 | 1,874 | 456 | 27 |
| County Durham | North East | 51.5 | 0 | 387 | 1,488 | 27 |
| Wiltshire | South West | 349 | 46 | 570 | 954 | 46 |
| Cumbria | North West | 59 | 0 | 1,660 | 55.6 | 33 |
| Greater Manchester | North West | 80 | 710 | 810 | 121 | 29 |
| Devon | South West | 61.3 | 0 | 1,269 | 300 | 75 |
| South Glamorgan | Wales | 0 | 1.1 | 1,144 | 441 | 22 |
| Bedfordshire | Eastern | 126 | 0 | 1,417 | 15 | 36 |
| Oxfordshire | South East | 49.9 | 18 | 1,218 | 269 | 38 |
| East Sussex | South East | 0 | 0 | 1,284 | 230 | 22 |
| Suffolk | Eastern | 57 | 150 | 642 | 637 | 60 |
| Gloucestershire | South West | 144 | 0 | 1,263 | 70.1 | 54 |
| Fife | Scotland | 50 | 89.8 | 1,092 | 195 | 35 |
| Dumfries and Galloway | Scotland | 0 | 120 | 706 | 570 | 39 |
| Hertfordshire | Eastern | 0 | 49.5 | 798 | 531 | 37 |
| Perth and Kinross | Scotland | 49 | 0 | 1,270 | 50 | 18 |
| Buckinghamshire | South East | 135 | 0 | 504 | 706 | 55 |
| Borders | Scotland | 0 | 450 | 79.5 | 806 | 15 |
| East Lothian | Scotland | 80 | 0 | 1,011 | 216 | 9 |
| Grampian | Scotland | 0 | 82.9 | 868 | 177 | 25 |
| Renfrewshire | Scotland | 120 | 50 | 925 | 0 | 8 |
| Clwyd | Wales | 0 | 0 | 473 | 610 | 12 |
| West Glamorgan | Wales | 0 | 46 | 753 | 251 | 22 |
| West Sussex | South East | 10 | 0 | 1,034 | 0 | 12 |
| Angus | Scotland | 35 | 59.9 | 821 | 95 | 25 |
| Clackmannanshire | Scotland | 0 | 500 | 400 | 35 | 3 |
| Moray | Scotland | 0 | 300 | 529 | 20 | 7 |
| Northamptonshire | East Midlands | 50 | 25 | 670 | 26.4 | 41 |
| Pembrokeshire | Wales | 0 | 0 | 753 | 0 | 7 |
| Dorset | South West | 45.3 | 49.9 | 633 | 20 | 19 |
| Lothian | Scotland | 0 | 0 | 462 | 259 | 11 |
| Shropshire | West Midlands | 0 | 12 | 496 | 200 | 30 |
| Co. Antrim | Northern Ireland | 10 | 0 | 440 | 250 | 15 |
| Mid Glamorgan | Wales | 0 | 0 | 238 | 430 | 13 |
| Surrey | South East | 6 | 0 | 542 | 120 | 34 |
| Scottish Borders | Scotland | 0 | 500 | 45 | 22 | 5 |
| East Dunbartonshire | Scotland | 0 | 0 | 560 | 0 | 1 |
| Worcestershire | West Midlands | 49.9 | 0 | 44.4 | 460 | 26 |
| Tyne and Wear | North East | 60 | 20 | 228 | 221 | 29 |
| Gwynedd | Wales | 0 | 0 | 506 | 0.8 | 11 |
| Merseyside | North West | 122 | 20 | 118 | 222 | 29 |
| Tayside | Scotland | 150 | 0 | 270 | 50 | 16 |
| Gwent | Wales | 20 | 350 | 29.8 | 28 | 16 |
| London | London | 99.2 | 2.5 | 320 | 0 | 10 |
| Stirling | Scotland | 0 | 0 | 418 | 0 | 5 |
| Somerset | South West | 39.1 | 6 | 306 | 54 | 42 |
| Cornwall | South West | 0 | 48.5 | 341 | 0.2 | 34 |
| Warwickshire | West Midlands | 0 | 0 | 257 | 115 | 24 |
| West Lothian | Scotland | 69.9 | 0 | 281 | 0 | 6 |
| Co. Tyrone | Northern Ireland | 0 | 150 | 74 | 87.8 | 8 |
| Isle of Anglesey | Wales | 0 | 0 | 300 | 0 | 1 |
| Co. Derry / Londonderry | Northern Ireland | 0 | 0 | 0 | 290 | 3 |
| Northumberland | North East | 20.4 | 0 | 153 | 110 | 16 |
| Argyll and Bute | Scotland | 0 | 0 | 85.5 | 197 | 11 |
| Co. Mid Ulster | Northern Ireland | 0 | 0 | 20 | 250 | 3 |
| Midlothian | Scotland | 0 | 0 | 200 | 0 | 1 |
| Co. Derry & Strabane | Northern Ireland | 0 | 0 | 174 | 17 | 3 |
| Humberside | Yorkshire and Humber | 174 | 0 | 0 | 0 | 8 |
| Co. Lisburn & Castlereagh | Northern Ireland | 0 | 0 | 150 | 0 | 1 |
| Co. Fermanagh & Omagh | Northern Ireland | 0 | 0 | 121 | 0 | 2 |
| Islands | Scotland | 0 | 70 | 39.9 | 10 | 5 |
| Co. Down | Northern Ireland | 0 | 0 | 0 | 100 | 4 |
| Baldock | Eastern | 0 | 0 | 0 | 99 | 1 |
| Strabane | Northern Ireland | 0 | 0 | 17 | 75 | 4 |
| Co. Fermanagh | Northern Ireland | 0 | 0 | 90 | 0 | 3 |
| Coventry | West Midlands | 0 | 0 | 70 | 20 | 2 |
| Hereford and Worcester | West Midlands | 20 | 0 | 60 | 0 | 4 |
| Glasgow City | Scotland | 0 | 0 | 64 | 0 | 2 |
| Herefordshire | West Midlands | 0 | 0 | 50.5 | 0 | 5 |
| Powys | Wales | 0 | 0 | 50.4 | 0 | 5 |
| Berkshire | South East | 0.3 | 0 | 50 | 0 | 16 |
| Central | Scotland | 0 | 0 | 0.2 | 49.9 | 4 |
| Dyfed | Wales | 0 | 0 | 37 | 13 | 26 |
| Co. Armagh | Northern Ireland | 0 | 50 | 0 | 0 | 2 |
| Dundee | Scotland | 0 | 0 | 50 | 0 | 2 |
| Inverclyde | Scotland | 0 | 0 | 49 | 1 | 3 |
| Vale of Glamorgan | Wales | 0 | 50 | 0 | 0 | 1 |
| Middlesex | South East | 0 | 0 | 49.9 | 0 | 2 |
| Falkirk | Scotland | 0 | 43 | 0.4 | 0 | 6 |
| Avon | South West | 35 | 0 | 7.2 | 0 | 4 |
| Rhondda Cynon Taff | Wales | 41.8 | 0 | 0.2 | 0 | 3 |
| East Ayrshire | Scotland | 0 | 0 | 40.9 | 0 | 3 |
| Isle of Wight | South East | 0 | 0 | 29.8 | 0 | 2 |
| Shetland | Scotland | 1 | 0 | 0 | 25 | 3 |
| Neath Port Talbot | Wales | 22 | 0 | 0 | 0 | 3 |
| Yorkshire | Yorkshire and Humber | 0 | 0 | 20 | 0 | 1 |
| Blaenau Gwent | Wales | 0 | 6 | 0 | 0 | 1 |
| Orkney Islands | Scotland | 2 | 0 | 0 | 0 | 1 |
| Co. Causeway Coast & Glens | Northern Ireland | 0 | 0 | 1 | 0 | 2 |
| Carmarthenshire | Wales | 0 | 0 | 0.8 | 0 | 4 |
| Denbighshire | Wales | 0 | 0 | 0.2 | 0 | 3 |
| Conwy | Wales | 0 | 0 | 0 | 0 | 1 |
| Isle of Man | North West | 0 | 0 | 0 | 0 | 1 |
| Merthyr | Wales | 0 | 0 | 0 | 0 | 1 |
| Torfaen | Wales | 0 | 0 | 0 | 0 | 1 |
| Wolverhampton | West Midlands | 0 | 0 | 0 | 0 | 1 |
By region
| Region | Nation | Operating MW | Building MW | Consented MW | In planning MW | Projects |
|---|---|---|---|---|---|---|
| Scotland | Scotland | 1,562 | 4,514 | 20,538 | 9,667 | 455 |
| East Midlands | England | 288 | 592 | 9,964 | 5,955 | 199 |
| Yorkshire and Humber | England | 629 | 838 | 12,324 | 2,590 | 175 |
| Eastern | England | 673 | 866 | 6,652 | 4,088 | 250 |
| South East | England | 748 | 557 | 7,036 | 3,782 | 248 |
| North West | England | 527 | 1,384 | 6,588 | 1,209 | 165 |
| West Midlands | England | 294 | 1,012 | 3,397 | 1,930 | 174 |
| South West | England | 674 | 150 | 4,389 | 1,399 | 220 |
| Wales | Wales | 83.8 | 453 | 4,284 | 1,774 | 136 |
| North East | England | 138 | 20 | 2,641 | 2,275 | 80 |
| Northern Ireland | Northern Ireland | 10 | 200 | 1,087 | 1,070 | 48 |
| London | England | 99.2 | 2.5 | 320 | 512 | 14 |
The largest projects not yet operating
| Project | Operator | Capacity MW | Council | Application | Last step | Status |
|---|---|---|---|---|---|---|
| Thorpe Marsh Power Station - Battery Energy Storage | West Burton Energy | 1,450 | Doncaster | 23/00537/FULM | Permission granted, 28 January 2025 | Consented, not built |
| Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage | West Burton Energy & Banks Group | 1,400 | Doncaster | 23/00537/FULM | Permission expired, 28 January 2030 | Consented, not built |
| West Leake Lane, Ratcliffe - Battery Storage | Sandbrook Capital BES Limited | 1,200 | Rushcliffe | 23/01285/FUL | Permission expired, 10 February 2028 | Consented, not built |
| Fairfields Energy Storage System | Novus Renewable Services | 1,025 | South Derbyshire | DMPA/2024/0789 | Permission expired, 17 March 2028 | Consented, not built |
| The Balk, Almholme - Energy Storage System | Innova Renewables | 1,025 | Doncaster | 23/02482/FULM | Permission expired, 14 October 2029 | Consented, not built |
| Coalburn II Energy Storage Facility - Battery Storage Facility | Alcemi Storage Development Limited | 1,000 | Scottish Government (S36) | ECU00004698 | Permission expired, 24 January 2027 | Under construction |
| Rover Way, Splott - Energy Park & Data Centre | Latos Cardiff Limited | 1,000 | Cardiff | 24/00624/FUL | Permission expired, 15 April 2030 | Consented, not built |
| Swinford Battery Energy Storage System | NatPower UK | 1,000 | Harborough | 25/00550/OUT | Permission expired, 18 June 2031 | Consented, not built |
| Tesside GigaPark - Battery Energy Storage System | NatPower UK (NP SPV 27 Limited) | 1,000 | Redcar and Cleveland | R/2026/0364/CL | Permission granted, 13 July 2026 | Consented, not built |
| Canners Lane Energy Park, High Dike - Battery Energy Storage | NatPower UK | 1,000 | North Kesteven | S25/1534 | Application submitted, 23 September 2025 | In planning |
| Drakelow - Battery Energy Storage System | Tagenergy Development UK Limited | 1,000 | South Derbyshire | DMPA/2024/1643 | Application submitted, 20 December 2024 | In planning |
| Hawthorn Pit Green Energy Park - Battery Energy Storage System | NatPower UK | 1,000 | County Durham | DM/25/02255/FPA | Application submitted, 27 August 2025 | In planning |
| Hill Rise, Coleby - Battery Energy Storage | Navenby Energy Limited | 1,000 | North Kesteven | 25/0533/FUL | Application submitted, 15 May 2025 | In planning |
| Mowbray Battery Energy Storage Station | Mowbray Energy Park Limited | 1,000 | North Yorkshire | ZB24/02455/HYB | Application submitted, 19 December 2024 | In planning |
| Old Rides Farm, Leysdown Road - Battery Energy Storage System | Nat Power | 1,000 | Swale | 25/503466/FULL | Application submitted, 28 August 2025 | In planning |
| Southampton Battery Energy Storage | NatPower UK | 1,000 | Southampton | 26/00833/FUL | Application submitted, 17 July 2026 | In planning |
| Fanny House Farm, Bay Gateway - Battery Storage | Innova Renewables | 940 | Lancaster | 23/00749/FUL | Permission expired, 28 November 2026 | Consented, not built |
| Haughend Farm - Alyth Battery Energy Storage System | EcoDev Group Limited | 900 | Scottish Government (S36) | ECU00004631 | Permission expired, 26 November 2027 | Consented, not built |
| Sweetbriar Farm - Battery Energy Storage System | Lightrock Power Limited | 800 | North Lincolnshire | PA/2025/794 | Permission expired, 3 June 2033 | Consented, not built |
| The Park Farm, Birds Corner - Battery Energy Storage | Regener8 Power Limited | 800 | Breckland | PL/2025/0904/FMAJ | Application submitted, 23 June 2025 | In planning |
| Neilston Greener Grid Park - Phase 2 | Statkraft UK LTD | 750 | Scottish Government (S36) | ECU00004988 | Permission expired, 13 August 2029 | Consented, not built |
| Auchentiber Road - Battery Energy Storage System | Apatura GPC 700 Limited | 700 | Scottish Government (S36) | ECU00004979 | Permission granted, 11 September 2024 | Consented, not built |
| Carrington Power Station, Manchester Road - Battery Storage | Statera Energy | 680 | Trafford | 110320/FUL/23 | Construction started, 1 November 2026 | Under construction |
| Braxbess Battery Storage | Braxbess Limited | 650 | Scottish Government (S36) | ECU00004993 | Permission expired, 23 July 2028 | Consented, not built |
| Beacon Fen Energy Park | Low Carbon Limited | 600 | The Planning Inspectorate - National Infrastructure | EN010151 | Permission granted, 21 August 2026 | Consented, not built |
| Daines Battery Energy Storage System | SSE Daines BESS Limited | 600 | Trafford | 115160/FUL/24 | Permission expired, 15 May 2028 | Consented, not built |
| Stable Green, Sand Hill Lane - Battery Energy Storage System | Lightrock Power | 600 | Wealden | WD/2024/2919/MAJ | Permission expired, 31 July 2028 | Consented, not built |
| Whitehall Battery Storage | Apatura | 560 | Scottish Government (S36) | ECU00004982 | Permission expired, 22 July 2028 | Consented, not built |
| Eggborough Battery Energy Storage System | SSE Renewables Ireland Limited | 550 | North Yorkshire | ZG2024/1306/FULM | Permission expired, 30 May 2028 | Consented, not built |
| Spalding Energy Park - Battery Storage | Intergen Limited | 550 | South Holland | H16-1327-21 | Permission expired, 14 June 2028 | Consented, not built |
| Chads Farm - Photovoltaic Arrays & Battery Storage | Renewable Connections Developments Limited | 522 | Cheshire West and Chester | 22/00224/FUL | Application submitted, 21 February 2022 | In planning |
| Red House Farm, Old Norwich Road - Battery Energy Storage System | The Surrey Research Park | 520 | Mid Suffolk | DC/25/02824 | Application submitted, 24 June 2025 | In planning |
| High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System | ESB (Harker) Limited | 502 | Scottish Government (S36) | ECU00006063 | Application submitted, 12 May 2025 | In planning |
| Devilla Energy Storage Facility | Alcemi Storage Development Limited | 500 | Scottish Government (S36) | ECU00003469 | Permission expired, 13 December 2028 | Under construction |
| Eccles II Substation - Battery Energy Storage System | Matrix Renewables | 500 | Scottish Government (S36) | ECU00004804 | Permission expired, 16 December 2027 | Under construction |
| Abbotshaugh Battery Storage | Island Green Power (IGP Solar 25 Limited) | 500 | Scottish Government (S36) | ECU00005224 | Permission expired, 7 September 2031 | Consented, not built |
| Braston New Energy / The Wallace Project | ContourGlobal | 500 | Scottish Government (S36) | ECU00004995 | Permission granted, 23 April 2025 | Consented, not built |
| Culham Science Centre, Clifton Hampden - Battery Storage Facility | Statera Energy | 500 | South Oxfordshire | P24/S1498/FUL | Appeal granted, 22 July 2025 | Consented, not built |
| East Claydon Battery Energy Storage | Statera Energy | 500 | Buckinghamshire | 23/03875/APP | Appeal granted, 11 September 2025 | Consented, not built |
| Eggborough Power Station, Selby Road - Battery Storage | Eggborough Power Limited | 500 | North Yorkshire | 2022/1105/FULM | Permission expired, 17 January 2026 | Consented, not built |
Battery storage in Aberdeenshire
36 projects, 4,180 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Fordtown Energy Storage Fordtown, Kintore, Inverurie, Grampian | Eelpower | 49.9 | Operating |
| Hywind 2 Buchan Deeps, 20km off Peterhead | Statoil | 1 | Operating |
| Bilbo Solar Farm Energy Storage Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian | Green Energy International | 40 | Under construction |
| Hillhead Of Gask, Longhaven -Battery Storage Hillhead Of Gask Longhaven Peterhead | The Greenspan Agency | – | Under construction |
| Abbotshaugh Battery Storage Abbotshaugh, New Deer, Turriff | Island Green Power (IGP Solar 25 Limited) | 500 | Consented, not built |
| Upper Greenfield, Cuminestown - New Deer 2 Battery Energy Storage Upper Greenfield, Cuminestown, Turriff | Blackhall & Powis | 400 | Consented, not built |
| Salamander Offshore Wind Farm - Battery Storage and Onshore Connection Lunderton, N/O Peterhead | Orsted & Simply Blue Group | 180 | Consented, not built |
| Persley BESS - Battery Storage North of Persley Wastewater Treatment Plant | Anesco | 70 | Consented, not built |
| Electricity Sub Station, Strichen - Battery Storage Facility Adj Electricity Sub Station Strichen | Intelligent Land Investments Group plc | 50 | Consented, not built |
| Frodo Solar and Battery Energy Development Frodo Solar Farm, Crimond, Fraserburgh | Green Energy International | 50 | Consented, not built |
| Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage Adjacent To Greenbank Caravan And Trailers Hillhead Of Phingask | Flexion Energy UK Storage | 50 | Consented, not built |
| Bridgend Farm, Arbuthnott - Battery Energy Storage System Bridgend Farm Arbuthnott | OPDE UK Limted | 49.9 | Consented, not built |
| Forest Avenue Cottage, Drumlithie - Battery Energy Storage Site To The North West Of Forest Avenue Cottage Drumlithie Stonehaven | Drumlithie Battery Limited | 49.9 | Consented, not built |
| Kintore Substation, Leylodge - Battery Energy Storage The E/O Kintore Substation, Leylodge, Kintore, Inverurie | XRE Gamma Limited & EDF | 49.9 | Consented, not built |
| Meetlaw Farm, Fordoun - Battery Energy Storage System Meetlaw Farm Fordoun Laurencekirk | One Planet Developments Limited | 49.9 | Consented, not built |
| Middleton Of Potterton Farm - Battery Energy Storage System Middleton Of Potterton Farm, Aberdeen | Green Switch Capital (Qair) | 49.9 | Consented, not built |
| Persley Croft - Battery Storage Persley Croft | RE Projects Development | 49.9 | Consented, not built |
| South Leylodge Farmhouse, Kintore - Battery Energy Storage System 450m Nw/O South Leylodge Farmhouse, Kintore | Conrad Energy (Developments) Limited | 49.9 | Consented, not built |
| A981 Fraserburgh - Battery Energy Storage East Of A981 | Fraserburgh Energy Limited | 45 | Consented, not built |
| Lower Bodachra - Energy Storage System Lower Bodachra, Whitestripes Road, Dyce | Novus Renewables Services Limited | 45 | Consented, not built |
| Kintore - Battery Energy Storage 2km S/O Kintore, Inverurie | Mespil Solar Energy | 40 | Consented, not built |
| Bishopmill - Battery Energy Storage To E/O A941 Bishopmill, Elgin | Green Power Consultants | 30 | Consented, not built |
| A981 Fraserburgh - Battery Energy Storage E/O A981 Fraserburgh | Fraserburgh Energy Limited | 25 | Consented, not built |
| Craigshaw Drive - Battery Storage Facility & Electric Vehicle Charging Hub Craigshaw Drive West Tullos Industrial Estate | Craigshaw Drive Ev Limited | 20 | Consented, not built |
| Brownside Farm - Electricity Production Facility & Battery Storage Brownside Farm, Banff | Aberdeenshire Council | 14.9 | Consented, not built |
| Greystone, Blackhills - Battery Energy Storage System The W/O Greystone, Blackhills, Peterhead | Peterhead Flexpower | 500 | In planning |
| Rothienorman, Middleton of Blackhills - BESS NE/O Rothienorman, Middleton of Blackhills, Aberdeen | Blackford Renewables Limited | 500 | In planning |
| Flushing, Longside - Battery Energy Storage System North of Longside Road, Flushing | Harmony Energy Storage | 400 | In planning |
| Netherton, Langside Road - Battery Energy Storage System Netherton Hub Station, S/O A950 Blackhills, Peterhead | Field Energy | 400 | In planning |
| Womblehill Farm, Kintore - Battery Energy Storage System Womblehill, Kintore | RE Projects Development (REPD) & Field | 200 | In planning |
| Boothby Road - Battery Storage West Side Of Boothby Road, Fraserburgh | Opdenergy UK Limted | 49.9 | In planning |
| Middleton Of Blackhills, Rothienorman - Battery Energy Storage System Middleton Of Blackhills Rothienorman | Scot Stability Limited | 49.9 | In planning |
| Old Schoolhouse, Barras - Battery Energy Storage System Ne/O Old Schoolhouse, Barras, Stonehaven | Green Switch Capital Limited | 49.9 | In planning |
| Smiddyhill, Strichen - Battery Energy Storage North Of Smiddyhill Strichen | Muirden Energy | 49.9 | In planning |
| Blackhills Wind Farm Blackhills Estate, Approximately 6km SE/O Elgin & 7km SW/O Fochabers, Fochabers | Koehler Renewable Energy | 20 | In planning |
| HydroGlen Project - Glensaugh Farm North Of Glensaugh Farm Fettercairn | The James Hutton Institute | – | In planning |
Battery storage in Angus
22 projects, 1,011 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Arbroath Battery Storage Land To East Of Crudie Acre Co, Arbroath, Tayside | Coronation Power & Persimmon Homes | 35 | Operating |
| Whitehills Energy Storage Facility Energy Storage Unit 1 Old Brechin Road Forfar | Gigabox Developments Limited & Whirlwind Renewables | 49.9 | Under construction |
| Dragonhall Farm, Padanaram - Battery Storage Field 275M East Of Dragonhall Farm Padanaram Forfar | Ecosse Solar Parks Limited | 10 | Under construction |
| Stracathro - Battery Energy Storage System Adj Addicate Wood and Huntly Wood & 1.6 km S/O Stracathro Services, Brechin | Opdenergy UK 8 Limited | 249 | Consented, not built |
| Balnuith Farm, Tealing - Battery Storage Balnuith Farm, Tealing, Dundee | Apatura | 100 | Consented, not built |
| Tealing Battery Energy Storage Farm 800m Ne/O Gagie Farm, Kellas | Sirius EcoDev Limited | 80 | Consented, not built |
| Balwyllo Farm, Dun - Energy Storage Facility 500m S/E Balwyllo Farm, Dun, Montrose | Whirlwind Energy Storage Limited | 50 | Consented, not built |
| Bankhead, Arbirlot - Battery Energy Storage Land 400M North Of Bankhead Arbirlot Arbroath | Ecocel Energy Storage Limited | 49.9 | Consented, not built |
| Bindwells Battery Storage Facility Land 150M South Of Annfield Cottage Brax | OPDE UK Limted | 49.9 | Consented, not built |
| Carseview Road - Battery Energy Storage System Former Gasworks, Carseview Road, Forfar | Unknown | 49.9 | Consented, not built |
| Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage Dormitories Star Inn Farm C12 From A90 At Star Inn Farm To U329 At Mains Of Fowlis | Epsilon Generation | 49.9 | Consented, not built |
| Dunmill, Substation Dun - Battery Energy Storage 300m Ne/O Bridge Of Dun, Substation Dun, Montrose | Renewable Energy Systems Limited | 49.9 | Consented, not built |
| Templeton Farm, Templeton - Battery Storage 200M West Of Templeton Farm Templeton Birkhill | Fig Power | 49.9 | Consented, not built |
| Denfield Farm Land To East Of Crudie Acre Co, Arbroath, Tayside | Seahills Properties Limited | 20 | Consented, not built |
| East Ballochy Field 400M SE Of East Ballochy, East Ballochy, Montrose, Tayside | ScottishPower Renewables | 10 | Consented, not built |
| Denfield - Battery Storage Facility 200m W/O Denfield, Arbroath | Peter J Stirling Limited | 7 | Consented, not built |
| Craignathro Farm - Solar Array Field 430 West Of Craignathro Farm | Craignathro Farms Limited | 6 | Consented, not built |
| Kinnell Farm, Kinnell - Solar Farm & Battery Energy Storage Kinnell Farm, Kinnell, Arbroath | One Planet Developments Limited | – | Consented, not built |
| Montreathmont Moor Forest - Solar Farm & Battery Storage Montreathmont Moor Forest Montreathmont | Renewable Connections Developments Limited | – | Consented, not built |
| Suttieside Farm, Suttieside Road - Solar Farm & Battery Storage 800M N/O Suttieside Farm Suttieside Road Forfar | Relay Suttieside Limited | – | Consented, not built |
| Craigo Glenskinno - Solar and Battery Farm 650m N/O Glenskinno Farm, Glenskinno, Montrose | British Solar Renewables | 60 | In planning |
| Cossans Solar Farm -ESS Cossans Solar Farm, Haugh of Cossans, Forfar | BLC Energy | 35 | In planning |
Battery storage in Argyll and Bute
8 projects, 282 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| High Constellation Wind Farm Mull of Kintyre | BayWa r.e. UK Limited | 55.5 | Consented, not built |
| Clachaig Glen Kintyre Peninsula, approximately 20km north of Campbeltown and 1.8km north east of Muasdale | RWE UK | 30 | Consented, not built |
| Ardnadam Electricity Sub Station, Sandbank - Battery Energy Storage Facility W/O Ardnadam Electricity Sub Station Sandbank | Flexion Energy UK Storage | – | Consented, not built |
| Cnoc Buidhe Windfarm Cnoc Buidhe Windfarm, West Lussa Forest | Belltown Power Limited | 109 | In planning |
| Corr Chnoc Wind Farm Approximately 2km NE/O The Village Of Kilmore, 5km E/O The Centre Of Oban, Oban | Galileo Green Energy Scotland Limited | 25 | In planning |
| Giants Burn Wind Farm -Batter Energy Storage 2.1 Km Nw/O Dunoon & 1.5 Km Sw/O Sandbank, Dunoon | Statkraft UK Limited | 23 | In planning |
| Cruach Clenamacrie Wind Farm 7km east of Oban | Voltalia | 20 | In planning |
| West Torrisdale Wind Farm West Torrisdale Wind Farm Approx 4km South West Of Carradale Kintyre Argyll And Bute | ESB Asset Development UK | 20 | In planning |
Battery storage in Avon
3 projects, 42.2 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Feeder Road Adjacent To St Philip's Marsh, Feeder Road, Land Off, Bristol, Avon | Thrive Renewables | 20 | Operating |
| Lockleaze Energy Storage Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol | Aura Power | 15 | Operating |
| Philip Street Car Breakers Philip Street Car Breakers, Philip Street, St. Philips Marsh, Bristol | Conrad Energy | 7.2 | Consented, not built |
Battery storage in Ayrshire
26 projects, 2,706 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Hunterston Grid Services Complex - Energy Storage Facility Campbelton Farm, Campbelton Road, West Kilbride | Revera Energy | 400 | Under construction |
| Camsiscan Farm, Craigie - Kilmarnock South Battery Energy Storage System Camsiscan Farm, Craigie, Kilmarnock South, Kilmarnock | Noriker Power Limited / CIP | 350 | Under construction |
| Coylton Substation, Coylton - Battery Energy Storage S/O A70 Adj Coylton Substation, Coylton, Cumnock | Statkraft UK Limited | 50 | Under construction |
| Holmston Road - Battery Storage Facility Holmston Farm Holmston Road Ayr | Field Energy | 49.9 | Under construction |
| Loch Fergus Farm - Energy Storage System Loch Fergus Farm | Locogen | 45 | Under construction |
| Arecleoch Wind Farm (extension) Land 2km south west of Barrhill, South Ayrshire | ScottishPower Renewables | 20 | Under construction |
| Braston New Energy / The Wallace Project A77, Masonhill, Alloway | ContourGlobal | 500 | Consented, not built |
| Kilmarnock Battery Energy Storage System 250 metres (m) to the north of the existing Kilmarnock South Substation | Matrix Renewables | 500 | Consented, not built |
| Belston Battery Storage north of A70 at Belston | KX Alpha Ltd | 150 | Consented, not built |
| Flemyland Battery Storage South East Of Goldcraigs Roads Depot Kilwinning | Flemyland Battery Storage Limited | 100 | Consented, not built |
| High Boydstone Farm - Battery Energy Storage Facility North West Of High Boydstone Farm | New Energy Partnership | 100 | Consented, not built |
| Kilwinning Battery Storage S/O Bannoch Cottage, Old Glasgow Road, Kilwinning | Apatura | 100 | Consented, not built |
| Dersalloch Battery Storage Facility Wind Farm At Dersalloch B741 Dalmellington Road Straiton, Council Boundary Straiton, Maybole | Scottish Power Renewables (UK) Limited | 50 | Consented, not built |
| Killoch Depot, Killoch Colliery - Battery Storage Killoch Depot Killoch Colliery Off A70 West Of Ochiltree Ochiltree | Brockwell Energy Limited | 49.9 | Consented, not built |
| Benthead Farm - Solar Farm & Battery Storage Benhead Farm, Kilwinning | Locogen Limited | 31.1 | Consented, not built |
| Meiklelaught Farm - Battery Storage Meiklelaught Farm, Saltcoats | Green Power Consultants | 30 | Consented, not built |
| Electricity Substation, Bardarroch - Battery Energy Storage S/O Electricity Substation, A70 From B730 To U74 Bardarroch, Ochiltree, Cumnock | Balance Power Projects Limited | 29.9 | Consented, not built |
| Ardoch Farm Ardoch Farm, Kilwinning, Ayrshire | Capbal | 20 | Consented, not built |
| North West Of Jameston Farm North West Of Jameston Farm, Dalry, Strathclyde | Private Developer | 19.9 | Consented, not built |
| Craiginmoddie Wind Farm Craiginmoddie U27 From B741 Junction At Cloyntie To U66 Junction At South Balloch Maybole South Ayrshire | Energiekontor (UK) Limited | – | Consented, not built |
| Knockcronal Wind Farm 4.8 km south of Straiton and 17.4 km east of Girvan, Maybole | Statkraft UK Limited | – | Consented, not built |
| Wee Minnemoer, Millport - Solar Farm & Battery Storage Ne/O Wee Minnemoer, Millport | Comsol Energy | – | Consented, not built |
| Crosbie Wind Farm Kaim Hill, Fairlie, Largs | Galileo Green Energy Scotland Limited (GGE Scotland) | 50 | In planning |
| Back Fell Wind Farm 900m south of Straiton, Maybole | E Power Limited | 40 | In planning |
| Knockodhar Wind Farm Knockodhar Wind Farm, 3.5 kilometres SW/O The Village Of Barr, Girvan | REG Knockodhar Limited | 20 | In planning |
| Hillhouse Quarry, Railway Bridge - Battery Storage Hillhouse Quarry, B730 From A759 Jnct Dundonald To Council Boundary, S/O Railway Bridge, Dundonald, Kilmarnock, Strathclyde | Hillhouse Quarry Company Limited | 0.5 | In planning |
Battery storage in Baldock
1 project, 99 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Westfield Conservation Park - Battery Energy Storage System S/O A507 At Westfield Common, Clothall Road, Clothall | Lightrock Power Limited | 99 | In planning |
Battery storage in Bedfordshire
23 projects, 1,558 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Sundon Substation Adj National Grid Sundon Substation, Water End Lane, Chalton | Pivot Power & EDF Energy Renewables | 49.9 | Operating |
| Chapel Farm Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire | Harmony Energy | 49.5 | Operating |
| Clayhill Farm - Battery Energy Storage Land at Clayhill Farm, Greenfield Road, Westoning, Bedford | Enso Energy Limited | 21 | Operating |
| Clayhill North Clayhill Farm, Greenfield Road, Westoning, Bedford, Bedfordshire | Anesco | 6 | Operating |
| Tebworth - Battery Storage East and W/O Tebworth Leighton Buzzard | Sundon Green Limited | – | Under construction |
| Sundon, Chalton - Battery Energy Storage System W/O Chalton Sewage Treatment Works, Luton Road, Chalton, Luton | Statera Energy | 500 | Consented, not built |
| Toddington Services, Hipsey Spinney - Battery Storage S/O Toddington Services, W/O The M1 Motorway & E/O Hipsey Spinney, Dunstable | Kona Energy Limited | 250 | Consented, not built |
| Dunton Lane - Battery Energy Storage System South of Dunton Lane | Harmony BW Limited | 200 | Consented, not built |
| Dunton Lane - Battery Energy Storage System Dunton Lane, Biggleswade | Central Bedfordshire Council | 177 | Consented, not built |
| Cobholden Battery Storage South Of Bushmead Road Staploe | AGR Renewables | 100 | Consented, not built |
| Thurleigh Road - Battery Energy Storage Thurleigh Road, Milton Ernest, Bedford | Pathfinder Clean Energy UK Dev Limited | 69 | Consented, not built |
| Sundon Sub Station Battery Storage Facility Sundon Sub-Station, Chalton, Luton | Clearstone Energy Limited | 50 | Consented, not built |
| Greenfield Road, Westoning - Battery Energy Storage System Greenfield Road, Westoning, Bedford | Cragside Energy Limited | 30 | Consented, not built |
| Clayhill Farm, Greenfield Road - Battery Energy Storage North Of Clayhill Farm, Greenfield Road, Westoning | Conrad Energy (Developments) Limited | 20 | Consented, not built |
| The Brickmakers Arms Battery The Brickmakers Arms Ph Woburn Road, Kempston Hardwick Bedford | FPC Industry & Enterprise 2 Limited | 20 | Consented, not built |
| Elms Farm Industrial Estate - Battery Storage Facility 1 Hammond Road, Elms Farm Industrial Estate, Bedford | AMP Energy Services Limited | 0.2 | Consented, not built |
| Linmere Community Hall, Huckett Street - Micro Energy Storage Sundon Road, N/O Linmere Community Hall, Huckett Street, Houghton Regis, Dunstable | AMP Clean Energy | 0.2 | Consented, not built |
| Oakhill Place, High View - Energy Storage Facility Woodcote And Overdale Adjacent Oakhill Place High View | AMP Clean Energy | 0.2 | Consented, not built |
| Pumping Station - Micro Energy Storage Pumping Station, Johnson Drive, Leighton Buzzard | AMP Energy Services Limited | 0.2 | Consented, not built |
| Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System Astral Green, S/O Leighton Road And N/O The A505, Stanbridge, Leighton Buzzard | Arnold White Estates Limited | – | Consented, not built |
| Wandon End - Solar Farm & Battery Storage Ne/O Wandon End, Luton | EPL 002 Limited | – | Consented, not built |
| Bedford Solar, Northill Road - Solar Farm & Battery Storage N/O Northill Road, Cople, Bedford | QC Ubertino Limited | 15 | In planning |
| Eastern Way Eastern Way, Heath And Reach, Leighton Buzzard | Arnold White Estates Limited | – | In planning |
Battery storage in Berkshire
13 projects, 50.3 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Limberlost Solar Farm Landfill Site Crookham Common, Thatcham, Berkshire | Anesco | 0.3 | Operating |
| Withy Place, Bramley Road - Battery Energy Storage Withy Place Bramley Road Silchester | Root Power South Limited | 50 | Consented, not built |
| Ash Lane, Little London - Battery Storage Facility The E/O Ash Lane & Ash Park Business Centre, Ash Lane, Little London, Bramley, Reading | AGR Group | – | Consented, not built |
| Bath Road, Grange Lane - Battery Storage N/O Bath Road, Bounded By Pips Way & Grange Lane, Beenham, Reading | Grundon Waste Management Limited | – | Consented, not built |
| Bloomfield Hatch Farm - Solar Farm & Battery Bloomfield Hatch Farm Bloomfield Hatch Mortimer Reading | Horizon Power & Energy Limited | – | Consented, not built |
| Bramley Frith Solar Farm Minchens Lane | Bramley Solar Limited | – | Consented, not built |
| Brickledons Farm, Clappers Farm Road - Battery Energy Storage Facility Brickletons Farm, Clappers Farm Road, Silchester, Reading | Brickledons Farm | – | Consented, not built |
| Heatherwood Hospital, Brook Avenue - Battery Energy Storage Heatherwood Hospital, Greenwood Offices, Brook Avenue, Ascot | Frimley Health NHS Foundation Trust | – | Consented, not built |
| MOTO Reading Services - Tesla Megapack & EV Charging Motorway Service Area Reading Services, Eastbound, Burghfield, Reading | Moto Hospitality Limited (Head Office) | – | Consented, not built |
| Manor Farm, Poyle Road - Battery Energy Storage Manor Farm, Poyle Road, Poyle, Slough | Private Developer | – | Consented, not built |
| Mary Hare School, Wantage Road - Solar Panels, ASHP & BESS Mary Hare School Arlington Manor Snelsmore Common | Mary Hare School | – | Consented, not built |
| Motorway Service Area, Burghfield - Solar Farm Motorway Service Area, Reading Services Eastbound, Burghfield, Reading | Moto Hospitality Limited | – | Consented, not built |
| Spencers Wood Solar Farm, Basingstoke Road - Solar Array Spencers Wood Solar Farm Land north of Sheepbridge Court Farm Basingstoke Road Swallowfield | Greentech | – | Consented, not built |
Battery storage in Blaenau Gwent
1 project, 6 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Rassau Industrial Estate Unit 16, Rassau Industrial Estate, Rassau, Ebbw Vale | Private Developer | 6 | Under construction |
Battery storage in Borders
14 projects, 1,336 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Eccles Battery Energy Storage System W/O Eccles Substation, Coldstream | Zenobe Energy Limited | 400 | Under construction |
| Eccles Substation, Eccles - Battery Energy Storage System W/O Eccles Substation, Eccles, Coldstream | Eccles Grid Stability Limited | 50 | Under construction |
| Keepers House, Byrecleugh - Battery Energy Storage North West Of Keepers House Byrecleugh Longformacus | Sunlaws Development Company Limited | 49.5 | Consented, not built |
| Ditcher Law Wind Farm N/S/E & W/O Vineleaf Cottage | E Power Ltd | 30 | Consented, not built |
| Holiday Park, Whithaugh Park - Solar Panels & BESS Holiday Park Whithaugh Park | Home Smart Energy | – | Consented, not built |
| Pittlesheugh Farm Bess, Springwells Farmhouse - Battery Energy Storage Pittlesheugh Farm Bess Limited, W/O Springwells Farmhouse, Greenlaw, Duns | The Energy Workshop | 340 | In planning |
| Bishops Dal - Battery Energy Storage System S/O Eccles Substation, Coldstream | Renewable Energy Systems RES Limited (Beaufort) | 150 | In planning |
| Bowshiel Farm - Battery Energy Storage Bowshiel Farm, Grantshouse | Voltalia UK | 80 | In planning |
| Lees Hill Energy Park Lees Hill Energy Park, S/O Black Hill Wind Farm, Stobswood Road, Duns | Fred Olsen Renewables Limited | 60 | In planning |
| Mid Hill Wind Farm N/O Harwood Farmhouse, Hawick | Invenergy Services UK | 53.2 | In planning |
| Longcroft Wind Farm Longcroft Wind Farm Land East Of Longcroft Farmhouse Oxton | Renewable Energy Systems | 50 | In planning |
| Stirches Renewable Energy Park - Solar Panels & Battery Energy Storage Stirches Renewable Energy Park (solar And BESS) Land To South And East Of Stirches Mains | IB Vogt UK Limited | 30 | In planning |
| Tweed Valley, Southern Uplands - Oliver Forest Wind Farm Tweed Valley, Southern Uplands, Biggar | Statkraft UK Limited | 23 | In planning |
| Chesters - Millmoor Rig Wind Farm & Battery Energy Storage SW/O Chesters, Harwick | ESB Asset Development UK Ltd | 20 | In planning |
Battery storage in Buckinghamshire
36 projects, 1,345 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Stony Energy Storage Facility Land to the south west of Stony Stratford Substation, south of Stratford Road, Milton Keynes | Gore Street Energy Storage Fund | 79.9 | Operating |
| Derehams Farm, Derehams Lane - Battery Storage Derehams Farm, Derehams Lane, Loudwater, High Wycombe | Eku Energy & Statkraft | 40 | Operating |
| Bumpers Lane Solar Farm Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire | Anesco | 13.3 | Operating |
| Salcey Solar Farm Bulls Head Farm, Eakley Lanes, Newport Pagnell | Anesco | 1 | Operating |
| Falcon Project Milton Keynes, Buckinghamshire | Western Power Distribution | 0.3 | Operating |
| Fox Covert Solar Farm Fox Covert Solar Farm, Great Horwood, Milton Keynes | Low Carbon | – | Operating |
| East Claydon Battery Energy Storage Rookery Farm, Granborough, Buckingham | Statera Energy | 500 | Consented, not built |
| Alston Drive, Bradwell Abbey - Micro Energy Storage Facility Alston Drive, Bradwell Abbey | AMP Clean Energy | 0.2 | Consented, not built |
| Belvedere Lane, Watling Street - Micro Energy Storage Belvedere Lane meets Watling Street | AMP Clean Energy | 0.2 | Consented, not built |
| Bradwell Road - Micro Storage Facility Verge Off Bradwell Road, Nr Woodward Place Junction, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| Brickhill Street, Lakeside Roundabout - Micro Energy Storage Facility Verge off Brickhill Street, Nr Lakeside Roundabout | AMP Clean Energy | 0.2 | Consented, not built |
| Duckworth Court, Oldbrook Boulevard - Micro Energy Storage Facility Duckworth Court, Oldbrook Boulevard, Oldbrook | AMP Clean Energy | 0.2 | Consented, not built |
| Dukes Drive, Princes Way - Micro Energy Storage Dukes Drive, Nr Princes Way Junction | AMP Clean Energy | 0.2 | Consented, not built |
| Grafton Street, End Of Dunsby Road - Micro Energy Storage Facility Verge Off Grafton Street, End Of Dunsby Road, Redmoor, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| Hammerwood Gate, By University Roundabout - Micro Energy Storage Hammerwood Gate, by University Roundabout, Kents Hill, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| Kelvin Drive - Micro Energy Storage Facility Kelvin Drive, Davy Avenue, Knowlhill, Milton Keynes | AMP Energy Services Limited | 0.2 | Consented, not built |
| Northfield Drive, Tongwell Street - Micro Energy Storage System Northfield Drive, Nr Tongwell Street | AMP Clean Energy | 0.2 | Consented, not built |
| Olney Road, Harvey Drive - Micro Energy Storage Facility Olney Road, by Harvey Drive, Emberton | AMP Clean Energy | 0.2 | Consented, not built |
| Pear Tree Lane, Bleak Hall - Micro Energy Storage Pear Tree Lane, Bleak Hall, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| St Leger Drive, Great Linford - Micro Energy Storage Facility East Side Of St Leger Drive, Great Linford | AMP Clean Energy | 0.2 | Consented, not built |
| Stablebridge Road, Aston Clinton - Battery Storage Front Of Lower Rectory Farm, Stablebridge Road, Aston Clinton, Aylesbury | AMP Clean Energy | 0.2 | Consented, not built |
| Standing Way -Micro Energy Storage Verge by Brinklow Roundabout, Standing Way | AMP Clean Energy | 0.2 | Consented, not built |
| Strangford Drive, Drayton Road - Micro Energy Storage Facility Btw Strangford Drive, Drayton Road, Bletchley, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| The Church Of The Latterday Saints, The High Street - Battery Storage Adjacent to the Church Of The Latterday Saints, The High Street, Two Mile Ash | AMP Clean Energy | 0.2 | Consented, not built |
| The Venue MK, Hindhead Knoll - Micro Energy Storage Facility The Venue Mk, Hindhead Knoll, Walnut Tree, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| Verge In Woughton Leisure Centre - Micro Energy Storage Verge In Woughton Leisure Centre Car Park, Rainbow Drive, Milton Keynes | AMP Clean Energy | 0.2 | Consented, not built |
| Watling Street - Micro Energy Storage Watling Street | AMP Clean Energy | 0.2 | Consented, not built |
| Wolverton Swimming & Fitness Centre, Addington Avenue - Battery Storage Adjacent to Wolverton Swimming and Fitness Centre Car Park, Addington Avenue, Wolverton | AMP Clean Energy | 0.2 | Consented, not built |
| Yeomans Drive, Blakelands - Micro Energy Storage Facility Verge at Tongwell Lake Car Park, Yeomans Drive, Blakelands | AMP Clean Energy | 0.2 | Consented, not built |
| Whirlbush Farm, Kingsey - Solar Farm & Battery Storage Whirlbush Farm, Risborough Road, Kingsey, Aylesbury | Stark Energy | – | Consented, not built |
| East Claydon Substation, East Claydon Road - Energy Storage North Of East Claydon Substation East Claydon Road East Claydon | Statkraft UK Limited | 500 | In planning |
| Derehams Farm, Derehams Lane - Battery Storage Derehams Farm Derehams Lane Loudwater | Newton Energi Limited | 126 | In planning |
| Pinstone Farm, Oxford Road - Battery Energy Storage System Pinstone Farm Oxford Road | Voltwise Power Holdings Limited | 60 | In planning |
| Gerrards Cross Sewage Treatment Works Gerrards Cross Sewage Treatment Works | Peak Gen Power | 20 | In planning |
| Wolverton Road, Giffard Park Roundabout - Micro Energy Storage Wolverton Road, Nr Giffard Park Roundabout, Blakelands | AMP Clean Energy | 0.2 | In planning |
| Rosefield - Solar Farm & Battery Storage Rosefield Solar Farm, Rosefield, Aylesbury | EDF Energy Renewables | – | In planning |
Battery storage in Cambridgeshire
43 projects, 2,504 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Burwell - Battery Storage Burwell | SMS Energy Services | 50 | Operating |
| Breach Farm - Solar farm Land South Of Breach Farm Ness Road Burwell Cambridge | Octopus Renewables Infrastructure Trust | 0.7 | Operating |
| Lapwing Fen 2 - Battery Storage Plant Flower Farm, The Marsh, Walpole St. Andrew, Wisbech | Tribus Clean Energy | 250 | Under construction |
| Meadow Lane Park and Ride Park and Ride Site, The Meadow, Meadow Lane, St Ives | Cambridgeshire CC & Bouygues Energies | – | Under construction |
| Wicken Bridleway, Church Road - Battery Energy Storage Field Btw Wicken Bridleway 38 And Soham Bridleway, 126 Church Road, Wicken, Ely | Green Switch Capital Limited | 400 | Consented, not built |
| Stargoose Farm - Battery Storage N/o Childerley Farm, Childerley Estate, Childerley, Cambridge | Solarcentury Limited & Statkraft Uk Limited | 312 | Consented, not built |
| Walsoken, Burrettgate Road - Battery Storage Facility Burrettgate Road, Wisbech | Walsoken Limited | 200 | Consented, not built |
| North Walpole, St Peter - Battery Energy Storage SE Down Track From Westmoor West Drove North Walpole St Peter Wisbech Norfolk | Roc Noir Limited | 100 | Consented, not built |
| Walpole St Andrew - Battery storage Opp Walpole Sub Station Walpole Bank Walpole St Andrew, Wisbech | Alfred Energy Limited | 100 | Consented, not built |
| Walpole Sub Station, Walpole Bank - Battery Storage Opposite Walpole Sub Station Walpole Bank Walpole St Andrew | Henry Energy Limited | 100 | Consented, not built |
| Anchor Lane, Burwell - Battery Energy Storage Anchor Lane, Newnham Drove, Burwell, Cambridge | Burwell AL Limited | 50 | Consented, not built |
| Newmarket Road, Bottisham - Battery Energy Storage Six Oaks Renewable Energy Park Newmarket Road Bottisham | Ridge Clean Energy Limited | 50 | Consented, not built |
| Nutsgrove Farm, Thorney - Battery Energy Storage Nutsgrove Farm Scolding Drove Thorney Peterborough Peterborough | Cambridge Power Limited | 50 | Consented, not built |
| Rookery Farm, Kimbolton Road - Battery Storage Facility Solar Farm Rookery Farm, Kimbolton Road, Stow Longa, Huntingdon | Bluefield Renewable Developments Limited | 50 | Consented, not built |
| Third Drove, Fengate - Battery Storage Third Drove Fengate | Flag Fen Power Limited | 50 | Consented, not built |
| Weald Farm, Cambridge Road - Solar Farm & Battery Storage Ne/O Weald Farm, Cambridge Road, Eynesbury, St Neots | Ashfield District Council & Voltalia UK | 50 | Consented, not built |
| Lapwing Fen II, Crown Farm Crown Farm, Mill Road, West Walton, Wisbech | Private Developer | 49.9 | Consented, not built |
| Malice Farm, French Drove - BESS Malice Farm, S/O French Drove And E/O & W/O Scolding Drove, Thorney, Peterborough | FRV TH Powertek Limited | 49.9 | Consented, not built |
| Model Farm Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech | Tribus Clean Energy | 49.9 | Consented, not built |
| Reach Road Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire | UK Power Networks | 49.9 | Consented, not built |
| Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage South Of Falcon Park Wilsons Road Longstanton | Regener8 Power Limited | 20 | Consented, not built |
| Kings Dyke, Whittlesey - Battery Energy Storage South Of 99 Kings Dyke Whittlesey | Power Initiatives Limited | 10 | Consented, not built |
| Sunnica Energy Farm (East and West) Land 4.5km East of Burwell and Land 2.5km South-West of Mildenhall | Sunnica | 8.8 | Consented, not built |
| Abbotsley Country Homes, Drewels Lane - Solar Farm South Of Abbotsley Country Homes Drewels Lane Abbotsley | Low Carbon Limited | 6 | Consented, not built |
| Highfield Farm, Royston Road - Solar Farm & Battery Storage Highfield Farm, Royston Road, Litlington | Grupotec Solar 3 UK Limited | 4.5 | Consented, not built |
| Wittering Ford Road Land To The South Of, Wittering Ford Road, Stamford | Solar Charging (Lark Energy) | 3 | Consented, not built |
| Dukesmead Road, Dukesmead Industrial Estate - Battery Storage System Dukesmead Road, Dukesmead Industrial Estate, Peterborough | AMP Clean Energy | 0.2 | Consented, not built |
| Inclusive, Titan Drive - Micro Energy storage facility 1 - 17 Inclusive, Titan Drive, Peterborough | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Lincoln Road - Energy Storage System Verge At Lincoln Road, Near Werrington Parkway, Peterborough | AMP Clean Energy | 0.2 | Consented, not built |
| Postland Road, James Road - Energy Storage System Postland Road & James Road Crowland | AMP Clean Energy | 0.2 | Consented, not built |
| Pumping Station, School Lane - Micro Energy Storage Pumping Station, School Lane, Cambourne, Cambridge | AMP Clean Energy | 0.2 | Consented, not built |
| Rightwell West, Bretton - Micro Energy Storage Verge At Rightwell West, Bretton, Peterborough | AMP Clean Energy | 0.2 | Consented, not built |
| Sewage Pumping Station - Micro Energy Storage Sewage Pumping Station, Broad Lane, Cambridge | AMP Clean Energy | 0.2 | Consented, not built |
| Vicarage Farm - Energy Storage System Vicarage Farm Road And Leofric Square, Peterborough | AMP Clean Energy | 0.2 | Consented, not built |
| Wisbech St Mary Sports & Community Centre - Energy Storage Facility Wisbech St Mary Sports And Community Centre Limited Playing Field Beechings Close Wisbech St Mary | AMP Clean Energy | 0.2 | Consented, not built |
| Dogsthorpe, Welland Road - Solar Farm & Battery Storage Dogsthorpe Landfill Site Welland Road Dogsthorpe | Infinis Solar Developments Limited | – | Consented, not built |
| Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage Fenmarc Produce Limited, 178 Gosmoor Lane | Fenmarc Produce Limited | – | Consented, not built |
| Land Adjacent to Walpole National Grid Substation - Battery Energy Storage Adj To Walpole National Grid Substation And White House Farm, Frenchs Road, Wisbech | STP Green Limited | – | Consented, not built |
| Follens Road, Walpole St Andrew - Battery Energy Storage Follens Road, Walpole St Andrew, Wisbech | Qair UK | 278 | In planning |
| East Park Energy E/O Little Staughton, Btw S/O Great Staughton, Kimbolton Road, Hail Weston, St Neots | Brockwell Energy | 100 | In planning |
| Weirs Drove, Burwell - Battery Storage Facility Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge | Fen Power 1 Limited | 30 | In planning |
| West Fen Farm, Whitemoor Road - Battery Storage West Fen Farm, Whitemoor Road, March | Pathfinder Clean Energy UK Dev Limited | 30 | In planning |
| Low Fen, Drove Way - Energy Storage System Low Fen, Drove Way, Ditton, Cambridge | South Cambridgeshire District Council | – | In planning |
Battery storage in Carmarthenshire
4 projects, 0.8 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Beechwood Industrial Estate - Micro Energy Storage Beechwood Industrial Estate, Llandeilo, Dyfed | AMP Clean Energy | 0.2 | Consented, not built |
| Dafen Inn Row And Exchange Row - Energy Storage System Dafen Inn Row And Exchange Row, Llanelli, Dyfed | AMP Clean Energy | 0.2 | Consented, not built |
| Heol Parc Mawr Workshops, Cross Hands - Micro Energy Storage Heol Parc Mawr Workshops, Cross Hands, Llanelli | AMP Clean Energy | 0.2 | Consented, not built |
| Nock Drayot Agricultural, Llysonnen Road - Micro Energy Storage Nock Drayot Agricultural, Llysonnen Road, Carmarthen | AMP Clean Energy | 0.2 | Consented, not built |
Battery storage in Central
4 projects, 50.1 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| The Helix Park - Micro Energy Storage Facility The Helix Park, Falkirk | AMP Clean Energy | 0.2 | Consented, not built |
| Abbotshaugh, Sawmill Abbots Road - Battery Energy Storage System The W/O Abbotshaugh, Sawmill Abbots Road, Falkirk | Spectrum Reserve 4 Limited | – | Consented, not built |
| Bolfornought Farm Battery Storage Facility Land 650M South West Of Bolfornought Farm Stirling | Intelligent Land Investments Group | 49.9 | In planning |
| Dalderse Sewage Works - Solar Array & Battery Storage Dalderse Sewage Works | Scottish Water | – | In planning |
Battery storage in Cheshire
38 projects, 2,640 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| National Grid Electricity Substation, Capenhurst Lane - Battery Storage S/O National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester | Zenobe Energy Limited | 100 | Operating |
| Native River Adj Electricity Substation | Varco Energy | 57 | Operating |
| Welkin Road, Bredbury - Battery Storage System Welkin Road | Arlington Energy Limited | 20 | Operating |
| Leiria Way Car Park Car Park Leiria Way, 13 High Street, Runcorn | Entrust Microgrid | – | Operating |
| Fiddlers Ferry Power Station - Battery storage Fiddlers Ferry Power Station, Widnes Road, Warrington | SSE Enterprise (SSE PLC) | 150 | Under construction |
| Freshfields, Fairy Lane - Battery Storage Freshfields Fairy Lane | STOR Power Utilities Limited | 99.9 | Under construction |
| Capenhurst Lane, Capenhurst - Battery storage Capenhurst Lane Capenhurst Chester | HD888CAP Limited | 57 | Under construction |
| Bredbury Substation - Battery Storage Facility Bredbury Substation, Stockport Road West, Bredbury, Stockport | Private Developer | 49.9 | Under construction |
| Welkin Mill, Welkin Road - Battery Storage Welkin Mill, Welkin Road, Bredbury, Stockport | Noriker Power Limited | 49.9 | Under construction |
| Mollington - Battery Energy Storage S/O A494 Mollington, Chester | Qair Renewables UK Limited | 240 | Consented, not built |
| Rectory Lane - Energy Storage System Rectory Lane, Capenhurst, South Wirral | Net Zero Eighteen Limited | 200 | Consented, not built |
| Cholmondeley Road - Battery Storage The South East Of Junction Between Weaver View And Cholmondeley Road Runcorn | P3P Partners LLP | 150 | Consented, not built |
| Printworks Road - Stalybridge Battery Storage South Of Stalybridge Substation Printworks Road Stalybridge | Zenobe Energy | 150 | Consented, not built |
| Capenhurst Lane, Capenhurst - Battery Storage South of Capenhurst Lane Capenhurst | Aura Power BESS Limited | 100 | Consented, not built |
| Woodford Road - Battery Energy Storage System W/O Woodford Road, Stockport | Pegasus Group | 100 | Consented, not built |
| Golf Road - Battery Energy Storage Golf Road, Sale | Cragside Energy Limited | 90 | Consented, not built |
| Ashton Road, Bredbury - Battery Energy Storage West Of Ashton Road Bredbury | Cragside Energy Limited | 75 | Consented, not built |
| Sale Golf Club, Golf Road - Battery Storage Sale Golf Club Golf Road | 247 Power Limited | 70 | Consented, not built |
| Cheshire Power Station - Battery Storage Facility Cheshire Power Station North Road, Ellesmere Port | RWE Generation UK Plc | 45 | Consented, not built |
| Electricity Substation, Bellevue Lane - Battery Storage Adj To Electricity Substation, The A55 At Bellevue Lane, Guilden Sutton, Chester | Coriolis Energy | 40 | Consented, not built |
| Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage Goyt Hall Farm Goyt Valley Footpath Bredbury Stockport | Queequeg Renewables Limited | 40 | Consented, not built |
| Wallerscote Limebeds - Battery Energy Storage Winnington Avenue, Northwich | Infinis Solar Developments Limited & Green Earth Developments | 30 | Consented, not built |
| Middlewich Road - Solar Photovoltaics & Battery Storage Land Adjacent Councils Composting Plant, Middlewich Road, Crewe | Cheshire East Council | 25 | Consented, not built |
| Former EON Power Station, Booth Lane - Battery Energy Storage System Former Power Station, Booth Lane, Moston | Bluefield Sandbach Limited | 20 | Consented, not built |
| St Michaels Road, Ditton Road - Battery Storage West Of St Michaels Road Ditton Road | Shell Green Limited | 14 | Consented, not built |
| Dragons Lane - Battery Storage Facility N/O Dragon's Lane, Sandbach, Moston | Hydrock | 12 | Consented, not built |
| Portmanmoor Road Industrial Estate, Splott - Battery Storage Units Adj To Electricity Substation, The A55 At Bellevue Lane, Guilden Sutton, Chester | Infinis Energy Services Limited | 10 | Consented, not built |
| Oil Sites Road Land At North Road Ellesmere Port | UK Power Reserve | 9.6 | Consented, not built |
| Newby Road, Hazel Grove - Battery Storage Unit 9 Newby Road Industrial Estate Newby Road Hazel Grove | AMP Energy Services Limited | 7.5 | Consented, not built |
| Grappenhall Village Sports Club, Stockton Lane - Energy Storage System Grappenhall Village Sports Club, Stockton Lane, Grappenhall And Thelwall, Warrington | AMP Clean Energy | 0.2 | Consented, not built |
| Tame Box, Tame Street - Battery Storage Tame Box Land On The North East Side Of Tame Street | AMP Energy Services Limited | 0.2 | Consented, not built |
| Tudor Industrial Estate, Ashton Street- Micro Energy Storage Tudor Industrial Estate, Ashton Street | AMP Clean Energy | 0.2 | Consented, not built |
| Adswood Road - Battery Energy Storage Asdwood Road | Conrad Energy (Developments) II Limited | – | Consented, not built |
| Biffa Waste Services, Manchester Road - Battery Storage Biffa Waste Services, Brick Barn Rixton Old Hall, Manchester Road, Rixton-With-Glazebrook | Biffa Waste Services | – | Consented, not built |
| Sheffield Road - Battery Storage System Sheffield Road, Hyde | FPC Electric Land Limited | – | Consented, not built |
| Chads Farm - Photovoltaic Arrays & Battery Storage Chads Farm, Barhill Drive, Tushingham, Whitchurch | Renewable Connections Developments Limited | 522 | In planning |
| Frodsham Solar Project & Battery Storage Lordship Lane, Frodsham | Cubico Renewables | 100 | In planning |
| Aston Grange, Aston - Solar Panels & Battery Energy Storage System Aston Grange, Aston, Runcorn | Innova Renewables | 6 | In planning |
Battery storage in Clackmannanshire
3 projects, 935 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Devilla Energy Storage Facility Devilla Forest, Kincardine, Alloa | Alcemi Storage Development Limited | 500 | Under construction |
| Kincardine Grid Services Complex - Energy Storage Facility N/O Kincardine Substation, Kincardine, Alloa | Amp Energy | 400 | Consented, not built |
| Windburn Wind Farm Windburn Wind Farm, Hillfoots Business Village, Alva | Octopus Energy & Wind 2 Limited | 35 | In planning |
Battery storage in Cleveland
23 projects, 2,330 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Tesside GigaPark - Battery Energy Storage System Wilton International, Castleton Court, Redcar | NatPower UK (NP SPV 27 Limited) | 1,000 | Consented, not built |
| Worset Lane - Battery Energy Storage System Worset Lane, Hartlepool | Field Energy | 200 | Consented, not built |
| Byers Gill Solar Farm Byers Gill, Stockton on Tees | JBM Solar Projects Limited | 180 | Consented, not built |
| Wilton International, Greystones Road - Phase 1 Wilton International, Lazenby | Sembcorp Utilities (UK) Limited | 150 | Consented, not built |
| Belasis Avenue - Battery Storage South Side Of Belasis Avenue | Story Construction Limited | 75 | Consented, not built |
| Greystones Road, Grangetown - Battery Energy Storage System Wilton Internationaln Off A1053 Greystones Roadn Grangetown | Sembcorp Utilities UK Limited | 60 | Consented, not built |
| The Carrs - Meadow Farm Energy storage facility Se/O The Carrs, Fishing Lakes, Letch Lane, Carlton, Stockton on Tees | BayWa r.e. | 57 | Consented, not built |
| Whelley Hill Farm, Worset Lane - Battery Energy Storage North East Corner Whelly Hill Farm | Reliance Energy Limited | 50 | Consented, not built |
| Long Pasture Farm, Little Stainton - Solar Farm The South Of Long Pasture Farm Little Stainton | Electric Works | 40 | Consented, not built |
| A171, Guisborough Woods - Battery Energy Storage System N/O A171, Guisborough | Harmony MS Limited | 28 | Consented, not built |
| High Barnes Farm, Coal Lane - Battery Storage High Barnes Farm, Coal Lane, Elwick, Hartlepool | Enviromena Project Management UK Limited | 25 | Consented, not built |
| Bowesfield Flexible Energy Park E/O Compass Royston Travel, Bowesfield Crescent | Banks Group | 8 | Consented, not built |
| Marton Road - Micro Energy Storage Facility East Side Of Marton Road | AMP Clean Energy | 0.2 | Consented, not built |
| Riverside Park Industrial Estate - Battery Energy Storage Riverside Park, Industrial Estate | AMP Clean Energy | 0.2 | Consented, not built |
| The North West & South East Sides Of The A19 - Energy Storage Facility The North West & South East Sides Of The A19, Middlesbrough | AMP Clean Energy | 0.2 | Consented, not built |
| California Farm - Solar Farm & Battery Storage California Farm, Letch Lane, Carlton, Stockton on Tees | Infinis Solar Developments Limited | – | Consented, not built |
| Gately Moor Reservoir, Redmarshall - Solar Farm & Battery Storage S/O Gately Moor Reservoir Near Redmarshall Stockton-On-Tees | Canadian Solar & Novergy | – | Consented, not built |
| Gately Moor Reservoir, Redmarshall - Solar Farm & Battery Storage S/O Gately Moor Reservoir Near Redmarshall Stockton-On-Tees | Canadian Solar & Novergy | – | Consented, not built |
| Norton Substation, Letch Lane - Battery Storage Facility W/O Norton Substation, Letch Lane, Stockton on Tees | AL Boum Photo Limited | – | Consented, not built |
| Teesworks, Lackenby - Battery Energy Storage Teesworks, Lackenby, Redcar | South Tees Energy Storage Limited | – | Consented, not built |
| Old Hall Farm, Lackenby - BESS N/O B1380 (Parcel A) & S/O A174 (Parcel B), Lackenby, Middlesbrough | Lackenby Energy Limited | 244 | In planning |
| Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage Cowpen Bewley, Seal Sands Link Road, Middlesbrough | Harmony Energy Limited | 200 | In planning |
| Benridge Farm, Fillpoke Lane - Battery Energy Storage System The East South And W/O Benridge Farm, Fillpoke Lane, Blackhall Rocks, Hartlepool | Development at Benridge Farm | 12 | In planning |
Battery storage in Clwyd
12 projects, 1,083 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Bronwylfa Road, Rhostyllen - Energy Storage System N/O Bronwylfa Road, Rhostyllen, Wrexham | Innova Renewables | 400 | Consented, not built |
| Plas Power Estate Solar Farm Plas Power Estate, Ruthin Road, Wrexham | Lightsource BP | 57 | Consented, not built |
| Little Llwyn Onn - Solar Farm & Battery Storage Little Llwyn Onn, Cefn Road, Llwyn Onn | Novus Renewable Services Limited | 16 | Consented, not built |
| Bretton Hall Solar Farm (England) Bretton Hall Farm, Chester Road, Bretton, Chester | YnNi Newydd (New Energy Co-op) | – | Consented, not built |
| Bretton Hall Solar Farm (Wales) Bretton Hall Farm, Chester Road, Flintshire | YnNi Newydd (New Energy Co-op) | – | Consented, not built |
| Deeside Power Station - Battery Storage Facility Deeside Power Station, Zone 4, Weighbridge Road Deeside Industrial Park, Deeside | Private Developer | – | Consented, not built |
| Land SE of, Spectrum Business Park Land South East Of, Spectrum Business Park, Wrexham Industrial Estate, Bridge Road, Wrexham, Clwyd | Volta Energy Storage | – | Consented, not built |
| Maelor Gasworks - Solar Farm & Battery Storage N/O Wales And West Utilities, Access Roads To Maelor Gasworks, Cross Lanes, Wrexham | Novus Renewable Services Limited | – | Consented, not built |
| National Grid Legacy Substation, Bronwylfa Road - Battery Storage N/O National Grid Legacy Substation, Bronwylfa Road, Talwrn | Pelagic Energy | – | Consented, not built |
| Wonderbank, Brymbo Road - Battery Storage Wonderbank, Intersection Of Brymbo Road & Brake Road, Brymbo | Brymbo Developments Limited | – | Consented, not built |
| Tyn Y Coed - Battery Energy Storage System Adj To Tyn Y Coed, Starkey Lane, Northop, Mold | NatPower UK | 500 | In planning |
| Bodelwyddan, Abergele Road - Solar Farm & Battery Storage Near Bodelwyddan, Abergele | Stantec | 110 | In planning |
Battery storage in Co. Antrim
14 projects, 700 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| AES Kilroot Station Battery Storage Array Carrickfergus | AES Kilroot Power (AES KPL) | 10 | Operating |
| Carncome, Lislunnan Road - Battery Energy Storage C.40m south and c.130m east of No. 64 Lislunnan Road, c.130m south west of No. 89A Carncome Road, and c. 60m north east of No. 56 Lislunnan Road, Kells | Valor Power Limited | 150 | Consented, not built |
| Battery Energy Storage System Development in Ballymena Lands Approximately 342m SE of Kells SubStn. and, Approximately 105m E. of 43, Kells, Ballymena | Green Frog Power | 79 | Consented, not built |
| Quarterland Road, Islandmagee - Battery Storage Quarterland Road, Islandmagee | Solo Renewables Ltd | 75 | Consented, not built |
| Battery Energy Storage System Facility in Antrim Lands Approximately 550m S. of 99 Dublin Rd. and , 650m W. of 120 Dublin Road, Antrim | Heron Storage Limited | 50 | Consented, not built |
| EV Charging Station Development in Toomebridge Lands Within Creagh Business Park, Toomebridge | Heron Storage Limited | 45 | Consented, not built |
| Lisnabreeny Road Lands to the southeast of, 1 Lisnabreeny Road East, Belfast, Co Antrim | Energia Group | 36 | Consented, not built |
| Dunore Point Treatment Works Adjacent to Dunore Point Treatment Works | NI Water | 3 | Consented, not built |
| Battery Energy Storage System in Broughshane Lands Approximate 360m Ne of 246 Carnlough Road, Broughshane, Co. Mid & East Antrim | Heron Energy Limited | 1 | Consented, not built |
| HHT Battery Energy Storage System in Randalstown Lands Approximately 285m South East of No 52 Moneynick Road, Randalstown | HHT Renewables Ltd | 1 | Consented, not built |
| Battery Energy Storage System Development in Ballymena Lands Approximately 80m West of 92 Parkgate Road, Kells, Ballymena | Heron Energy Limited | – | Consented, not built |
| Energy Storage System Installation in Rasharkin 340m South of 5 Magheraboy Road, Rasharkin | Renewable Energy Systems (RES) | 100 | In planning |
| Power Generation Development in Islandmagee Lands Approximately 950m SE of Ballylumford Power Stn. And , Approximately 40m, Islandmagee | Heron Storage Limited | 100 | In planning |
| Colinglen Road Battery Approximately 700m North Of, 28 Colinglen Road, Dunmurry, Belfast, Co Antrim | Hannahstown BESS | 49.9 | In planning |
Battery storage in Co. Armagh
2 projects, 50 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Portadown Road Land @ & 100m S/E of, 87 Portadown Road, Immediately adjacent to NIE, Craigavon, Co Armagh | Low Carbon Storage Ireland | 50 | Under construction |
| Carnbuck Wind Farm Altnahinch Road, Ballymoney | RES Limited | – | In planning |
Battery storage in Co. Causeway Coast & Glens
2 projects, 1 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Battery Energy Storage System in Ballycastle Lands Approximately 640m North-West of 59 Moyarget Road, Ballycastle, Antrim | HHT Renewables Ltd | 1 | Consented, not built |
| Finvoy Road, Rasharkin - Battery Storage 255 Finvoy Road, Rasharkin, Ballymena | AESS NI Limited | – | Consented, not built |
Battery storage in Co. Derry & Strabane
3 projects, 191 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Coolkeeragh - Battery Storage 23 Maydown Road , Londonderry | Coolkeeragh BES Ltd | 140 | Consented, not built |
| Battery Energy Storage Facility in Londonderry Lands At Campsie Industrial Estate , C. 65m S.E. Of E+I Engineering Campsie Unit, Campsie, Londonderry | Heron Storage Ltd | 34 | Consented, not built |
| Seagate Technology, Springtown Industrial Estate - Battery Energy Storage 64 M. South West of 18 Balliniska Road, 80 M. South East of Seagate Technology, Springtown Industrial Estate | Heron Storage Limited | 17 | In planning |
Battery storage in Co. Derry / Londonderry
3 projects, 290 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Maydown Road - Battery Energy Storage System 100 metres North of 17 Maydown Road | Electric Land | 140 | In planning |
| Mullaghmeash Road & Feeny - Battery Energy Storage 550m SW of 38 Mullaghmeash Road and.800m NW of Feeny | Private Developer | 100 | In planning |
| Trench Road, Killymallaght Substation - Battery Energy Storage North-West of Trench Road, 500m North-West of Killymallaght Substation | Renewable Energy Systems Limited | 50 | In planning |
Battery storage in Co. Down
4 projects, 100 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Cavan Road - Battery Energy Storage System 165 metres north east of no. 113 Cavan Road | Electric Land | – | Consented, not built |
| Crabtree Road lands 63m to the n/e of 12 Crabtree Road Ballynahinch | BBESS | – | Consented, not built |
| Newtownards Electricity substation Lands south of Newtownards Electricity substation | Energy Trading Ireland Limited | – | Consented, not built |
| Skreen Road - Battery Energy Storage System 320m SW of 22 Skreen Road | Renewable Energy Systems Ltd | 100 | In planning |
Battery storage in Co. Fermanagh
3 projects, 90 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Battery Energy Storage System Development in Tyrone Lands Immediately East of Doogary Road and, 110m East of 8 and 10 Doogary Road, Omagh, Tyrone | Heron Storage Limited | 50 | Consented, not built |
| Doogary Road, Omagh - Battery Storage 160m Northwest Of No 80 Doogary Road, Omagh | Omagh BES Limited | 40 | Consented, not built |
| Battery Energy Storage Development in Omagh 150m South of 17 Skreen Road, Omagh | Western Grid Services Limited | – | In planning |
Battery storage in Co. Fermanagh & Omagh
2 projects, 121 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Classic Marble Showers, Omagh Road - Battery Energy Storage South of Classic Marble (Showers) Ltd, 185 Omagh Road, Garvaghy | Green Frog Power (Gort BESS) Limited | 73 | Consented, not built |
| Battery Energy Storage System Facility Development in Pomeroy Lands Approximately 120m S.W. of Tremoge SubStn. &, Approximately 73m Nw/o Tremoge, Pomeroy | Green Frog Power (Tremoge) Limited | 48 | Consented, not built |
Battery storage in Co. Lisburn & Castlereagh
1 project, 150 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Battery Storage System Development in Lisburn On Lands Approximately 230m East of No 2 Moneybroom Road, Lisburn | Lisburn Energy Limited | 150 | Consented, not built |
Battery storage in Co. Mid Ulster
3 projects, 270 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Battery Energy Storage System Development in Moneymore On Lands Approximately 140M SW of 9 Drumrot Road, Moneymore | J D Excavations Tyrone Limited | 20 | Consented, not built |
| Ballynakilly Road, Tamnamore Substation - Battery Energy Storage Sw of 127 Ballynakilly Road, 370M Nw of Tamnamore Substation, Coalisland | Anesco Limited | 250 | In planning |
| Drum Road, Cookstown - Solar & Battery Development 315 Metres South West of 232 Drum Road, Cookstown | Numalls Energy Ltd | – | In planning |
Battery storage in Co. Tyrone
8 projects, 312 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Derrymeen Battery Energy Storage System Lands Immediately NE of Tamnamore SubStn. and, C 150m SW of No 151 Ballynakilly | SSE Renewables | 100 | Under construction |
| Dungannon Energy Storage System 77a Ballynakilly Road, Dungannon, Co Tyrone | Low Carbon Storage Ireland | 50 | Under construction |
| Omagh Road, Garvaghy - Battery Energy Storage South of Omagh Road and Approx 150M North East of No. 174 Omagh Road Garvaghy | Heron Storage Limited | 50 | Consented, not built |
| Battery Energy Storage System in Newmills On Lands c 170m Se of No 17 Quintinmanus Road, Newmills | Exergy Solutions Limited | 24 | Consented, not built |
| Kells Substation Lands at, Doagh Road, Approximately 137m North East, Dungannon | Kells Bes (ABO Wind) | – | Consented, not built |
| Battery Energy Storage System Development in Drumquin Lands Located Approximately 245m E. of No 164 Dooish Rd. and, Approximately 26m, Drumquin | Lightsource Renewable Energy Ireland Limited | 87.8 | In planning |
| Gort Energy Storage South of Classic Marble Shower, 31 Garvaghy Bridge Road, Garvaghy, Dungannon | ENGIE Renewables | – | In planning |
| Power Generation Development in Dungannon Lands Approximate 500m Ne of 32 Drumkee Rd., Dungannon (To Rear of Tamnamore | Wilmar Llp | – | In planning |
Battery storage in Cornwall
31 projects, 390 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Saputo Dairy UK Land South West Of Sapulo Dair, Davidstow, Camelford, Cornwall | Lightsource BP | – | Operating |
| Tregonning Farm - Solar Farm & Battery Storage East Of Tregonning Farm Kestle Mill | European Energy | 47.5 | Under construction |
| Carland Cross Wind Farm - Storage Wind Farm Carland Cross Mitchell Newquay Cornwall | Scottish Power | 1 | Under construction |
| West Kingsmill, Landulph - Battery Storage West Kingsmill Landulph | Boultbee Brooks Real Estate Hereford Limited | 80 | Consented, not built |
| Indian Queens National Grid Substation, Domelick Hill - Battery Storage Indian Queens National Grid Substation Domelick Hill, B3279 St Dennis | EDF Energy Renewables (merged with Pivot Power) | 50 | Consented, not built |
| Landulph Substation, Ellbridge Lane - Battery Energy Storage Adj Landulph Substation, Ellbridge Lane, Landulph, Saltash | Conrad Energy | 49.9 | Consented, not built |
| Landulph, Ellbridge Lane - Battery Storage Facility Adjacent To Landulph National Grid 400kV Substation Ellbridge Lane Ellbridge | Pivoted Power Llp | 49.9 | Consented, not built |
| Indian Queens Sub-Station - Battery Storage South West Of Indian Queens Sub-station St Dennis | Prime Energy Development Limited & Valero Energy & Sambar Power | 47.5 | Consented, not built |
| Fair Park Solar Farm Adj Trewaters Bungalow, S/O Carland Cross, Trispen, Newquay | Downing Renewable Developments Llp | 20 | Consented, not built |
| Mount Stamper Road, Treverbyn - Battery Energy Storage Mount Stamper Road, Treverbyn, St Austell | Aldustria Energy Storage | 10 | Consented, not built |
| Trevol Business Park Land At, Trevol Business Park, Torpoint, Cornwall | Londonwide Properties | 10 | Consented, not built |
| Eden Project Central Processing Unit The Ed, Bodelva Road, Bodelva, Par, Cornwall | Good Energy | 5 | Consented, not built |
| Menear Road - Solar & Battery storage E/O Menear Farm Menear Road St Austell | Anesco Limited | 5 | Consented, not built |
| St Columb Major - Battery Energy Storage Facility S/O Carnanton Road, St Columb Major, St Columb | Aldustria Energy Storage | 5 | Consented, not built |
| Trekenning Farm - Battery Storage Facility & Co-Op S/o St Columb Major Industrial Estate, Carnanton Road, St Columb | Wessex Strategic | 5 | Consented, not built |
| Link Road - Battery Storage South Of Link Road | Aldustria Energy Storage | 3 | Consented, not built |
| Battery Box - Birch House - Micro Energy Storage Facility Birch House Moorlands Trading Estate Forge Lane Carkeel | AMP Energy Services Limited | 0.2 | Consented, not built |
| Guildford Road Industrial Estate - Battery Energy Storage Unit 1, Guildford Road Industrial Estate, Hayle | AMP Energy Services Limited | 0.2 | Consented, not built |
| St Austell Road, Treverbyn - Micro Energy Storage West Of St Austell Business Park Carclaze | AMP Clean Energy | 0.2 | Consented, not built |
| Tremorvah Industries, Threemilestone Industrial Estate - Battery Storage Outside Tremorvah Industries Threemilestone Industrial Estate | AMP Clean Energy | 0.2 | Consented, not built |
| Verge at Bickland Industrial Estate - Energy Storage System South Of Building 1 Fugro Seacore Bickland Industrial Park | AMP Clean Energy | 0.2 | Consented, not built |
| Victoria Business Park, Roche - Battery Energy Storage Victoria Business Park Roche | AMP Energy Services Limited | 0.2 | Consented, not built |
| Electricity Distrubution Site - Battery Storage Facility N/O Electricity Distrubution Site, Bojea, St Austell | Balance Power Projects Limited | – | Consented, not built |
| Langarth Garden Village Energy Centre Langarth Garden Village | Cornwall County Council | – | Consented, not built |
| Loggans Roundabout, Loggans Road - Battery Storage Land North Of Loggans Roundabout Loggans Road | Bauer Group | – | Consented, not built |
| Trevarthian Farmhouse - Solar PV Farm & Battery Energy Storage Trevarthian Farmhouse Plain An Gwarry Marazion | Trevarthian Renewables Limited | – | Consented, not built |
| Watering Lane Nursery, Lobbs Shop - Solar PV Panels & Battery Storage System South West Of Watering Lane Nursery Lobbs Shop | Keystone Ventures International Limited | – | Consented, not built |
| Trecurus Farm, Trecerus - Battery Storage West Of Trecurus Farm Trecerus | AMP Clean Energy | 0.2 | In planning |
| Burthy Row Farm, Trefullock Moor - Solar Farm & Battery Storage South West Of Burthy Row Farm Trefullock Moor Summercourt | JBM Solar Projects Limited | – | In planning |
| Great Roseveth Farm - Battery Energy Storage System Great Roseveth Farm, Sw/O Shortlanesend, Truro | Elgin Energy Esco Limited | – | In planning |
| The Cornwall Hotel Spa & Estate - Solar Array & Battery Storage The Cornwall Hotel Spa & Estate Pentewan Road Tregorrick | Belle Isle Hotels (Cornwall) Limited | – | In planning |
Battery storage in County Durham
17 projects, 1,926 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Hawthorn Grid Site - Battery Storage Hawthorn Grid Site Murton | Harmony Energy Limited | 49 | Operating |
| Rise Carr, Darlington / CLNR EES3-1 Rise Carr, Darlington | Northern Powergrid | 2.5 | Operating |
| Spennymoor Greener Grid Park E/O Spennymoor, National Grid Station, Thinford Lane, Thinford, Durham | Statkraft UK Limited | 200 | Consented, not built |
| South Thinford Lane, Thinford - Energy Storage S/O Spennymoor Electricity Substation, South Thinford Lane, Thinford, Durham | Renewable Energy Systems Limited | 99.9 | Consented, not built |
| Edge Lane, Maiden Law - Solar Farm & Battery Storage East Of Edge Lane Maiden Law | Lightsource BP | 45 | Consented, not built |
| Maiden, Annfield Plain - Energy Storage Land To The South West Of Morrison Industrial Estate And West Of Lanchester Road Maiden Law | Stephenson Mohl Development | 38 | Consented, not built |
| Barnard Castle - Solar Farm & Battery Storage System Barnard Castle Solar Farm, A688 Marwood, Barnard Castle | Farm Energy Company | 4 | Consented, not built |
| Addison Road, Toronto - Battery Energy Storage Addison Road, Toronto, Bishop Auckland | Ylem Energy Limited | – | Consented, not built |
| Hawthorn Pit Green Energy Park - Battery Energy Storage System The North West Of High Crows House Wheatley Hill | NatPower UK | 1,000 | In planning |
| Hallfield Farm, Easington - Battery Storage Nw/O Hallfield Farm, Easington, Peterlee | Zenobe Energy Limited | 300 | In planning |
| Woodlands, Windermere Road - Battery Energy Storage N/O Woodlands, Windermere Road, South Hetton, Durham | Build Studios | 90 | In planning |
| Hallfield Farm, Easington - Battery Storage Hallfield Farm Easington | Eden Renewables | 57 | In planning |
| Salters Lane - Solar Panels South Sharpley Farm, Salters Lane, Seaham | Grupotec Solar Uk 9 Limited | 18 | In planning |
| Highfield Energy Park South West Of Whittonstall | Exagen | 12.5 | In planning |
| Hackworth Road, North West Industrial Estate - Solar Panels North Of Hackworth Road North West Industrial Estate | ABEI Energy Green IX Limited | 10 | In planning |
| Murton Farm Steading, Murton - Micro Energy Storage System West Of 2 Murton Farm Steading The Village Murton | AMP Clean Energy | 0.2 | In planning |
| Porch House Farm, East Street - Battery Energy Storage System South & Se/O Porch House Farm, East Street, Hett, Durham | Integrum SPV 24002 Limited | – | In planning |
Battery storage in Coventry
2 projects, 90 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Benton Green Lane - Battery Energy Storage System Benton Green Lane | Tamara Ettenfield | 70 | Consented, not built |
| Hill House Farm, Coventry Road - Battery Energy Storage System Hill House Farm, Coventry Road, Berkswell | Root Power South Limited | 20 | In planning |
Battery storage in Cumbria
25 projects, 1,774 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Roosecote Roosecote coal and gas-fired power station, Barrow-in-Furness, Cumbria, UK | Centrica | 49 | Operating |
| Cleator Cleator, Cumbria | Low Carbon Storage Investment Company& VLC | 10 | Operating |
| Blackdyke Farm, Blackford - Battery Storage West of Blackdyke Farm, Blackford | Innova Renewables | 400 | Consented, not built |
| Low Harker Farm, Low Harker - Battery Storage Facility Low Harker Farm, Low Harker, Harker, Carlisle | Zenobe Energy Limited | 400 | Consented, not built |
| Harker Moss - Battery Energy Storage System Adj To Harker Substation Known As Harker Moss, Carlisle | ESB (Harker) Limited | 360 | Consented, not built |
| Eskrigg End Road, Old Hutton - Battery Energy Storage System South of Eskrigg End Road Old Hutton | Harmony MS Limited | 200 | Consented, not built |
| Todhills and Westlinton - Harker Battery Energy Storage Facility Ne/O Pine Glen, Westlinton, Carlisle | Windel Energy | 200 | Consented, not built |
| West Farm, Aspatria - Battery Storage Facility West Farm, West Street, Aspatria, Wigton | Net Zero Seventeen Limited | 50 | Consented, not built |
| Woodend And Moor Row, Egremont - Battery Energy Storage Btw Woodend And Moor Row Egremont | JT Energy Storage (Windel Energy) | 30 | Consented, not built |
| Grassing Rome Street - Battery Storage Former Railway Line and Bousteads Grassing, Rome Street, Carlisle | STOR 141 Limited | 15.5 | Consented, not built |
| Capon Tree Road - Battery Energy Storage Capon Generation Compound, Capon Tree Road, Brampton | Prime Energy Limited | 3 | Consented, not built |
| Roxane UK, Armathwaite - Solar Array & Battery Storage North of Roxane UK Ltd Armathwaite | Roxane UK Limited | 1 | Consented, not built |
| Lakeland Livestock Centre, Lakeland Agricultural Centre - Energy Storage East of Lakeland Livestock Centre, Lakeland Agricultural Centre | AMP Clean Energy | 0.2 | Consented, not built |
| Netherhall Rugby Club -Micro Energy Storage Facility Netherhall Rugby Club, Crosby Street, Maryport | AMP Energy Services Limited | 0.2 | Consented, not built |
| Dean Moor Solar Farm & Battery Storage 1.1km east of Lillyhall Industrial Estate, Workington | Firma Energy & IB Vogt | – | Consented, not built |
| Ewanrigg Farmhouse, Ewanrigg - Battery Storage Ewanrigg Farmhouse, Ewanrigg Lonning, Ewanrigg, Maryport | Anesco Limited | – | Consented, not built |
| Omega Proteins - Solar Farm & Battery Storage Omega Proteins, Penrith | Leo Group Limited | – | Consented, not built |
| Silver Howe, Flusco - Solar Array, Wind Turbines Battery Storage Adj Ullswater Heights Holiday Home & Lodge Park, Silver Howe, Flusco, Penrith | Leisure Resorts | – | Consented, not built |
| Telecommunication Site Moota - Micro Energy Storage Project Telecommunication Site Moota | AMP Clean Energy | – | Consented, not built |
| Roosecote Power Station, Rampside Road - Battery Energy Storage System Former Roosecote Power Station, Rampside Road, Barrow in Furness | Centrica Plc | 50 | In planning |
| Cleator Energy Storage Facility Extension Woodend | Cleator Battery Storage Limited | 5 | In planning |
| Abbey Road And Fairfield Lane - Micro Energy Storage Project Btw Abbey Road and Fairfield Lane | AMP Clean Energy | 0.2 | In planning |
| Blackdyke, Silloth - Battery Energy Storage The East of Buildings at Blackdyke, Silloth | Battery Box Limited | 0.2 | In planning |
| Salthouse Road - Micro Energy Storage South Side of Salthouse Road | AMP Clean Energy | 0.2 | In planning |
| Pow Motey, Langrigg - Solar Panels & Batteries Storage Pow Motey, Langrigg | J W Gate & Son | – | In planning |
Battery storage in Denbighshire
2 projects, 0.2 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Electricity Sub Station, Kinmel Park - Micro Energy Storage Facility Electricity Sub Station Kinmel Park, Bodelwyddan, Rhyl | AMP Clean Energy | 0.2 | Consented, not built |
| Gaerwen Wind Farm Land north west of Llandrillo | RWE Renewables UK Limited | – | In planning |
Battery storage in Derbyshire
39 projects, 2,576 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Calow Green Farm Calow Green Farm, Calow Green, Calow, Chesterfield, Derbyshire | Arlington Energy (formerly Enso Energy) | 20 | Operating |
| Waterswallows Road - Buxton Battery Storage Equipment STOR Facility, Waterswallows Road, Green Fairfield, Buxton | Atlantic Green | 15 | Operating |
| Oxcroft Solar Farm Oxcroft Stocking Ground Land A, Woodthorpe Road and Mill Lane, Stanfree, Chesterfield | Anesco | 1 | Operating |
| Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage W/O Inkersall Road, Staveley, Chesterfield | Low Carbon | – | Operating |
| Oaklands Solar Farm Project - Solar Farm & Battery Storage W/O Rosliston & E/O Walton on Trent, Swadlincote | BayWa r.e. UK Limited | 37.5 | Under construction |
| Fairfields Energy Storage System Land at Barr Hall Farm, Drakelow | Novus Renewable Services | 1,025 | Consented, not built |
| Stenson Lane - Battery Energy Storage System E/O Stenson Lane, Derby | Innova Renewables | 400 | Consented, not built |
| Barn Farm - Batter Energy Storage Facility Barn Farm, Land South of Walton Road, Swadlincote | Harmony Energy Storage | 200 | Consented, not built |
| Derby Road, Egginton - Battery Storage Facility Derby Road, Egginton, Derby | First Way Solar Limited | 100 | Consented, not built |
| Hurst Farm, Mansfield Road - Battery Energy Storage System Hurst Farm Mansfield Road Tibshelf | Lightsource BP | 99.9 | Consented, not built |
| Remembrance Way - Battery Energy Storage System The Se/O Remembrance Way, Derby | Root Power South Limited | 99 | Consented, not built |
| Caldwell Road - Battery Storage N/O The Royle Farm Business Park, Caldwell Road, Burton on Trent | Aludra Bess Limited & Renewable Energy Systems RES ltd (Beaufort) | 90 | Consented, not built |
| Park Road, Overseal - Battery Storage Facility S/O Park Road, Overseal, Swadlincote | Care Power Overseal | 50 | Consented, not built |
| Newton Wood Farm Newton Wood Farm, Newtonwood Lane, Newton, Alfreton, Derbyshire | Anesco | 49.9 | Consented, not built |
| Breach Farm - Energy Barn Breach Farm, Caldwell, Swadlincote | Bluefield Solar Income Fund | 40 | Consented, not built |
| Heanor Road - Battery Energy Storage System Ne/O Heanor Road,Heanor | Downing Energy Development Company Limited | 40 | Consented, not built |
| Landown Farm, Bakeacre Lane - Battery Energy Storage System Landown Farm, Bakeacre Lane, Findern, Derby | Integrum Renewable Energy Limited | 40 | Consented, not built |
| Marsh Lane, Gowhole - Energy Storage System Marsh Lane, Gowhole, High Peak | Novus Renewable Services Limited | 30 | Consented, not built |
| Lodge Farm, Calow - Battery Energy Storage System Lodge Farm, Top Road, Calow, Chesterfield | Enray Power | 25 | Consented, not built |
| Mount Road, Castle Gresley - Battery Storage Facility Mount Road Castle Gresley | Flexion Energy UK Storage Limited | 20 | Consented, not built |
| Dolly Lane, Buxworth - Battery Storage Facility & Sub Station Chinley House Farm, Dolly Lane, Buxworth, High Peak | W Rigby & Sons | 13 | Consented, not built |
| Commerce Park, Markham Lane - Micro Energy Storage Verge Outside M1 Commerce Park, Markham Lane, Duckmanton, Chesterfield | AMP Clean Energy | 0.2 | Consented, not built |
| Creswell Road, Clowne - Battery Storage Between Penny Hydraulics And Crossroads Business Park Creswell Road Clowne | AMP Clean Energy | 0.2 | Consented, not built |
| Seymour, Link Road - Micro Energy Storage Project W/O Seymour, Link Road, Woodthorpe, Chesterfield | AMP Clean Energy | 0.2 | Consented, not built |
| Westthorpe Fields Road, Killamarsh - Battery Storage Unit 7-7A Westthorpe Fields Road Killamarsh | Amp Clean Energy | 0.2 | Consented, not built |
| Magnavale Limited - Renewable energy plant Magnavale Limited, Park Road, Holmewood, Chesterfield | Magnavale Limited | 0.1 | Consented, not built |
| Barn Farm & Walton Road - Battery Storage North West of Barn Farm and to the South of Walton Road and the Former Drakelow Power Station | Drakelow Battery Limited | – | Consented, not built |
| Brook Farm, High Street - Battery Energy Storage Land At Brook Farm High Street Loscoe Heanor | Mercia Power Response Limited | – | Consented, not built |
| Buxton Road, Dove Holes - Battery Energy Storage System W/O Buxton Road, Dove Holes | Grenergy Renewables UK Limited | – | Consented, not built |
| Graphite Way, Hadfield - Battery Energy Storage Unit Compound B Backup Power Generation Facility, Graphite Way, Hadfield, Glossop | Mercia Power Response Limited | – | Consented, not built |
| Hallgate Farm - Battery Energy Storage Hallgate Farm, Hallgate Lane, Pilsley, Chesterfield | Enray Power | – | Consented, not built |
| Moto Donington Park - Solar Farm Land At Moto Donington Park M Junction 23A Derby East Midlands | Dunkin Rushton Limited & Moto Hospitality Limited | – | Consented, not built |
| Old Power House - Battery Energy Storage Unit Old Power House, Manners Avenue, Ilkeston | Mercia Power Response Limited | – | Consented, not built |
| Arleston Solar & Battery Energy Storage System Manor Farm, Arleston Lane, Arleston, Derby | Noventum Power Limited | 99.9 | In planning |
| Derby Road - Battery Energy Storage System E/O Derby Road, Ripley | Starlight Energy | 40 | In planning |
| Hardybarn Lane, Green Fairfield - Battery Energy Storage Facility W/O Hardybarn Lane, Green Fairfield, Buxton | S & L Energy Limited | 40 | In planning |
| Markham Road, Erin Road - Micro Energy Storage Markham Road, Near Erin Road Jnct, Duckmanton, Chesterfield | AMP Clean Energy | 0.2 | In planning |
| Lings Farm, Birkin Lane - Battery Energy Storage System To The Se/O Lings Farm, Birkin Lane, Temple Normanton, Chesterfield | Fuse Renewables Limited | – | In planning |
| Twyford Road, Twyford - Battery Energy Storage System North of Twyford Road, Twyford | Enso Green Holdings SS Limited | – | In planning |
Battery storage in Devon
54 projects, 1,631 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Langford Solar Farm Land at NGR 303437 103555 East, Langford Mill and Tye Farm, Cullompton, Devon | JBM Solar Projects | 35 | Operating |
| Barton Hill Industrial Park - Battery Energy Storage Facility Barton Hill Industrial Park, Barton Hill Way, Torquay | Power Initiatives Limited | 22.5 | Operating |
| Philip Dennis Food Service Land at Philip Dennis Food Ser, Brannam Crescent, Roundswell Business Park, Barnstaple, Devon | Philip Dennis Food Service | 3.8 | Operating |
| Junction 27, Westleigh - Battery Storage North of A361, Junction 27 Westleigh | Clearstone Energy | 400 | Consented, not built |
| Saundercroft Farm - Battery Energy Storage System Saundercroft Farm, Whimple, Exeter | Exeter Storage Limited (Statera Energy) | 290 | Consented, not built |
| Exeter Substation, Broadclyst - Battery Energy Storage Exeter Substation, Broadclyst, Exeter | Island Green Power | 125 | Consented, not built |
| Gammaton Barton Farm, Alverdiscott - Battery Energy Storage Gammaton Barton Farm, Bideford | Torridge District Council | 100 | Consented, not built |
| National Grid Substation - Battery Energy Storage System E/O National Grid Substation, Broadclyst, Exeter | Penso Power (BW ESS) | 100 | Consented, not built |
| Blackhill Quarry, Woodbury - Battery Energy Storage Facility Blackhill Quarry, Woodbury, Exeter | Clinton Devon Estates | 60 | Consented, not built |
| Saundercroft Road, Broadclyst - Battery Energy Storage System North Of Saundercroft Road Broadclyst | Pivoted Power Llp | 57 | Consented, not built |
| Stoneworthy - Battery Energy Storage System Near Lower Hopworthy, Pyworthy | Eelpower Limited | 49.9 | Consented, not built |
| North Tawton Primary Substation - Battery Storage S/O North Tawton Primary Substation, North Tawton | Balance Power Projects Limited | 30 | Consented, not built |
| Pinkworthy Farm, Pyworthy - Battery Storage Pinkworthy Farm Pyworthy | Private Developer | 25 | Consented, not built |
| Plymouth Stor Generation - Battery storage Plymouth Stor Generation, Faraday Road, Plymouth | Pulse Clean Energy | 20 | Consented, not built |
| Dunkeswell Airfield Dunkeswell Airfield, Dunkeswell Industrial Estate, Honiton | Conrad (Tiddlywink) Limited | 6.5 | Consented, not built |
| Council Green Waste Facility Exeter City Council, Canal Banks, Green Waste Facility, Exeter | Exeter City Council | 1 | Consented, not built |
| Petroc, Bolham Road - Battery Storage & Air Source Heat Pumps Petroc, Bolham Road, Tiverton | Petroc | 1 | Consented, not built |
| Langage Solar Park Langage Solar Park, Lower Langage Farm, Plymouth, Devon | Carlton Power | 0.5 | Consented, not built |
| Bittern Road - Energy Storage Facility Building On The North East Side Of Bittern Road, Sowton Industrial Estate, Exeter | AMP Energy Services Limited | 0.2 | Consented, not built |
| Blackhorse Lane - Micro Energy Storage The North Side Of Blackhorse Lane, Exeter | AMP Energy Services Limited | 0.2 | Consented, not built |
| Blackhorse Lane, Clyst Honiton - Energy Storage Facility North Side Of Blackhorse Lane Clyst Honiton | AMP Clean Energy | 0.2 | Consented, not built |
| Bucknell Way, Hacche Lane -Battery Energy Storage Bucknell Way, East and West Sides of Hacche Lane | AMP Clean Energy | 0.2 | Consented, not built |
| Butts Park, Newton Ferrers - Energy Storage Facility Butts Cross, Newton Ferrers, Plymouth | AMP Energy Services Limited | 0.2 | Consented, not built |
| Eastern Wood Road, Plympton - Batteries The South Side Rowdown Close, Eastern Wood Road, Langage Business Park, Plympton, Plymouth | AMP Energy Services Limited | 0.2 | Consented, not built |
| Electricity Sub Station, Tithebarn Way - Battery Energy Storage Facility Electricity Sub Station, Tithebarn Way, Exeter | AMP Energy Services Limited | 0.2 | Consented, not built |
| Exteter Airport, London Road - Micro Energy Storage Facility West Of Exteter Airport Clyst Honiton | AMP Clean Energy | 0.2 | Consented, not built |
| Fishleigh Road, Roundswell Business Park - Battery Energy Storage Fishleigh Road Roundswell Business Park | AMP Clean Energy | 0.2 | Consented, not built |
| George Hil, Avranches Avenue - Micro Energy Storage Facility W/O George Hil, Avranches Avenue, Crediton | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Greenacres, Roundswell - Micro Energy Storage Project West Side Of Greenacres, Roundswell, Barnstaple | AMP Clean Energy | 0.2 | Consented, not built |
| Hatchmoor Industrial Estate, Hatherleigh - Energy Storage Facility Hatchmoor Industrial Estate, Hatherleigh, Okehampton | AMP Clean Energy | 0.2 | Consented, not built |
| Higher Slade Road, Lower Slade - Micro Energy Storage Facility South East Side Of Higher Slade Road, Lower Slade, Ilfracombe | AMP Clean Energy | 0.2 | Consented, not built |
| Newton Road & Pottery Road, Bovey Tracey - Micro Energy Storage Between Newton Road And Pottery Road Bovey Tracey | AMP Clean Energy | 0.2 | Consented, not built |
| Pinhoe Road - Micro Energy Storage Facility E/O 358a Pinhoe Road, Exeter | AMP Energy Services Limited | 0.2 | Consented, not built |
| Wares Farm, Clyst Honiton - Micro Energy Storage Facility Wares Farm, Clyst Honiton | AMP Energy Services Limited | 0.2 | Consented, not built |
| Axe View Solar Farm, Wadbrook - Battery Storage Axe View Solar Farm Wadbrook | NextEnergy Capital LLP | – | Consented, not built |
| Deep Lane - Battery energy storage Deep Lane Plympton | Conrad Energy (Developments) II Limited | – | Consented, not built |
| Deptford Farm, Ebberley Hill - Battery Storage Deptford Farm, Ebberley Hill, Near Great Torrington, Umberleigh | Elgin Energy ES Co Limited | – | Consented, not built |
| East Rightadown Farm, Brandis Corner - Battery Storage East Rightadown Farm, Brandis Corner | Black Torrington Solar Limited | – | Consented, not built |
| Langdon Hospital, Langdon - Battery Energy Storage System Langdon Hospital, Langdon, Dawlish | Devon Partnership NHS Trust | – | Consented, not built |
| Linketty Lane Energy Project Linketty Lane | Balance Power Projects Limited | – | Consented, not built |
| Two Post Lane Two Post Lane, Spreyton, South Tawton, Crediton, Devon | Solar South West | – | Consented, not built |
| West Webbery Farm, The Water - Battery Energy Storage Woodtown East The Water | Enray SPV 241491 Limited | 99.4 | In planning |
| Hood Barton, Staverton - Battery Energy Storage System Hood Barton, Staverton, Totnes | Energy Planning | 99 | In planning |
| Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array Bulworthy Farm Stoney Cross | Noventum Power Limited | 50 | In planning |
| National Grid Axminster Substation National Grid Axminster Substa, Pound Road, Hawkchurch, Axminster, Devon | Harbour Energy | 49.9 | In planning |
| Petroc, Sticklepath - Battery Storage Petroc, Old Sticklepath Hill, Barnstaple | Petroc College Of Further Education | 1 | In planning |
| Hill Barton Business Park, Clyst St Mary - Battery Energy Storage Blackmore Road Clyst St Mary | AMP Energy Services Limited | 0.2 | In planning |
| Hunters Way, Culmstock - Energy Storage Facility Hunters Way Culmstock | AMP Clean Energy | 0.2 | In planning |
| Kingskerswell - Micro Energy Storage Facility Kingskerswell Torquay Road Newton Abbot | AMP Clean Energy | 0.2 | In planning |
| Newton Road, Bovey Tracey - Micro Energy Storage Facility Newton Road, Bovey Tracey, Newton Abbot | AMP Energy Services Limited | 0.2 | In planning |
| Tamerton Road, Woolwell - Micro Energy Storage The South Of Tamerton Road Woolwell | AMP Clean Energy | 0.2 | In planning |
| The Barton - Energy Storage Facility The Barton, North Tawton | Aggregated Micro Power Holdings Plc | 0.2 | In planning |
| Broad Path - Battery Storage Broad Path Landfill Site, Road From Down Farm Cross To Hillhead Quarry, Uffculme, Cullompton | Valencia Energy Limited | – | In planning |
| Daintons Storage, Yalberton Industrial Estate - Battery Storage Daintons Storage Yalberton Industrial Estate Alders Way | Power Initiatives Limited | – | In planning |
Battery storage in Dorset
17 projects, 748 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Hawkers Hill Energy Park Hawkers Hill Farm, : Shaftesbury Road, Motcombe | Tag Energy | 20 | Operating |
| Holes Bay Land at Sterte Avenue West, Poole | Harmony Energy | 15 | Operating |
| South Farm Solar Park South Farm, Field Dairy To Louse Lane, Spetisbury, Blandford Forum | Voltalia UK | 10 | Operating |
| Slepe Farm Slepe Farm, Dorset | Farm Power Apollo& Anesco | 0.3 | Operating |
| Dorset Green Battery Canford Renewable Energy, Canford Recycling Centre, Arena Way, Wimborne | Canford Renewable Energy Limited | – | Operating |
| Mannington Battery Energy Storage System Land off Holt Road | EDF Energy Renewables | 49.9 | Under construction |
| East Chickerell Court Farm - Battery Energy Storage System East Chickerell Court Farm, Chickerell, Weymouth | Statera Energy | 400 | Consented, not built |
| Shaftesbury Energy Park - Battery Storage System Hawkers Hill Farm Shaftesbury Road Motcombe | TagEnergy | 100 | Consented, not built |
| Eweleaze Spinney - Battery Energy Storage Facility N/O Eweleaze Spinney, Weymouth | Weymouth Battery Limited | 49.9 | Consented, not built |
| Holt Road - Battery Energy Storage Holt Road, Wimborne | EDF Energy Renewables | 47.5 | Consented, not built |
| Post Farm, Lytchett Minster - Battery Energy Storage Post Farm Lytchett Minster Poole | S4N Lytchett Limited | 32 | Consented, not built |
| Blandford Hill - EV Charging Station & Solar Farm Blandford Hill Winterborne Whitechurch | Naturalis Energy Developments Limited | 3 | Consented, not built |
| Whittle Boxland, Whittle Road - Energy Storage Facility Whittle Boxland, 23 Whittle Road, Ferndale Industrial Estate, Wimborne | AMP Energy Services Limited | 0.2 | Consented, not built |
| Fernbrook - Solar farm & Battery storage Park Farm Access To Park Farm Gillingham | Low Carbon UK Solar Investment Company Limited | – | Consented, not built |
| Wyld Meadow Farm - Battery energy storage Wyld Meadow Farm Pound Lane Monkton Wyld Bridport | NextEnergy Capital | – | Consented, not built |
| Caswell Farm, Common Lane - Battery Energy Storage Caswell Farm, Common Lane, Ryme Intrinseca, Sherborne | GridSource Limited | 20 | In planning |
| Waterditch Farm - Solar Farm & Battery Storage Hawthorn Road Waterditch Farm Christchurch | Meyrick Estate Management Limited | – | In planning |
Battery storage in Dumfries and Galloway
33 projects, 1,396 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Harestanes Windfarm Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway | ScottishPower Renewables | 100 | Under construction |
| Stranoch 2 New Luce, Newton Stewart | EDF Energy | 20 | Under construction |
| Sanquhar 2 Community Wind Farm Sanquhar II Wind Farm 7.5km So, New Cumnock, Kirkconnel, Sanquhar | Community Windpower | – | Under construction |
| Gretna Green Battery Storage South of Gretna 400kv Substation, Gretna | Gresham House Devco Pipeline | 456 | Consented, not built |
| Kilgallioch - Battery energy storage Wind Farm, Kilgallioch C72 From Gowlands Terrace, Barrhill To Council Boundary S/O Chirmorrie South From Barrhill, Barrhill, Girvan | Scottish Power Renewables | 100 | Consented, not built |
| Kellwood Road - Battery Storage Kellwood Road | Geocore Limited | 40 | Consented, not built |
| Loganhead Wind Farm off the B7068, approximately 4km northwest of Langholm and 15km northeast of Lockerbie | Muirhall Energy Limited | 36 | Consented, not built |
| Sandy Knowe Wind Farm Extension Sandy Knowe Wind Farm, Kirkconnell, Sanquhar | Executive Resource Group | 28.4 | Consented, not built |
| Troston Loch Wind Farm Troston Loch Wind Farm, New Abbey, West Of Moniaive, Dumfries, Dumfries and Galloway | EDF Energy Renewables | 20 | Consented, not built |
| Little Drum Solar Farm - Solar Park & Battery Storage Little Drum Near High Banks | Grupotec Solar UK 5 Limited | 12 | Consented, not built |
| Challoch, Barnkirk Road - Solar Array & Battery Energy Storage South Of Challoch, And To The West Of The U52w Barnkirk Road | Shropshire Council | 6 | Consented, not built |
| Shepherd's Rig Wind Farm Shepherds Rig Windfarm 5KM E/O, Carsphairn, Castle Douglas, Dumfries and Galloway | Boralex/Infinergy & Infinergy | 6 | Consented, not built |
| Knocknain Farm, Leswalt - Battery Storage Unit Knocknain Farm, Leswalt, Stranraer | Knocknain Developments Limited | 2 | Consented, not built |
| Cornharrow Wind Farm Battery Cornharrow Wind Farm, Land At Cornharrow, Dalry, Castle Douglas | EnergieKontor UK | – | Consented, not built |
| Fell Wind Farm Battery Fell Wind Farm, Moniaive, Thornhill | EnergieKontor UK | – | Consented, not built |
| High Nunton Farm - Solar Farm & Battery Storage The South & NW/O High Nunton Farm, Steading, Borgue, Castle Douglas | High Nunton Solar Limited | – | Consented, not built |
| Lochar Industrial Estate - Solar Panels & Battery Storage Lochar Industrial Estate | A&G King Timber Limited | – | Consented, not built |
| Manquhill, Carsphairn - Wind Farm Manquhill, 10.5km E/O Carsphairn, Castle Douglas | Energiekontor (UK) Limited | – | Consented, not built |
| Margree Windfarm Margree Near Holmhead St John's Town Of Dalry Castle, Douglas | Energiekontor (UK) Limited | – | Consented, not built |
| Mid Moile Wind Farm Land at Mid Moile, Mid Moile, Stranraer | EnergieKontor UK Limited | – | Consented, not built |
| Rammerscales Sawmill - Solar Array & Battery Storage Rammerscales Sawmill | A & G King Timber Limited | – | Consented, not built |
| Lagrae Battery Energy Storage System Queensberry Estate, off Lagrae Road, N/O A76, Kirkconnel village | Buccleuch Estates Limited | 400 | In planning |
| Quantans Hill Wind Farm Quantans Hill Wind Farm, Carsphairn, Castle Douglas | Vattenfall Wind Power Limited | 50 | In planning |
| Bloch Wind Farm & Battery Storage (Solway Bank Extension) Solwaybank, Allfornought Hill, Langholm | Renewable Energy Systems (RES) | 45 | In planning |
| Lairdmannoch Energy Park 7km north east of Gatehouse of Fleet | Wind2 & Octopus Energy | 20 | In planning |
| High Mark Wind Farm - Wind Turbines High Mark Wind Farm 5km Ne/O Cairnryan, 7.5km Se/O New Luce, Newton Stewart | Wind Estate (UK) Ltd | 15 | In planning |
| Hopsrig Wind Farm west of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie | Muirhall Energy Limited | 14.1 | In planning |
| West Scales Energy Park West Scales Energy Park Approx. 3km West Of Gretna | West Scales Windfarm Limited | 12 | In planning |
| Larbrax Wind Farm Larbrax Windfarm, Appx 9 Kilometres Km W/O Stranraer, Stranraer | Orsted Onshore UK Limited | 10 | In planning |
| Craig Nab Wind Energy Hub - Wind Farm 14km E/O Craig Nab Wind Energy Hub, Stranraer | Belltown Power Limited | 3.8 | In planning |
| Blair Hill Wind Farm Newton Stewart | RES Limited | – | In planning |
| Euchanhead Wind Farm App 10km To The SW Of Sanquhar, Euchanhead Renewable Energy De, Sanquhar | ScottishPower Renewables UK Limited | – | In planning |
| Glenvernoch Wind Farm Glentrool, Newton Stewart | Energiekontor (UK) Limited | – | In planning |
Battery storage in Dundee
1 project, 50 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| New Craigie Retail Park - Battery Energy Storage 1 New Craigie Road, New Craigie Retail Park | Whirlwind Renewables | 50 | Consented, not built |
Battery storage in Dyfed
25 projects, 50 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Heol Aur, Dafen Industrial Estate - Battery Storage System Heol Aur, Dafen Industrial Estate | Westfa Limited | 25 | Consented, not built |
| MOD Pendine, Llanmiloe - Solar Panels MOD Pendine, Llanmiloe, Carmarthenshire | QinetiQ | 8.8 | Consented, not built |
| Andrew Street - Micro Energy Storage A484 Near Andrew Street | AMP Clean Energy | 0.2 | Consented, not built |
| Anthony Way, Cillefwr Industrial Estate - Battery Energy Storage Facility Rear of Units 19 and 20 Anthony Way, Cillefwr Industrial Estate, Johnstown | Green Frog Power Limited | 0.2 | Consented, not built |
| Bridge Innovation Centre, Pembrokeshire Science - Micro Energy Storage Bridge Innovation Centre, Pembrokeshire Science And Technology Park, Pembroke Dock | AMP Clean Energy | 0.2 | Consented, not built |
| Castle Quarry - Micro Energy Storage Btw Castle Quarry And Haven Court, Pembroke | AMP Clean Energy | 0.2 | Consented, not built |
| Consort Equipment Products - Micro Energy Storage Consort Equipment Products, Thornton Industrial Estate, Milford Haven | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Lower Trostre Road - Micro Battery Storage Lower Trostre Road | AMP Clean Energy | 0.2 | Consented, not built |
| Meyrick Street - Micro Energy Storage System Btw King Street And Meyrick Street, Pembroke Dock | AMP Clean Energy | 0.2 | Consented, not built |
| North Avenue, Llanelli Workshops -Micro Energy Storage North Avenue, Llanelli Workshops, Trostre Industrial Park | AMP Clean Energy | 0.2 | Consented, not built |
| Parc Y Scarlets, Pemberton Athletics Track - Micro Energy Storage Verge To The N/O Parc Y Scarlets, Near Pemberton Athletics Track, Llanelli | AMP Clean Energy | 0.2 | Consented, not built |
| Park Street -Micro Energy Storage Betws Park Workshops, Park Street, Ammanford, Dyfed | AMP Clean Energy | 0.2 | Consented, not built |
| Station Road, Brunel Quay - Micro Energy Storage Verge At Station Road, Brunel Quay, Neyland, Milford Haven | AMP Clean Energy | 0.2 | Consented, not built |
| The Beacon Enterprise Centre, Heol Aur - Micro Battery Storage The Beacon Enterprise Centre, Heol Aur | AMP Clean Energy | 0.2 | Consented, not built |
| Ty Parc Yr Hun, Ffordd Y Rhyd - Micro Energy Storage Project Ty Parcyrhun, Ffordd Y Rhyd | AMP Clean Energy | 0.2 | Consented, not built |
| Waterloo Industrial Estate, Eastern Avenue - Micro Energy Storage Waterloo Industrial Estate, Eastern Avenue, Pembroke Dock | AMP Clean Energy | 0.2 | Consented, not built |
| Withybush Road, Fishguard Road - Micro Battery Storage where Withybush Road meets fishguard Road, Haverfordwest | AMP Clean Energy | 0.2 | Consented, not built |
| Withybush Road, Withybush Industrial Estate - Micro Energy Storage System S/O Withybush Road, Withybush Industrial Estate, Haverfordwest | AMP Clean Energy | 0.2 | Consented, not built |
| Dyfed Powys Police Headquarters, Llangunnor Road - BESS Dyfed Powys Police Headquarters, Llangunnor Road, Llangunnor, Carmarthen | Dyfed Powys Police | – | Consented, not built |
| White House Farm White House Farm, Freystrop, Haverfordwest | Qair UK | 12 | In planning |
| Capel Road, Bryngwyn Bach - Micro Energy Storage The East of Capel Road, Bryngwyn Bach | AMP Clean Energy | 0.2 | In planning |
| Dyfatty Park Industrial Estate - Micro Energy Storage Dyfatty Park Industrial Estate | AMP Clean Energy | 0.2 | In planning |
| Llandovery Rugby Football Club, Church Bank - Micro Energy Storage Llandovery Rugby Football Club, Church Bank | AMP Clean Energy | 0.2 | In planning |
| Pavillion Cafe, Pwll Road - Micro Energy Storage Pavillion Cafe, Pwll Road, Pwll, Llanelli | AMP Clean Energy | 0.2 | In planning |
| St Daniels Hill - Micro Energy Storage Project St Daniels Hill And St Daniels Drive, Pembroke | AMP Clean Energy | 0.2 | In planning |
Battery storage in East Ayrshire
3 projects, 40.9 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Knockkippen Wind, Solar & Battery Farm Knockkippen Moss | Falck Renewables & REG Windpower | 16 | Consented, not built |
| Hare Craig Windfarm Land At Hare Craig, Muirkirk, Cumnock, Strathclyde | EnergieKontor UK | 13.9 | Consented, not built |
| Enoch Hill, Dalmellington - Battery Storage Enoch Hill, 2 Wind Farm, Dalmellington | RWE Renewables Uk Limited | 11 | Consented, not built |
Battery storage in East Dunbartonshire
1 project, 560 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Whitehall Battery Storage Cochno Road, East Bearsden | Apatura | 560 | Consented, not built |
Battery storage in East Lothian
9 projects, 1,307 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Aikengall II Community Wind Farm Battery Aikengall II Community Wind Fa, Innerwick, Dunbar, Lothian | Community Wind Power | 80 | Operating |
| Braxbess Battery Storage Barns Ness Terrace, Innerwick | Braxbess Limited | 650 | Consented, not built |
| Smeaton Battery Energy Storage System Smeaton, Whitecraig, East Lothian | Kona Energy | 228 | Consented, not built |
| Dolphingstone Farm - Battery Energy Storage System Dolphingstone Farm, Tranent | RNA Energy Limited | 63 | Consented, not built |
| Dunbar Grid Substation - Battery Storage The N/O Dunbar Grid Substation, Dunbar | FRV TH Powertek Limited | 49.9 | Consented, not built |
| Aikengall, Innerwick - Battery Energy Storage Aikengall Innerwick Dunbar | Redstone Rig Storage Limited | 19.9 | Consented, not built |
| Thorntonloch, Innerwick - Branxton Energy Storage Facility Thorntonloch, E/O Innerwick, Dunbar | EastCoastGridServices Limited | – | Consented, not built |
| Newlands Hill Wind Energy Hub Lammermuir Hills, Gifford | Belltown Power Limited | 136 | In planning |
| Springfield - Solar Farm & Battery Energy Storage Springfield, 50m N/o Oldhamstocks & 7.8km SE/O Dunbar | Voltalia UK Limited | 80 | In planning |
Battery storage in East Riding of Yorkshire
23 projects, 2,960 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Eggborough Battery Energy Storage System Roall Lane, Kellington, Goole | SSE Renewables Ireland Limited | 550 | Consented, not built |
| Eggborough Power Station, Selby Road - Battery Storage Eggborough Power Station Selby Road Eggborough | Eggborough Power Limited | 500 | Consented, not built |
| Thornton Battery Storage West Of Waplington Manor Waplington Lane Allerthorpe | Greenfield Energy Developments Limited | 400 | Consented, not built |
| Ryedale Farm, Seaton Common Lane - Battery Energy Storage N/O Ryedale Farm, Seaton Common Lane, Melbourne, York | RPC Elmya Carnation Foxdale Limited | 300 | Consented, not built |
| Staithes Road, Saltend -Battery Energy Storage System North Of Westfield View Staithes Road Preston | SFEL One Limited | 240 | Consented, not built |
| Corner Of Weeland Road, Lunn Lane - Battery Storage Facility Lunn Lane Kellington | Newton Energi Limited | 200 | Consented, not built |
| Kingston International Business Park - Battery Energy Storage System N/O Kingston International Business Park, Hull | Story Contracting Limited | 200 | Consented, not built |
| Tara Melbourne Road, Thornton - Battery Energy Storage Facility West Of Tara Melbourne Road Thornton | Rewe 9 Limited | 200 | Consented, not built |
| Clough Road - Battery Energy System S/O Clough Road, Kingston Upon Hull | GAM Capital Limited | 130 | Consented, not built |
| Station Road, Carlton - Battery Energy Storage System E/O Station Road, Carlton, Goole | Root Power (North) Limited | 99 | Consented, not built |
| Field House Solar Farm Field House Farm, Main Road, Routh, Beverley | Albanwise Synergy Limited | 40 | Consented, not built |
| Back Lane, Skerne - Solar Farm & Battery Storage Back Lane, Skerne, Driffield | BayWa r.e. UK Limited | 30 | Consented, not built |
| Humberfield Recycling Centre - Battery Energy Storage Facility Nw/O Humber Field Roundabout, Hessle | FCC Environment | 30 | Consented, not built |
| Green Frog Power, Great Field Lane - Battery Energy Storage System Standby Power Plant, Great Field Lane | Pulse Clean Energy | 20 | Consented, not built |
| Hull East Stor Generation Compound - Battery energy storage Hull East Stor Generation Compound, Great Field Lane, Somerden Road, Kingston Upon Hull | Green Frog Power 214 Limited | 20 | Consented, not built |
| Bridlington And District Hospital, Bessingby Road - Battery Unit Bridlington And District Hospital Bessingby Road | York Teaching Hospital NHS Foundation Trust | 0.4 | Consented, not built |
| Creyke Beck Substation - Battery Storage S/O Creyke Beck Substation, 4875 Park Lane, Cottingham | Albanwise Synergy Limited | – | Consented, not built |
| East Yorkshire Solar Farm Howden, Goole | Boom Power | – | Consented, not built |
| Newton Farm, Tongue Lane - Solar Farm & Battery Storage North West Of Newton Farm Tongue Lane Gilberdyke | Newstead Farm | – | Consented, not built |
| Old Chalk Pit, West Back Side - Three Oaks Renewable Park W/O Old Chalk Pit, West Back Side, Haisthorpe, Driffield | Ridge Clean Energy Limited | – | Consented, not built |
| Peartree Hill Solar Farm Meaux, Wawne, Beverley | JBM Solar & RWE | – | Consented, not built |
| Scurf Dyke - Solar Farm Ne/O Eastfield Farm, Stockbridge Lane, Hutton Cranswick, Driffield | BayWa r.e. UK Limited | – | Consented, not built |
| South Cliff Holiday Park Solar Farm, Pioneer Road - Battery Storage South Cliff Holiday Park Solar Farm Pioneer Road Wilsthorpe | East Riding Of Yorkshire Council | 0.4 | In planning |
Battery storage in East Sussex
22 projects, 1,514 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Arlington Energy Battery Storage Potmans Lane | Arlington Energy Limited | – | Under construction |
| Stable Green, Sand Hill Lane - Battery Energy Storage System Farmland To The Nw/O Sand Hill Lane, Halland, Uckfield | Lightrock Power | 600 | Consented, not built |
| Moor Hall Farm, Moor Hall Drive - Battery Energy Storage Facility Moor Hall Farm, Moor Hall Drive, Ninfield, Battle | Balance Power Projects Limited | 400 | Consented, not built |
| Eastlands Farm, Catsfield - Catsfield Battery Energy Storage Facility Eastlands Farm, Catsfield, Battle | Masdar Arlington Energy | 240 | Consented, not built |
| Colbrans Farm Estate, Laughton - Battery Storage Colbrans Farm Estate, Laughton, Lewes | Innova | 30 | Consented, not built |
| Lower Mays Farm Solar Farm Selmeston | Unknown | 8.8 | Consented, not built |
| Suncoast Battery Storage Land Adjacent Eastbourne Golf Club Lottbridge Drove Eastbourne | Low Carbon Solar Park 20 Limited | 5 | Consented, not built |
| Castleham Road - Energy Storage System Verge off Castleham Road, St Leonards on Sea | AMP Energy Services Limited | 0.2 | Consented, not built |
| Finmere Road - Battery Storage Finmere Road | AMP Clean Energy | 0.2 | Consented, not built |
| Boreham Hill, Boreham Street - Battery Energy Storage System Boreham Hill, Boreham Street, Hailsham | Pelagic Energy | – | Consented, not built |
| Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Cemex Brighton Plant & Wharf, Wellington Road, Portslade, Brighton | Cemex UK Operations Limited | – | Consented, not built |
| Olives Farm, Hooe - Battery Energy Storage Facility Olives Farm, Hooe, Ninfield | Balanced Grid Solutions Limited | – | Consented, not built |
| Ringmer - Solar array/Battery storage E/O Uckfield Road (A26) Ringmer | Ouse Valley Energy Services Company CIC | – | Consented, not built |
| Pashley Farm, Ninfield Road - Battery Energy Storage System Pashley Farm, Ninfield Road, Ninfield, Bexhill on Sea | Elgin Energy Esco Limited | 130 | In planning |
| Catsfield Christmas Tree Farm, The Stream - Battery Energy Storage System Catsfield Christmas Tree Farm, The Stream, Catsfield, Battle | Elgin Energy Esco Limited | 99.9 | In planning |
| Castleham Road - Battery Storage Castleham Road | AMP Clean Energy | 0.2 | In planning |
| Queensway & Napier Road - Battery Energy Storage The Intersection Of Queensway & Napier Road | AMP Clean Energy | 0.2 | In planning |
| Fastener House, Bolton Close - Batter Storage Fastener House, Bolton Close, Bellbrook Industrial Estate, Uckfield | Waremoss Limited | – | In planning |
| Kilnwood Farm - Greener Grid Park & Energy Storage Kilnwood Farm, Potmans Lane, Lunsford Cross, Bexhill on Sea | Statkraft UK Limited | – | In planning |
| Kilnwood Farm, Lunsford Cross - Energy Storage Kilnwood Farm (Land adjacent to Ninfield National Grid Sub), Potmans Lane, Lunsford Cross, Ninfield | Statkraft UK Limited | – | In planning |
| Kilnwood Farm, Lunsford Cross - Energy Storage Kilnwood Farm, Potmans Lane, Lunsford Cross, Catsfield | Statkraft UK Limited | – | In planning |
| Staverton Nursery, Eastbourne Road - Battery Storage Staverton Nursery,Eastbourne Road, Halland,Lewes | Staverton Nursery | – | In planning |
Battery storage in Essex
63 projects, 2,381 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Thurrock Flexible Generation Plant Thurrock Flexible Generation Plant Fort Road Tilbury | Thurrock Power | 150 | Operating |
| Dollymans Storage Land North Of National Grid, Doublegate Lane, Rawreth, Wickford | Statera Energy & Dollymans Storage | 100 | Operating |
| Crouch Solar Farm Park Farm, Dunton Road, Brentwood | Low Carbon Storage | 49.9 | Operating |
| Pelham LAND NORTH OF PELHAM SUBSATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP’S STORTFORD | Statera Energy& InfraRed Capital | 49 | Operating |
| Lower Dunton Road Battery Storage Facility Sub Station, Lower Dunton Road, Basildon | Eku Energy | 28 | Operating |
| Claredown Farm Land at Claredown Farm, Hickford Hill, Belchamp St Paul | Zenobe (formerly Energy Reservoir 15) | 20 | Operating |
| Hutton Battery Storage (Lower Road) Land West Of Wash Road Hutton | Gore Street Capital & Flexitricity Limited | 10 | Operating |
| Nevendon Nevendon | Belectric UK & Foresight | 10 | Operating |
| Nevendon Battery Storage Extension Stevenson Farm Southend Arterial Road Cranes Industrial | Belectric Solar Limited | 5 | Operating |
| London Distribution Park London Distribution Park, Windrush Road, Tilbury, Essex | Amazon UK Services & Push Energy | 3.8 | Operating |
| Birch Solar Farm & Battery Storage NW/O Hardys Green, Birch Colchester | Low Carbon Solar Park 22 Limited | – | Operating |
| Periwinkle Hall - Links Solar photovoltaic farm & Battery storage E/O Periwinkle Hall, Links Road, Perry Green, Bradwell, Braintree | Low Carbon Limited | – | Operating |
| Braintree Road, Cressing - Battery Storage Electricity Sub Station Site, Braintree Road, Cressing, Braintree | Pivot Power (EDF Renewables) | 57 | Under construction |
| South Fambridge Hall - Solar farm & Battery storage South Fambridge Hall, Fambridge Road, South Fambridge, Rochford | British Solar Renewables & BayWa r.e. UK Limited | 20 | Under construction |
| Slamseys Energy Storage Land North Of Slamseys Farm, Blackley Lane, Great Notley, Essex | Gridserve Energy Storage | 10 | Under construction |
| Bulphan Fen Solar Farm & Battery Storage Land Adjacent Fen Farm Judds Farm And Part Of Bulphan Fen Harrow Lane Bulphan | Warley Green Limited | – | Under construction |
| Fairlawns Farm, Chelmsford Road - Battery Energy Storage Fairlawns Farm, Chelmsford Road, Rayleigh | Gresham House Devco Pipeline | 480 | Consented, not built |
| Gateway Energy Centre - Battery Energy Storage East 2 Baltic Avenue Stanford Le Hope | Intergen Limited | 450 | Consented, not built |
| Southlands Solar Farm & Battery Storage Land South Of Southlands Cottages Runwell Road Runwell | Enso Green Holdings Limited & Cero Generation | 57 | Consented, not built |
| Ardleigh Road, Little Bromley - Battery Energy Storage Adj Lawford Grid Substation Ardleigh Road Little Bromley | Lawford Power Limited | 50 | Consented, not built |
| Brentwood nergy Storage System Hutton Country, Park Wash Road, Hutton | Anesco Limited | 49.9 | Consented, not built |
| Maldon Hall Land North West Of Maldon Hall, Spital Road, Maldon | Green Investment Group | 40 | Consented, not built |
| Thrift Solar Farm and BESS E/O Tawney Common, Theydon Mount, Epping | IB Vogt UK Limited | 30 | Consented, not built |
| Kentish Farm 2 - Battery Energy Storage Kentishes Farm, Kentish Farm Road, Stisted, Braintree | Push Energy | 22.5 | Consented, not built |
| Lime Kilns Energy Centre - Battery Energy Storage Flexitricity Lime Kilns Energy Centre Lower Dunton Road Bulphan | Flexitricity | 6 | Consented, not built |
| Stephenson Road - Urban Reserve Flexible Energy Facility C P S House, Stephenson Road, Colchester | AMP Energy Services LImited | 6 | Consented, not built |
| Dengie - Solar PV array S/O Keelings Road Dengie | British Solar Renewables | 5 | Consented, not built |
| Burnt Mills Industrial Estate, Hovefields Avenue - Battery Energy Storage Burnt Mills Industrial Estate Hovefields Avenue | AMP Clean Energy | 0.2 | Consented, not built |
| Enterprise Drive, Springwood Drive - Batter Energy Storage Enterprise Drive, Springwood Drive | AMP Clean Energy | 0.2 | Consented, not built |
| Grange Box, Grange Way - Battery Storage Grange Box, Heath Business Park, Grange Way, Colchester | AMP Clean Energy | 0.2 | Consented, not built |
| Miles Gray Road, Steeple View - Micro Energy Storage Miles Gray Road, Steeple View, Noak Hill, Basildon | AMP Clean Energy | 0.2 | Consented, not built |
| Pods Brook Road - Battery Distribution Jnct Rayne Road And Pods Brook Road, Braintree | AMP Clean Energy | 0.2 | Consented, not built |
| Pumping Station, Corran Way - Micro Energy Storage System Land Lying To The N/O Mardyke, South Ockendon | AMP Clean Energy | 0.2 | Consented, not built |
| Pumping Station, West Thurrock Way - Micro Energy Storage Pumping Station, West Thurrock Way, West Thurrock, Grays | AMP Clean Energy | 0.2 | Consented, not built |
| Robjohns Road - Micro Energy Storage Adjacent Elettra House Westway | Battery Box Limited | 0.2 | Consented, not built |
| Spinks Lane - Micro Energy Facility Adj 2 Spinks Lane, Witham | AMP Clean Energy | 0.2 | Consented, not built |
| Telford Way, Stephenson Road - Micro Energy Battery Storage Electricity Sub Station, Severalls Industrial Park, Stephenson Road, Colchester | AMP Clean Energy | 0.2 | Consented, not built |
| Tesco Extra, Hazelmere - Battery Energy Storage Tesco Extra, Hazelmere, Pitsea, Basildon | Tesco Plc | 0.2 | Consented, not built |
| Verge By Ricksones School, Rickstones Road - Micro Energy Storage Verge By Ricksones School, Rickstones Road, Witham | AMP Clean Energy | 0.2 | Consented, not built |
| Verge Fronting, Westway - Micro Energy Storage Verge Fronting, 29 Westway, Widford, Chelmsford | AMP Clean Energy | 0.2 | Consented, not built |
| Via Urbis Romanae, Whitmore Drive - Micro Energy Storage Via Urbis Romanae, Whitmore Drive, Colchester | AMP Clean Energy | 0.2 | Consented, not built |
| Visteon Engineering, Springfield Lyons Approach - Micro Energy Storage Visteon Engineering Services Limited, 1 Springfield Lyons Approach, Chelmer Village, Chelmsford | AMP Clean Energy | 0.2 | Consented, not built |
| Warley Energy Hub, Ockenden - Battery Energy Storage System Warley Energy Hub, St Marys Lane North, Ockenden, Upminster | Clearstone Energy Limited | 0.2 | Consented, not built |
| Waste Transfer Station, Ardleigh - Battery Energy Storage Waste Transfer Station, Ardleigh, Colchester | AMP Clean Energy | 0.2 | Consented, not built |
| West Road - Micro Energy Storage Facility W/o West Point Business Park, West Road, Harlow | AMP Clean Energy | 0.2 | Consented, not built |
| Aveley Landfill, Sandy Lane - PV Solar Array & Battery Energy Storage Infinis Ltd Aveley Landfill Sandy Lane Aveley | Infinis Energy Services Limited | – | Consented, not built |
| Barleylands Solar Farm Barleylands Barleylands Road Billericay | Enso Energy Limited | – | Consented, not built |
| Chesterford Park - Green Energy Hub Chesterford Park, Little Chesterford, Saffron Walden | Chesterford Park (General Partner) Limited | – | Consented, not built |
| Felsted School Road - Solar Photovoltaic Farm & Battery storage E/O School Road And Main Road, Felsted School Road, Felsted, Uttlesford | Clearstone Energy | – | Consented, not built |
| Hales Farm - Battery Storage Hales Farm, High Cross Lane, Dunmow | Hales Farms Limited | – | Consented, not built |
| Hill Farm Solar Park & Battery Storage (Hanningfield Green) Land West Of Hill Farm Pan Lane East Hanningfield Chelmsford | Gulermak Renewables Ltd | – | Consented, not built |
| Longfield north east of Chelmsford and North of the A12 between Boreham and Hatfield Peverel | Longfield Solar Energy Farm Limited (part of EDF Renwables) | – | Consented, not built |
| Marshes Farm Solar Farm At, Marsh Road, Burnham-On-Crouch, Essex | One Planet | – | Consented, not built |
| Parsonage Farm - Solar PV Farm & Battery Storage Parsonage Farm, Forest Hall Road, Stansted | Trilogy Logistics REIT Limited | – | Consented, not built |
| Thaxted - Solar farm Land West Of Thaxted | Low Carbon Limited | – | Consented, not built |
| Lower Dunton Road - Battery Energy Storage System Lower Dunton Road, Langdon Hills, Basildon | LJ Construction UK Limited | 368 | In planning |
| Clay Tye Farm - Energy Storage Facility Clay Tye Farm, Upminster | London & Essex Energy Limited | 200 | In planning |
| Atcost Road - Battery Storage Facility 11 Atcost Road, Barking | O&G Group Limited | 100 | In planning |
| Sewage Pumping Station, Rushbottom Lane - Micro Energy Storage Sewage Pumping Station, Rushbottom Lane, Benfleet | AMP Clean Energy | 0.2 | In planning |
| Sewage Pumping Station, Worlds End Lane - Battery Energy Storage Sewage Pumping Station, Worlds End Lane, Feering, Colchester | AMP Clean Energy | 0.2 | In planning |
| Sewage Treatment Works, Lawford Lane - Micro Energy Storage Sewage Pumping Station Lawford Lane Writtle | AMP Clean Energy | 0.2 | In planning |
| Land North of Horsley Cross - Solar Farm & Battery Energy Storage N/O A120 Horsley Cross, Colchester | Mespil Solar Energy | – | In planning |
| Southend Arterial Road - Battery Energy Storage N/O Southend Arterial Road (A127), Wickford | Enso Green Holdings Limited | – | In planning |
Battery storage in Falkirk
3 projects, 43.4 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Merchiston Industrial Estate, Smith Street - Battery Storage The South East Of Merchiston Industrial Estate Smith Street | Falkirk Power Limited | 43 | Under construction |
| Abbotsinch Road - Micro Energy Storage Facility W/O Units 7-11, Abbotsinch Road, Grangemouth | AMP Clean Energy | 0.2 | Consented, not built |
| Unit 2, Tamfourhill Avenue - Micro Energy Storage The E/O Unit 2, Tamfourhill Avenue | AMP Clean Energy | 0.2 | Consented, not built |
Battery storage in Fife
31 projects, 1,427 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Camilla Battery Storage Camilla Farm Auchtertool Kirkcaldy | NextEnergy Solar Fund & Eelpower Limited | 50 | Operating |
| Pitkevy Farm - Battery Storage Facility Pitkevy Farm, Leslie, Glenrothes | Intelligent Land Investments | – | Operating |
| Ferrymuir Land west of Ferrymuir, South of Westfield Road, Cupar | Gore Street Energy Storage Fund | 49.9 | Under construction |
| Dunfermline North - Solar Photovoltaic Array/Battery storage S/O Lochead Landfill Site | Dunfermline Solar Limited (AMPYR Solar Europe) | 20 | Under construction |
| Balsillie Avenue - Roaring Hill Energy Storage Facility E/O Balsillie Avenue, The S/O The Limekilns, Glenrothes | Tag Energy UK | 19.9 | Under construction |
| Kincardine Battery Storage West of Kincardine substation | Gresham House Devco Pipeline Limited | 342 | Consented, not built |
| Mossmorran Battery Storage East of Mossmorran substation, Auchtertool, Kirkcaldy | Gresham House Devco Pipeline | 300 | Consented, not built |
| Duniface Gas Peaking Plant - Battery Energy Storage System Duniface Gas Peaking Plant, Duniface Farm, Leven | Forsa Energy Gas Holdings Limited | 49.9 | Consented, not built |
| Newburgh Road, Abernethy - Battery Storage 60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy | CBS Solar Assets UK Limited | 49.9 | Consented, not built |
| Gleniston, Auchtertool - Battery Storage Facility Battery Storage Facility Gleniston Auchtertool | Harmony Energy Limited | 49.5 | Consented, not built |
| Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage 300M East Of Wester Balbeggie Cottages Wester Balbeggie Farm Balbeggie Avenue Balbeggie Thornton | Relay Balbeggie Limited | 49 | Consented, not built |
| Ballingall Farm, Leslie - Battery Energy Storage System Ballingall Farm, Leslie, Glenrothes | EcoDev Group Limited | 43 | Consented, not built |
| South Pargillis - Battery Storage Growforth Limited, South Pargillis, Clockluine Road, Hillend, Dunfermline | Infinis Energy Services Limited | 42 | Consented, not built |
| STOR Field 9 Land East of North Road, Inverkeithing, Dunfermline, Fife | Capbal | 37 | Consented, not built |
| Wemyss Estate - Randolph Solar Farm & Battery Energy Storage Land adj. to former Nant-Y-Gwy, Landfill site, Pentre, Mid Glamorgan | Elgin Energy | 25 | Consented, not built |
| Strathruddie, Kinglassie - Solar farm Land At Strathruddie Kinglassie | Renewable Connection Developments Limited | 20 | Consented, not built |
| Westfield Solar Farm & Battery Westfield O C C S | Brockwell Energy Limited | 20 | Consented, not built |
| Land North of Thornton Road Land North of, Thornton Road, Redhouse Grid Substation, Kirkcaldy, Fife | South Redhouse | 19.9 | Consented, not built |
| Nettly Burn Renewable Energy Park Knockhill Racing Circuit, Dunfermline | Grupotec Solar UK 4 Ltd | 15 | Consented, not built |
| Glenniston Farm, Auchtertool - Solar Farm Glenniston Farm Gleniston Auchtertool Lochgelly | Locogen Consulting Limited | 10 | Consented, not built |
| Craigluscar, Craigluscar Road - Solar Array & Battery Storage Craigluscar Craigluscar Road Milesmark | Locogen Consulting Limited | 9.9 | Consented, not built |
| Parkend Crossgates - Solar Panels & Battery Storage Parkend Crossgates | Greentech Projects Holding UK Limited | 9 | Consented, not built |
| Cable Road - Energy Storage Battery Box S/O Cable Road, Glenrothes | AMP Clean Energy | 0.2 | Consented, not built |
| Micro Energy Storage Project, Colquhally Road - Energy Storage Battery Micro Energy Storage Project, Colquhally Road, Lochgelly | AMP Clean Energy | 0.2 | Consented, not built |
| Micro Energy Storage Project, West Way - Energy Storage Micro Energy Storage Project West Way Hillend Industrial Park Dalgety Bay | AMP Clean Energy | 0.2 | Consented, not built |
| Micro Energy Storage, Kennoway Road - Energy Storage Battery Micro Energy Storage Project Kennoway Road | AMP Clean Energy | 0.2 | Consented, not built |
| Oakley, Unit 1 - Energy Storage Battery Box Unit 1, Oakley, Dunfermline | AMP Energy Services Limited | 0.2 | Consented, not built |
| Rainbow Nursery, Saltire Centre, Pentland Park - Energy Storage Battery Rainbow Nursery, Saltire Centre, Pentland Park, Glenrothes | AMP Clean Energy | 0.2 | Consented, not built |
| Former Fife Power Station - Battery Energy Storage System Woodend, Cardenden | Fife Power 1 Ltd | 100 | In planning |
| Roaring Hill, Whinnyknowe - Battery Energy Storage System Roaring Hill, Whinnyknowe, Leslie, Glenrothes | ELM Power Limited | 60 | In planning |
| West Springfield Solar Farm - Solar Panels & BESS | BLC Energy | 35 | In planning |
Battery storage in Glasgow City
2 projects, 64 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Glasgow Road, Eaglesham - Battery Storage Facility E/O Glasgow Road, Eaglesham | GPC 1137 Limited (Apatura) | 40 | Consented, not built |
| Parkhouse Road - Battery Energy Storage S/O 557 Parkhouse Road | GPC 1184 Limited | 24 | Consented, not built |
Battery storage in Gloucestershire
45 projects, 1,477 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Land North of Actrees Solar Farm Actrees Solar Farm, Heathfield, Alkington, Berkeley, Gloucestershire | SMS | 49.9 | Operating |
| Larks Green Solar Farm Land North and West Of Iron Acto, Iron Acton, Bristol, Avon | Enso Energy & Iron Acton Green | 49.5 | Operating |
| Severn Road Land At, Severn Road, Hallen, Bristol | FPC Industry & Enterprise | 32 | Operating |
| Cirencester Solar Farm Land Parcel East Of, Wilpit Lane, Preston, Cirencester | Warrington Borough Council & Statkraft | 10 | Operating |
| Meteor Business Park Unit 4, Hangar Meteor Business Park, Cheltenham Road East, Gloucester, Gloucestershire | Safran Landing Systems | 1.5 | Operating |
| Willersey solar farm Land Parcel To The North Of The Byre Badsey Lane Willersey Gloucestershire | Belectric UK | 1 | Operating |
| Highleadon - Solar Arrays & Battery Storage Near Highleadon Highleadon | RWE | – | Operating |
| Earthcott Green Farm, Earthcott Green - Battery Energy Storage Earthcott Green Farm, Earthcott Green, Alveston, Bristol | Immersa Limited | 200 | Consented, not built |
| Westerleigh Hill, Westerleigh - Battery Energy Storage Facility Land Off Westerleigh Hill Westerleigh | Immersa Limited | 200 | Consented, not built |
| Linton Court Farm, Highnam - Battery storage Linton Court Farm, Highnam | STOR 136 Limited | 99.9 | Consented, not built |
| Lower Larks Farm - Battery storage Lower Larks Farm Larks Lane Iron Acton | IPP Cero Generation | 99.9 | Consented, not built |
| Iron Acton Substation, Latteridge Lane - Battery Energy Storage System West Of Iron Acton Substation Latteridge Lane Iron Acton | Balance Power Projects Limited | 99 | Consented, not built |
| Severn Road, Hallen - Battery Storage Facility Severn Road, Hallen, Bristol | EL Avonmouth Limited | 70 | Consented, not built |
| Says Court Farm, Coalpit Heath - Battery Energy Storage Says Court Farm Badminton Road Coalpit Heath | Anglo Renewables Limited | 50 | Consented, not built |
| Sudmeadow Road, Hempsted - Battery Energy Storage System N/O Sudmeadow Road, Hempsted, Gloucester | Greenfield Energy Developments Limited | 50 | Consented, not built |
| Claydon Farm - Solar Farm & Battery Storage Land At Claydon Farm Claydon Tewkesbury | JBM Solar Projects 17 Limited | 49.9 | Consented, not built |
| Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility Land Between Larks Lane And Latteridge Lane Latteridge | Anglo Renewables | 49.9 | Consented, not built |
| Moreton Lane - Solar Farm & Battery Storage Land Parcels A & B Near Whitminster Gloucestershire | JBM Solar Projects 7 Limited | 49.9 | Consented, not built |
| Tredington House Farm, Tredington - Battery Energy Storage Facility Part Parcel 7800 Tredington | Greenfield Energy Developments Ltd | 40 | Consented, not built |
| Kingston Road, Slimbridge - Battery Storage Land North East Of Kingston Road Slimbridge | Relay Slimbridge Limited | 36 | Consented, not built |
| Hill Court Solar farm & Battery storage Land At HIll Court Tranton Lane Hill | Longlands Solar Farm Limited | 35 | Consented, not built |
| Northington Lane - Battery Storage Facility Northington Lane, Awre | Green Frog Ventures Limited | 35 | Consented, not built |
| Patch Elm Lane - Battery Storage Patch Elm Lane Rangeworthy | Green Frog Ventures Limited | 35 | Consented, not built |
| Brockworth Road - Battery Storage System W/O Brockworth Road, N/O The A417 & E/O M5, Gloucester | Exagen | 20 | Consented, not built |
| Kings Weston Lane - Battery Energy Storage System Kings Weston Lane, Avonmouth, Bristol | Fig Power | 20 | Consented, not built |
| Lassington Lane, Highnam - Battery Storage Part Parcel 8900, Lassington Lane, Highnam, Gloucester | Pathfinder Clean Energy UK Dev Limited | 10 | Consented, not built |
| Old Green Farm, Alveston Battery Storage Agricultural Field Circa 600M South Of Earthcott Green And Circa 297M East Of The B4427 | Ecotricity | 10 | Consented, not built |
| Cheltenham General Hospital - Battery Energy Storage System Cheltenham General Hospital, Sandford Road, Cheltenham | Gloucestershire Hospitals NHS Foundation Trust | 2.2 | Consented, not built |
| Drive Vauxhall, Avon Street - Battery Energy Storage Drive Vauxhall, Avon Street, Bristol | University of Bristol | 0.6 | Consented, not built |
| Bonnington Walk, Lockleaze - Micro Energy Storage Facility Bonnington Walk, Lockleaze, Bristol | AMP Clean Energy | 0.2 | Consented, not built |
| Lockleaze Sports Centre, Bonnington Walk - Battery Storage Lockleaze Sports Centre Bonnington Walk | Amp Clean Energy | 0.2 | Consented, not built |
| Lockleaze Sports Centre, Bonnington Walk - Micro Energy Storage Opposite Lockleaze Sports Centre Bonnington Walk | AMP Clean Energy | 0.2 | Consented, not built |
| Stoke Gifford Bypass, Curtis Lane - Micro Energy Storage System Stoke Gifford Bypass, Opp Curtis Lane, Hambrook, Bristol | AMP Clean Energy | 0.2 | Consented, not built |
| Cattybrook Solar Farm Near Boardinghouse Lane Almondsbury | Luminous Energy Limited | – | Consented, not built |
| Gloucester Royal Hospital - Battery storage Gloucester Royal Hospital, Great Western Road, Gloucester | Gloucestershire Hospitals NHS Foundation Trust | – | Consented, not built |
| Gloucestershire Science And Technology Par - Energy Storage Facility Berkeley Green UTC Gloucestershire Science And Technology Park Hamfield Lane Berkeley | Ecotricity Berkeley Storage Limited | – | Consented, not built |
| Larks Lane, Iron Acton - Battery Storage Facility National Grid, Larks Lane, Iron Acton, Bristol | RE Projects Development | – | Consented, not built |
| Spratsgate Lane, Siddington - Solar Farm and Battery Energy Storage System Spratsgate Lane Siddington | Aura Power Developments Limited | – | Consented, not built |
| The Wave - Solar & Battery Development Land West Of The Wave Main Road Easter Compton South, Bristol | The Wave Group Limited | – | Consented, not built |
| Woodlands Farm, Clapton - Ground Mounted Solar Park Woodlands Farm Woodlands Lane Clapton Berkeley | Ecotricity Generation Limited | – | Consented, not built |
| Bengrove Farm, Base Lane - Battery Storage Bengrove Farm, Base Lane, Sandhurst | Bengrove Bess Limited | 49.9 | In planning |
| Larks Lane, Iron Acton - Battery Storage Facility E/O Larks Lane, E/O Larks Lane, Bristol | HD000ACT Limited | 20 | In planning |
| Quarry Road, Alveston - Micro Battery Energy Storage System Vattingstone Lane, Opp Quarry Road, Alveston, Bristol | AMP Clean Energy | 0.2 | In planning |
| Central Park - Solar Farm & Battery Storage The South Of Central Avenue Central Park Severnside | Severnside Distribution Lane Limited | – | In planning |
| Severn & Wye, Claxhill - Solar Panels & Battery Energy Storage System W/O Hunthill Road, Claxhill, Westbury on Severn | Olsa Futures Limited | – | In planning |
Battery storage in Grampian
24 projects, 1,129 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Overhill Farm, Rothienorman - Battery Energy Storage Overhill Farm Rothienorman Inverurie | One Planet Developments Limited | 49.9 | Under construction |
| Farburn Place - Battery Energy Storage Facility Place Dyce | Peak Reserve Power Limited & Centrica & Cragside | 30 | Under construction |
| Garbet Windfarm - Wind Farm & Storage facility Garbet Windfarm Site 5.5km SE/O Dufftown Keith Grampian | Energiekontor UK Limited | 3 | Under construction |
| Kincraig - Solar Farm and battery storage system Kincraig Ellon | Renewable Connections Developments Limited | – | Under construction |
| St Fergus Renewable Energy Park Land Adjacent To The St Fergus, St. Fergus, Peterhead | Ednie Farms | – | Under construction |
| Kintore Battery Energy Storage Project SO Midmill Business Park, Kintore, Inverurie | Alcemi Storage Development Limited | 300 | Consented, not built |
| Kinmuck Battery Energy Storage Kinmuck Farm, Ellon | Kinmuck Energy Storage Limited & Island Green Power | 105 | Consented, not built |
| Dyce Energy Storage, Raiths Industrial Estate - Battery Facility Raiths Industrial Estate, By Kirkton Drive, Pitmedden Road, Dyce, Aberdeen | Intelligent Land Investments Group | 50 | Consented, not built |
| Drum Farm - Battery Energy Storage System Drum Farm, Keith | Field Energy | 49.9 | Consented, not built |
| Electricity Substation, Westerton Road - Battery Storage Adjacent To Electricity Substation Westerton Road | Keith Renewables Limited | 49.9 | Consented, not built |
| Law Of Doune Road, Macduff - Battery Storage South Of Macduff Electricity Substation Law Of Doune Road Macduff | Intelligent Land Investments Group Plc | 49.9 | Consented, not built |
| Rigifa Cove Road - Battery Storage Rigifa Cove Road, Aberdeen | Trina Solar | 49.9 | Consented, not built |
| Rothienorman - Battery Storage 1.5km To The North West Of Rothienorman | Anesco Limited | 49.9 | Consented, not built |
| Broomhill BESS - Battery Energy Storage Midmill Kintore Aberdeenshire | Gigabox Energy Storage Limited | 49 | Consented, not built |
| Newton Of Pitfodels - Battery Storage Newton Of Pitfodels | Flexion Energy Uk Storage | 40 | Consented, not built |
| West Bendings - Battery Storage North West Of West Bendings | Fiddes Battery Limited | 30 | Consented, not built |
| Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead | Elgin Energy Es Co Limited | 20 | Consented, not built |
| Speyslaw Farm - Battery Storage Speyslaw Farm | Elgin Energy EsCo | 19.9 | Consented, not built |
| Bankhead Recycling - Solar Array, Battery Storage & Hydrogen Bankhead Recycling & Waste Management Duffshill Road Portlethen | Bankhead Renewable Energy Limited | 5 | Consented, not built |
| Coast Viners Animal Nutrition, Drumlithie - Solar Array & Battery Storage Adj East Coast Viners Animal Nutrition Drumlithie Stonehaven | East Coast Viners Renewables Limited | – | Consented, not built |
| Tarland Substation S/O Bogfern Farm, Cushnie, Alford | BIA Power Limited | – | Consented, not built |
| Hill of Fare - Hill of Fare Wind Farm & Battery Storage Hill of Fare, Banchory | RES Limited | 100 | In planning |
| Aultmore Forest - Buckie - Windfarm Aultmore Forest, Drybridge, Buckie | Vattenfall | 50 | In planning |
| Craig Watch - Wind Farm & Battery Storage Craig Watch Wind Farm Moray | Craig Watch Wind Farm Limited | 27.4 | In planning |
Battery storage in Greater Manchester
26 projects, 1,721 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| West Didsbury Battery Storage Sawfield Nurseries Fairy Lane, Sale | Statera Energy & Gresham House | 50 | Operating |
| Atherton - Battery energy storage R/O 9 Coal Pit Lane Atherton Manchester | FPC Electric Land Limited & Pulse Clean Energy | 30 | Operating |
| Carrington Power Station, Manchester Road - Battery Storage Carrington Power Station, Manchester Road | Statera Energy | 680 | Under construction |
| Gipsy Lane Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale | Arlington Energy | 20 | Under construction |
| Moston Vale Land To The South West Of, Moston Vale, Manchester, Greater Manchester | Novus Renewable Services | 10 | Under construction |
| Daines Battery Energy Storage System N/O Ashton Road, Carrington, Manchester | SSE Daines BESS Limited | 600 | Consented, not built |
| Sandyforth Farm, Ashton Road - Battery Energy Storage Sandyforth Farm, Ashton Road, Billinge, Wigan | UKGEA | 70 | Consented, not built |
| Orrell Street Battery Energy Storage Facility Site Of Former Council Depot Orrell Street | Enzygo Limited Environmental Consultants | 50 | Consented, not built |
| Wild Fowl Farm, Carrington Lane - Battery Storage Facility Wild Fowl Farm Carrington Lane Carrington | O&G Solar (SPV 56) Ltd | 35 | Consented, not built |
| Medlock Road, Failsworth - Battery Energy Storage South East Side Of Medlock Road Failsworth | Root Power (North) Limited | 30 | Consented, not built |
| Shore Top Farm, Kearsley Road - Battery Energy Storage Shore Top Farm, Kearsley Road, Radcliffe, Manchester | Taiyo Power & Storage Limited | 11 | Consented, not built |
| Stoneclough - Battery Energy Storage R/O Shoreside Stables, Prestolee Road, Stoneclough, Manchester | GAM Capital Limited & Infinis Energy Services Limited | 7 | Consented, not built |
| Holden Way Land Off Holden Way, Dukinfield, Greater Manchester | STOR Power | 6 | Consented, not built |
| Bentfield Industrial Units Bentfield Industrial Units, Stockfield Road, Chadderton, Oldham, Greater Manchester | Diodes Zetex Semiconductors | 0.3 | Consented, not built |
| Flixton Road, Flixton - Micro Energy Storage The East Of Flixton Road Flixton | AMP Clean Energy | 0.2 | Consented, not built |
| Forge Way, Ashburton Road - Battery Storage System Adjacent To Where Wheel Forge Way Meets Ashburton Road West Trafford Park | Battery Box Limited | 0.2 | Consented, not built |
| Lake Road, Trafford Park - Energy Storage System Adjacent To Junction Of Lake Road And Trafford Park Road Trafford Park | Battery Box Limited | 0.2 | Consented, not built |
| Woodsend Road, Urmston - Battery Energy Storage The E/O Woodsend Road, Flixton, Urmston, Manchester | AMP Clean Energy | 0.2 | Consented, not built |
| Ditchers Farm Land At Ditchers Farm, Slack Lane, Westhoughton, Bolton | Conrad Energy (Developments) Limited | – | Consented, not built |
| Manchester Road - Green Hydrogen Production Facility & Battery Storage Power Station, 132 Manchester Road, Manchester | Trafford Green Hydrogen Limited | – | Consented, not built |
| Tontine Road - Battery Energy Storage System S/O Ashton Hall, Tontine Road, Road Up Holland, Wigan | Coriolis Energy | 70 | In planning |
| Far Moor - Battery Energy Storage System South West Of New Fold Orrell | Greenfield Energy Developments Limited | 50 | In planning |
| Grimshaw Road, Skelmersdale - Battery Storage Between Grimshaw Road Skelmersdale | Battery Box Limited | 0.2 | In planning |
| Pimbo Road, By Paxton Place Jnct - Micro Energy Storage Project Junction With Pimbo Road Paxton Place West Pimbo Up Holland | AMP Clean Energy | 0.2 | In planning |
| The West Side Of Hanson Street, Middleton - Battery Storage The West Side Of Hanson Street Middleton | AMP Clean Energy | 0.2 | In planning |
| Whitehead Landfill Site, Lower Green Lane - Battery Storage Whitehead Landfill Site, Lower Green Lane, Astley, Manchester | Whitehead Restoration Limited | – | In planning |
Battery storage in Gwent
12 projects, 428 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Traston Road Land East Of Clarke Energy Production, Traston Road, Newport | Field Energy | 20 | Operating |
| Llanwern Solar Farm & Battery Storage Land At Caldicot Levels To South Of Whitson Electricity Substation, Broad Street Common, Nash, Newport | NextEnergy Capital LLP | – | Operating |
| Uskmouth Power Station - Battery Storage Uskmouth Power Station West Nash Road Nash Newport | Simec Atlantic Energy Uskmouth Power Station | 230 | Under construction |
| Uskmouth Power Station, West Nash Road - Battery Storage Facility Uskmouth Power Station, West Nash Road, Nash, Newport | AW1 Energy Storage Limited | 120 | Under construction |
| Leeway House, Leeway Industrial Estate - Battery Energy Storage System Leeway House, Leeway Industrial Estate, Newport | Aldustria Limited | 20.6 | Consented, not built |
| Rassau Industrial Estate, Rassau - Battery Energy Storage Rassau Industrial Estate, Adj To Generating Plant, Rassau, Ebbw Vale | Private Developer | 8 | Consented, not built |
| Docks Way Disposal Site, Docks Way - Battery Energy Storage System South Of Docks Way Disposal Site Docks Way | Newport City Council | 1 | Consented, not built |
| Herbert Street, Hafodyrynys - Micro Energy Storage Herbert Street, Hafodyrynys, Newport | AMP Clean Energy | 0.2 | Consented, not built |
| Roseheyworth Business Park - Solar Array & Battery Storage adjacent to Unit 10 Roseheyworth Business Park Abertillery | Private Developer | – | Consented, not built |
| Uskmouth Power Station, West Nash Road - Battery Energy Storage Uskmouth Power Station, West Nash Road, Nash, Newport | Simec Uskmouth Power Limited | – | Consented, not built |
| Upper Pant-Ysgawen Farm, Maes-Yr-Haf Lane - Battery Energy Storage System Upper Pant-Ysgawen Farm, Maes-Yr-Haf Lane, Croespenmaen, Newport | Voltwise Power Holdings Limited | 28 | In planning |
| Wentlooge Renewable Energy Hub Land SW of St Brides on the Gwent Levels | Wentlooge Farmers' Solar Scheme | – | In planning |
Battery storage in Gwynedd
10 projects, 507 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Penrhos Works - Battery Energy Storage System Penrhos Works, Holyhead | Anglesey Land Holdings Limited | 349 | Consented, not built |
| Tyddyn Forgan, Llanddeiniolen - Energy Storage System Tyddyn Forgan, Llanddeiniolen, Caernarfon | Firstway Energy & Net Zero Twenty Six Limited | 100 | Consented, not built |
| Pentir Substation, Pentir - Battery Energy Storage Pentir Substation, Pentir, Bangor | Lightsource BP | 57 | Consented, not built |
| Morfa Conwy Business Park, Ffordd Sam Pari, Unit 7 - BESS Morfa Conwy Business Park, Unit 7 Ffordd Sam Pari | The Welsh Government (Head Office) | 0.2 | Consented, not built |
| W O Jones Printers - Energy Storage Facility W O Jones Printers, Ffordd Ystad Ddiwydiannol, Industrial Estate Road, Llangefni | Development At WO Jones Printers | 0.2 | Consented, not built |
| Alaw Môn Solar Farm - Solar Farm & Energy Storage Facility Llyn Alaw, Beaumaris | Enso Energy Limited | – | Consented, not built |
| Alwen Forest Project Alwens Forest, Llyn Brenig, Conwy | RWE Generation & Innogy | – | Consented, not built |
| M-SParc - Battery Storage M-SParc | Menai Science Park Limited | 0.4 | In planning |
| Welsh Assembly Government Buildings, Sarn Mynach - BESS Welsh Assembly Government Buildings Sarn Mynach | The Welsh Government | 0.4 | In planning |
| Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage Townland of Meenakeeran, North of 109 - 124 Tullycar Road, Approximately 9.5km West/North West of Killeter | Meenakeeran Wind Farm Limited | – | In planning |
Battery storage in Hampshire
45 projects, 2,655 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Minchens Lane Battery Storage Facility OS Ref 464762 159811 Minchens Lane Bramley | Penso Power (BW ESS) | 100 | Operating |
| Newlands Farm Battery Storage Facility Phase 2 Newlands Farm | British Solar Renewables | 40 | Operating |
| Winchester Battery Storage Down Farm Port Lane Hursley | Conrad Energy | 19 | Operating |
| Berry Court Solar Farm - energy storage Bramley road, Little London | Anesco | 1 | Operating |
| Halewick Lane, Sompting - Battery-based Energy Storage Facility Land at (former) Waste Managem, Halewick Lane, Sompting, Lancing | Public Power Solutions (PPS) & West Sussex County Council | 50 | Under construction |
| Titchfield Lane Land South Of Ash Farm, Titchfield Lane, Wickham, Fareham, Hampshire | Balanced Grid Solutions | 49 | Under construction |
| Mill Lane, Nursling - Battery Storage Facility SHB Hire Ltd, Mill Lane, Nursling, Southampton, Hampshire | Gerard Hall Energy | 20 | Under construction |
| Land Adj Harmer Warren Quarry Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood | New Forest Energy (formerly Somerley Estate) | 10 | Under construction |
| Lakeside Business Park Western Road, Portsmouth | Custom Solar Limited | 2 | Under construction |
| Bunkers Hill Farm - Solar farm & Battery stations Bunkers Hill Farm Reading Road Rotherwick Hook | Vantage RE | – | Under construction |
| East Road, Marchwood - Battery Energy Storage EAST ROAD, MARCHWOOD INDUSTRIAL PARK, MARCHWOOD | BW ESS Development UK Limited | 200 | Consented, not built |
| Upton Lane, Nursling - Battery Energy Storage Upton Lane Nursling | Masdar Arlington Energy | 99.9 | Consented, not built |
| Butts Field, Mill Lane - Battery Storage Butts Field Mill Lane, Nursling, Southampton | Ecotricity Generation Limited | 99 | Consented, not built |
| Station Road, Crescent Industrial Estate - Battery Storage Facility W/O Station Road, Crescent Industrial Estate, Nursling, Southampton | PJS One Limited | 62 | Consented, not built |
| Misslebrook Farm, Botley Road - Battery Storage Misslebrook Farm Botley Road North Baddesley | Boom Developments Limited | 60 | Consented, not built |
| Ash Lane, Little London - Battery Storage East Of Ash Park Business Centre Ash Lane Little London, Tadley | Bramley BESS Limited | 57 | Consented, not built |
| Coxmoor Wood, Crondall Road - Battery Storage North of Coxmoor Wood, off Crondall Road, Crookham Village | Fleet Green Limited | 57 | Consented, not built |
| Upton Lane, Nursling - Battery Storage Facility Upton Lane Nursling Southampton | Unknown | 50 | Consented, not built |
| Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System E/O Bulls Copse Road, Marchwood Bypass, Southampton | Sky UK Development Limited | 49.9 | Consented, not built |
| Silkstead Farm, Poles Lane - Battery Energy Storage System Silkstead Farm, Poles Lane, Hursley, Winchester | Winchester Energy Reserve Limited | 49.9 | Consented, not built |
| Blue Bell Lodge, Rye Common Lane - Battery Storage Blue Bell Lodge Rye Common Lane Crondall | Pulse Clean Energy | 49.5 | Consented, not built |
| Rye Common Street Record, Rye Common Lane, Crondall, Farnham | Pulse Clean Energy | 49.5 | Consented, not built |
| Tanners Lane - Battery Energy Storage Facility (Phase One) Newlands Farm Tanners Lane Fareham | British Solar Renewables | 40 | Consented, not built |
| Allington Lane - Solar & Battery Farm We/O Allington Lane, Eastleigh | Eastleigh Borough Council | 16 | Consented, not built |
| Ash Farm, Titchfield Lane - Battery Storage Titchfield Lane, Whiteley, Fareham | Botley Energy Reserve 2 Limited | 15 | Consented, not built |
| Stockbridge Road Stockbridge Road Energy Storag, Land adjacent to B3049, Salters Lane, Winchester, Hampshire | Winchester Power | 10 | Consented, not built |
| Hamble Lane Battery Energy Storage Land off the B397, Netley Abbey, Hound, Southampton, Hampshire | Balanced Grid Solutions | 6 | Consented, not built |
| IBM Hursley - Battery Storage IBM Limited, IBM Hursley, Winchester | IBM UK Limited | 1.5 | Consented, not built |
| Bus Depot, Gosport Road - Battery Energy Storage Bus Depot, Gosport Road, Fareham | FirstBus (South) Limited | – | Consented, not built |
| Chosley Farm, North Warnborough Solar Farm and Battery storage Chosley Farm Bidden Road North Warnborough Hook | Shell Renewables (CSE23 Limited) | – | Consented, not built |
| Copse Close Solar Farm Land East of the Old Dairy, Selborne Road, Selborne, Alton | Copse Close Solar Farm Limited | – | Consented, not built |
| Perham Down - Meadow Solar Farm & Battery Storage Meadow Solar Farm, Se/O Perham Down, Andover | Low Carbon UK Solar Investment Co Limited | – | Consented, not built |
| Slowhill Copse, Bury Road - Battery Storage Facility Slowhill Copse, Bury Road, Marchwood, Southampton | Trant Engineering Limited | – | Consented, not built |
| St James Hospital Solent Nhs Trust, Locksway Road - Energy Centre St James Hospital, Solent Nhs Trust Locksway Road | Solent NHS Trust | – | Consented, not built |
| Titchfield Lane, Wickham - Battery Energy Storage System Titchfield Lane Wickham | Grenergy Renewables | – | Consented, not built |
| Southampton Battery Energy Storage Adjacent to Redbridge Station and The River Test Port of Southampton | NatPower UK | 1,000 | In planning |
| Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage Bedhampton Pumping Station, Meyrick Road | E101 Hub 4 Limited | 150 | In planning |
| Fort Widley, Portsdown Hill Road - Battery Energy Storage System Fort Widley, Portsdown Hill Road, Portsmouth | Voltwise Power Holdings Limited | 120 | In planning |
| Widley Farm, New Down Lane - Battery Storage Facility Widley Walk Purbrook | Leafield Energy Limited | 100 | In planning |
| Basing Road Land At, Basing Road, Old Basing, Basingstoke | Eco-Economix | 20 | In planning |
| Gaston Lane, Farringdon - Solar Farm & Battery Storage Gaston Lane, Farringdon | Quintas Energy UK Limited | 2 | In planning |
| Christchurch Road, Downton - Battery Storage W/O Christchurch Road, Downton, Lymington | GridSource Limited | 0.2 | In planning |
| Glebe Farm, Curdridge Lane - Battery Energy Storage System Glebe Farm, Curdridge Lane, Waltham Chase, Southampton | Glebe Farm Energy Limited | – | In planning |
| Hound Road Hound Road Netley Southampton | Conrad Energy (Developments) Limited | – | In planning |
| Lovedean, Denmead - Solar farm & Battery storage S/O Lovedean Electricity Sub Station, Broadway Lane, Lovedean, Waterlooville | Lovedean Green Limited | – | In planning |
Battery storage in Hereford and Worcester
4 projects, 80 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Land to the west of Clay Hill Pit / Larport Farm Land West of Clay Hill Pit Larport Farm Larport Lane Dormington | Anesco (formerly owned by Energy Reservoirs) | 20 | Operating |
| Whitehouse Farm Energy Barn Whitehouse Farm, Blakes Lane, Guarlford, Malvern | Bluefield Solar Income Fund | 40 | Consented, not built |
| Perserverance Road Old School Lane, Hereford | Noriker Power | 20 | Consented, not built |
| Woolaston Road Land At, Woolaston Road, Redditch, Hereford and Worcester | Mercia Power Response | – | Consented, not built |
Battery storage in Herefordshire
5 projects, 50.5 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage W/O Clay Hill Pit, Dormington, Hereford | Conrad Energy | – | Operating |
| Peterstow Gas Compressor Station, Hentland - Energy Storage System S/O Peterstow Gas Compressor Station, Hentland, Ross on Wye | Novus Renewable Services Limited | 49.9 | Consented, not built |
| Chapel Road - Micro Energy Storage West of Chapel Road Chapel Road | AMP Clean Energy | 0.2 | Consented, not built |
| Chapel Road - Micro Energy Storage Facility Building 704 Chapel Road Rotherwas | AMP Clean Energy | 0.2 | Consented, not built |
| Green Spider Climbing, Ramsden Road - Micro Energy Storage Facility Green Spider Climbing Limited, Ramsden Road, Rotherwas, Hereford | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
Battery storage in Hertfordshire
30 projects, 1,379 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Tollgate Farm Battery Storage Tollgate Farm, Tollgate Road, North Mymms | RNA Energy & Harmony Energy Storage& Tag Energy UK | 49.5 | Under construction |
| Ginns Road, Stocking Pelham - Battery Energy Storage Ginns Road Stocking Pelham | FRV TH Powertek Limited | 400 | Consented, not built |
| Hilfield Lane, Aldenham - Battery Energy Storage W/O Hilfield Lane, Aldenham, Watford | Penso Power (BW ESS) | 170 | Consented, not built |
| Dellows, Ginns Road - Battery Storage Dellows, Ginns Road, Stocking Pelham, Buntingford | Grenergy Renewables UK Limited | 90 | Consented, not built |
| Greens Farm - Battery energy storage Greens Farm, East End, Stocking Pelham, Buntingford | Cambridge Power | 50 | Consented, not built |
| River Mel Solar Farm & Battery Storage System South Of Munceys Farm London Way Melbourn | Quintas Cleantech | 25 | Consented, not built |
| St Ippolyts - Solar Farm & Battery Storage Opp Wymondley Grid Station & To The S/O Sperberry Hill, St Ippolyts, Hitchin | Brockwell Storage & Solar Limited | 12.5 | Consented, not built |
| Pudds Cross Farm, Pudds Cross - Solar Panels & Battery Energy Storage Pudds Cross Farm Pudds Cross Bovingdon | BSR Energy | 10 | Consented, not built |
| Wickham Hall Estate - Battery Storage The North-West Of Bishops Stortford Farnham Road Farnham | Endurance Energy Wickham Hall Limited | 10 | Consented, not built |
| Tophams Solar Farm W/O Ashwell Road, Bygrave, Baldock | Pathfinder Clean Energy UK Dev Limited | 8 | Consented, not built |
| Dellsome Power Hatfield Grid Station - Energy storage facility Dellsome Power Hatfield Grid Station, Dellsome Lane, St. Albans | AMP Energy Services Limited | 5 | Consented, not built |
| Letchworth Garden City - Urban Reserve Energy Storage Facility Works Road, Letchworth Garden City | AMP Energy Services Limited | 5 | Consented, not built |
| Ware Solar Park - Solar Farm & Battery Energy Storage West Of Ware Ware Park Farm | The Farm Energy Company | 5 | Consented, not built |
| Welwyn Power - Energy Storage Facility Welwyn Power west side of Tewin Road Welwyn Garden City | AMP Energy Services Limited | 5 | Consented, not built |
| Stanborough, Hatfield - Battery Energy Storage System Land East of A6129 Stanborough Hatfield | J Reddington Limited | 1.5 | Consented, not built |
| Brownfields - Battery Storage 39 Brownfields | AMP Clean Energy | 0.2 | Consented, not built |
| Larwood Drive, Rusling Way - Micro Battery Storage The West Side Of Larwood Drive Opposite Rusling Way | AMP Clean Energy | 0.2 | Consented, not built |
| Martins Way - Micro Energy Storage Martins Way | AMP Clean Energy | 0.2 | Consented, not built |
| Nobel Secondary School, Mobbsbury Way - Energy Storage Nobel School, Mobbsbury Way, Stevenage | AMP Clean Energy | 0.2 | Consented, not built |
| The End Of Taransey, Taransay - Energy Storage System The End Of Taransey, Taransay, Hemel Hempstead | AMP Clean Energy | 0.2 | Consented, not built |
| Verge By Hemel Stags Rugby Club, Pennine Way - Micro Energy Storage Verge By Hemel Stags Rugby Club, Pennine Way, Hemel Hempstead | AMP Clean Energy | 0.2 | Consented, not built |
| Verge In Highway, Great North Road - Energy Storage System Verge In Highway, Great North Road, Welwyn Garden City | Welwyn Hatfield | 0.2 | Consented, not built |
| Newnham Road, Newnham - Battery Energy Storage Newnham Road, Newnham, Baldock | Balance Power Projects Limited | – | Consented, not built |
| Wickham Hall Estate - Battery Storage Land At Wickham Hall Estate Bishops Stortford | Endurance Energy Wickham Hall Limited | – | Consented, not built |
| Wymondley Solar Farm, Great Wymondley The North And East Of Great Wymondley | AGR Power Limited | – | Consented, not built |
| Beane Solar Farm - Solar Panels Nw/O Cottered & Sw/O The A507 Cottered, Buntingford | Renewable Energy Systems RES ltd (Beaufort) | 354 | In planning |
| Butterfly Lane, Elstree BESS - Battery Energy Storage System Opp Jnct With Butterfly Lane, E/O Watling Street, Radlett | Greenfield Energy Developments Limited | 99.9 | In planning |
| Stevenage Road, Titmore Green - Battery Energy Storage System N/O Stevenage Road, Titmore Green, Little Wymondle, Hitchin | Pivoted Power Llp | 57 | In planning |
| Moggerhanger Road, Sandy - Solar Farm N/O Moggerhanger Road, Sandy, Buntingford | Kach Capital Estates Limited | 20 | In planning |
| Bell Lane, London Colney - Energy Storage System Bell Lane And Opposite Council Cottages Bell Lane London Colney | AMP Clean Energy | 0.2 | In planning |
Battery storage in Highland
79 projects, 4,523 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Torrdhuin, Auchteraw Battery Storage Facility Land 325M SW Of Torrdhuin | Field Energy | 49.9 | Operating |
| Limekiln Wind Farm (Extension) - Battery Broubster Estate, Acheveilan North Estate and Limekiln Estate, southeast of Reay, Caithness | Infinergy & Boralex | 5 | Operating |
| Isle of Eigg Electrification Project Isle of Eigg, Highland Scotland | Eigg Electric | 0.1 | Operating |
| Horse Island Microgrid Project Horse Island, Highland Scotland | Wind & Sun | – | Operating |
| Isle of Muck Microgrid System Isle of Muck, Highland Scotland | Wind & Sun | – | Operating |
| Isle of Rum Microgrid Project Isle of Rum, Highland Scotland | Wind & Sun | – | Operating |
| Dounreay, Thurso - Battery Energy Storage 590m Ne/O Isauld Cottage, Reay, Thurso | Ylem Energy Limited (Reay Power) | 34 | Under construction |
| Philips Mains, Mey - Battery Energy Storage 500m W/O Philips Mains, Mey, Thurso | Ampeak Energy | 300 | Consented, not built |
| Spittal Mains, Spittal - Battery Energy Storage System Spittal Mains, Spittal | Field Spittal Limited | 300 | Consented, not built |
| Fyrish Battery Energy Storage System 140m Nw/O 2 Clashnabuiac | Field Energy | 200 | Consented, not built |
| Knocknagael, Essich - Battery Energy Storage System Knocknagael, Essich | Field Energy | 200 | Consented, not built |
| Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility Alness Grid Sub Station, Mid Balnacraig, Alness | Balnacraig Battery Storage Limited | 50 | Consented, not built |
| Ourack 6km north of Granton-on-Spey | Vattenfall | 50 | Consented, not built |
| Tomchrasky Estate Wind farm 900m Ne/O Beinn An T-Sidhein Dalchreichart | E Power Limited | 50 | Consented, not built |
| Balblair Quarry, Balblair - Battery Energy Storeage System 340M SW Of Balblair Quarry Balblair Beauly | Lovat Estates Limited (LG-B-50a Limited) | 49.9 | Consented, not built |
| Drumore Cottage, Swordale - Battery Storage Drumore Farm, Swordale, Evanton | Fig Power | 49.9 | Consented, not built |
| Geiselittle Farm - Battery Energy Storage 530m S/O Geiselittle Farm | Whirlwind Renewables | 49.9 | Consented, not built |
| Glengolly Farmhouse- Battery Energy Storage Land 500M East Of Glengolly Farmhouse Thurso | Ecocel Energy Storage Limited | 49.9 | Consented, not built |
| Grigorhill Cottage, Grigorhill - Battery Energy Storage 330m E/O Grigorhill Cottage, Grigorhill, Nairn | OPDE UK Limted | 49.9 | Consented, not built |
| Househill House, Househill - Battery Storage 300M SE Of Househill House Househill Nairn | Whirlwind Energy Storage Limited | 49.9 | Consented, not built |
| Loch Toftingall, Halsary Wind Farm - Battery Energy Storage Land To The South West Of Loch Toftingall, East Of The A9 & North Of Halsary Wind Farm | Infinergy Limited & Boralex | 49.9 | Consented, not built |
| Lochluichart - Energy Storage Facility Grudie Bridge, Lochluichart, Garve | Intelligent Land Investments Group | 49.9 | Consented, not built |
| Lythmore House, Technology Park Forss - Battery Energy Storage 190m W/O Lythmore House, South Wing 21 Forss Business & Technology Park Forss, Forss, Thurso | Forss Energy Storage Limited | 49.9 | Consented, not built |
| Spittal Mains Quarry - Battery storage Spittal Mains Quarry Spittal | Fig Power Limited | 49.9 | Consented, not built |
| Stainland Energy Storage Project E/O The A9 N/O Upper Geiselittle Thurso | Whirlwind Energy Storage Limited | 49.9 | Consented, not built |
| Mybster Croft, Spittal - Battery Energy Storage Facility 170m Se/o Mybster Croft, Spittal, Wick | Potencia Energy Limited | 47 | Consented, not built |
| The Smithy - Battery Storage Land 410M NE Of The Smithy Alness | Renewable Energy Systems | 45 | Consented, not built |
| Creag Riabhach Wind Farm Extension & Battery Storage Creag Riabhach Wind Farm, Creag Riabhach, Lairg | Creag Riabhach Wind Farm Limited | 37.3 | Consented, not built |
| Blackpark Energy Storage Black Park Farm, Nairn | Shires Hamilton | 30 | Consented, not built |
| Blackpark House - Battery Storage South Of Blackpark House Nairn | Anesco | 30 | Consented, not built |
| Chleansaid Onshore Wind Farm Dalnessie Estate, approximately 13 km northeast of Lairg | ESB | 20 | Consented, not built |
| Hillcrest Cottage, Shebster - Battery Energy Storage System 475M NW/O Hillcrest Cottage, Shebster | Statkraft UK Limited | 19.9 | Consented, not built |
| Hollandmey Renewable Energy Development Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso | Scottishpower Renewables | 15 | Consented, not built |
| Bunloinn Wind Farm 4035m Sw/O Bunloyne Farm, Glenmoriston, Inverness | Energiekontor (UK) Limited | 5 | Consented, not built |
| Strath Oykel Wind Farm Creagan Breaca, Strath Oykel, Isle of Skye | Energiekontor (UK) Limited | 5 | Consented, not built |
| Cairn Duhie Wind Farm Cairn Duhie Wind Farm Ferness Nairnshire | Renewable Energy Systems (RES) | – | Consented, not built |
| Cairnview, Bettyhill Land 2375M SE Of Cairnview Bettyhill | Bettyhill 2 Wind Limited | – | Consented, not built |
| Invershin Community Hall - Wind Farm & Battery Storage 4600m, Ne/O Invershin Community Hall, Invershin, Lairg | Garvary Wind Farm Limited | – | Consented, not built |
| Raigmore Hospital, Old Perth Road - Battery Storage Raigmore Hospital Old Perth Road | NHS Highland | – | Consented, not built |
| Shore Street - Battery Energy Storage 45m W/O 66a Shore Street, Inverness | Inverness Harbour Trust | – | Consented, not built |
| Slickly Wind Farm 1650m E/O Slickly Croft, Lyth, Wick | Statkraft Wind UK Limited | – | Consented, not built |
| Strathrory Wind Farm Land at Strathrory, 4km northeast of Ardross and 8km northwest of Alness | Energiekontor UK | – | Consented, not built |
| Tigh Na Bradhan, Fasnakyle - Battery Storage Facility 150m E/O Tigh Na Bradhan, Fasnakyle, Cannich, Beauly | Intelligent Land Investments Group | – | Consented, not built |
| Titan Battery Storage Ne/O Brae House, Shebster, Thurso | Green Switch Capital Limited | 500 | In planning |
| Corriemoillie Quarry - Battery Energy Storage Corriemoillie Quarry, Garve | Field Energy | 200 | In planning |
| Corriemoillie Substation Garve - Battery Energy Storage Land 700M East Of Ardachy Lochluichart Garve | Isenau Energy Storage Five Limited | 200 | In planning |
| Achies - Battery Energy Storage System Achies, 750m W/O the A9, Halkirk | Sun4net Limited | 162 | In planning |
| Beinneun II Windfarm 5 (km) northwest of Invergarry | Beinneun 2 Ltd | 160 | In planning |
| Inveroykel Wind Farm - Battery 1.5km S/O 2 Easter Kilmachalmack, Strathkyle, Ardgay | RWE Renewables UK Swindon Limited | 130 | In planning |
| Glen Ullinish II - Wind Farm Glen Ullinish, Isle of Skye | Muirhall Energy Limited | 120 | In planning |
| Shinness Wind Farm Shinness Estate, Sutherland, Lairg | Shinness Wind Farm Limited | 105 | In planning |
| Clune Wind Farm - Battery Energy Storage 27km SE of Inverness 13km NW of Aviemore | Renewable Energy Systems | 100 | In planning |
| Dunballoch Farm, Dunballoch - Battery Energy Storage 465m Se/O Dunballoch Farm, Dunballoch, Beauly | Field Energy | 100 | In planning |
| Creachan Wind Farm & BESS 5.8km Ne/O The Bothy Kildermorie, Strathrusdale | RWE | 80 | In planning |
| Limekiln, Borlum House - Battery Energy Storage System 1500m Se/O Borlum House, Reay, Thurso | Boralex | 70 | In planning |
| Ceislein Wind Farm 3Km SW Of Wester Lealty At Cnoc Ceislain Novar Evanton | RWE Renewables UK Limited | 65 | In planning |
| Golticlay Wind Farm, Bulreanrob - Battery Energy Storage 2040m Ne/O Bulreanrob, Lybster | RWE Renewables UK Swindon Limited | 55 | In planning |
| Lynemore Wind Farm 2000M SW Of Lynemore Moy | Galileo Empower UK Limited | 50 | In planning |
| Buckies Farm - Battery Energy Storage 775M Se Of Geise Farm, Halkirk | OPDE UK Limted | 49.9 | In planning |
| Melvich Bay - Melvich Wind Energy Hub Melvich Bay, Melvich, Thurso | Belltown Power Limited | 42 | In planning |
| Lochluichart East, Ardachy - Battery Energy Storage Facility 700m E/O Ardachy, Lochluichart, Garve | Boralex | 36 | In planning |
| Abhainn Dubh Wind Farm Abhainn Dubh Wind Farm, Abhainn Dubh, Strathcarron | E Power Limited | 30 | In planning |
| Balblair Wind Farm 695M NW Of Coirshellach Airdens Bonar Bridge | Wind Power North Two Limited | 30 | In planning |
| Highland Wind Farm - Battery Storage 4.2 kmwest of Aviemore and 25 km south west of Inverness | Highland Wind Farm Limited | 30 | In planning |
| Charleston Energy Park Mey, Barrock, Thurso | Koehler Renewable Energy | 25 | In planning |
| Kyllachy Wind Farm - BESS Kyllachy Wind Farm, Approximately 4km SW/O Tomatin & N/O Kyllachy Estate, Tomatin | Wind Estate (UK) Limited | 22 | In planning |
| Ben Aketil Wind Farm - Repowered & Extended Ben Aketil, Dunvegan, Isle of Skye | Falck Renewables Limited | 20 | In planning |
| Millennium East Millennium Windfarm, on The Achlain and Invergarry amd Aberchalder Estates, Glengarry Invergarry, Inverness-Shire, (nr Glen Moriston, Fort Augustus) | Renantis UK Limited | 20 | In planning |
| Cnoc Farasd Wind Farm Ne/O The Lodge, Buntait, Glenurquhart, Inverness | E Power Limited | 15 | In planning |
| Allt an Tuir Renewable Energy Park Allt an Tuir, Lairg | REG Windpower Limited & ESB Energy Limited | 12 | In planning |
| Castletown - Wind Farm 975M se/o Mains Of Durran Castletown | Wind 2 Limited | 12 | In planning |
| Balnespick Wind Farm 5 km east of Tomatin, 6 km north-west of Carrbridge | Fred Olsen Renewables Limited | 10 | In planning |
| Lochend Holding, Barrock - Wind Farm 600M NE Of 10 Lochend Holding Barrock | Constantine Group Limited | 10 | In planning |
| Acheilidh Wind Farm (Previously known as Lairg III) Sw/O Tigh An Alt Acheilidh, Rogart | Energiekontor (UK) Limited | 5 | In planning |
| Ballach Wind Farm 4km northwest of Kilmorack | Energiekontor (UK) Limited | 5 | In planning |
| Coille Linne Wind Farm - Battery Energy Storage 21.9km Nw/o Lairg, 16km Se/o Altnaharra, Lairg | Energiekontor (UK) Limited | 5 | In planning |
| Hill Of Lynchrobbie, Dunbeath - Battery Storage Facility Hill Of Lynchrobbie Dunbeath | E Power Limited | 5 | In planning |
| Nevis Centre, Ardlinnhe Road - Micro Energy Storage 60m Ne/O Nevis Centre, Ardlinnhe Road, Fort William | AMP Clean Energy | 0.2 | In planning |
| Nucleus The Nuclear And Caithness Archives - Solar Panels & Battery Nucleus The Nuclear And Caithness Archives Wick Airport Industrial Estate Wick | Wick Airport | 0.2 | In planning |
Battery storage in Humberside
4 projects, 174 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Creyke Beck Land to the south of, Park Lane, Cottingham, Humberside | Statera Energy | 49.9 | Operating |
| Pillswood Phase 1 Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire | Harmony Energy Storage | 49.5 | Operating |
| Pillswood Phase 2 Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside | Harmony Energy Storage | 49.5 | Operating |
| Mauxhall Farm Mauxhall Farm, Immingham Road, Stallingborough, Grimsby, Humberside | Lyceum Solar | 25 | Operating |
Battery storage in Inverclyde
2 projects, 50 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage Former Dougliehill Water Treatment Works, Dougliehill Road, Port Glasgow | Bluestone Energy | 49 | Consented, not built |
| Kip Water Hydro Scheme Kip Water Hydro Scheme Powerho, Greenock, Strathclyde | Greenock Hydro Power | 1 | In planning |
Battery storage in Islands
4 projects, 120 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Shetland Battery Energy Storage System Lower Blackhill Industrial Estate, Genista, Lerwick | Zenobe Energy | 70 | Under construction |
| Battery Point, Newton Street - Battery Energy Storage Park Battery Point Energy Storage Park Newton Street Stornoway | Point & Sandwick Trust | 25 | Consented, not built |
| Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage Luggies Knowe Hill Of Gremista | Shetland Aerogenerators Ltd | 14.9 | Consented, not built |
| Greentoft, Neven Point, Eday - Wind Turbines & BESS Greentoft, Neven Point, Eday, Orkney | Green Power (International) Limited | 10 | In planning |
Battery storage in Isle of Anglesey
1 project, 300 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Carrog Ganol, Rhosgoch - Battery Energy Storage System Carrog Ganol, Rhosgoch | Boom Developments Limited | 300 | Consented, not built |
Battery storage in Isle of Man
1 project, 0 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Billown Solar Farm W/O A3 & S/O A5 Forming Fields Malew | Peel Cubico Renewables Limited | – | In planning |
Battery storage in Isle of Wight
2 projects, 29.8 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Sunny Oaks Renewable Energy Park Se/O Whiterails Road, W/O Briddlesford Road, Wootton, Ryde | Ridge Clean Energy Limited | 28.5 | Consented, not built |
| Arreton Valley Nursery, Hale Common - Battery Storage Arreton Valley Nursery, Hale Common, Newport | Iow Squirrel Limited | 1.3 | Consented, not built |
Battery storage in Kent
61 projects, 3,424 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Cleve Hill Solar Project Graveney, Whitstable | Quinbrook Infrastructure Partners | 150 | Operating |
| Richborough Energy Park - Phase 2 Richborough Energy Park | Richborough Energy Park Limited | 50.1 | Operating |
| Kemsley Substation Land To The South Of Kemsley S, Ypres Drive, Kemsley, Sittingbourne, Kent | Pivot Power | 49.9 | Operating |
| Richborough Energy Park Richborough Energy Park | Richborough Energy Park Limited | 49.9 | Operating |
| Huggin's Hall Land at Huggin's Hall, Glassenbury Road, Cranbrook, Kent | Low Carbon | 40 | Operating |
| Aylesford BESS Land North And West Of Solar Park Bull Lane Eccles Aylesford | Zenobe | 29 | Operating |
| Broadditch Battery Energy Land At Broadditch Farm New Barn Road Southfleet | Harmony Energy | 11 | Operating |
| Littlebrook Battery Storage Land Off Albion Road Dartford | Camborne Energy & Noriker Power | 7.5 | Operating |
| Richborough Energy Park - Phase 3 (Sheaf) Richborough Energy Park, Sandwich Road, Ramsgate, Sandwich | Pacific Green | 249 | Under construction |
| Harrington Franklin, Richborough Energy Park - Battery Storage Part Of Former Richborough Power Station Ramsgate Road | EDP Renewables | 49.9 | Under construction |
| Sundridge Hill Land To South Of A228, Sundridge Hill, Cuxton, Rochester | RNA Energy | 49.5 | Under construction |
| Land off Queenborough Road Land Adjacent To 9 Neatscourt Cottages, Queenborough Road, Halfway, Kent | UK Power Reserve | 40 | Under construction |
| Plot 2B EurolinkV Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne | Trenport Investments | 20 | Under construction |
| Chalk Pit Solar Farm N/O Guston & The Lane, Guston Court Farm, Dover | Greentech Services | – | Under construction |
| Power Station Road, Isle Of Grain - Battery Energy Storage Power Station Road, Isle Of Grain, Rochester | Ecostor Grain West Limited | 249 | Consented, not built |
| Ridham Avenue, Swale Way - Kemsley Battery Energy Storage The S/O Ridham Avenue, E/O Swale Way, Sittingbourne | Ouse Energy Limited | 249 | Consented, not built |
| Woodlands Farm, Calcott Hill - Battery Energy Storage North East Of Woodlands Farm Calcott Hill Sturry | Sky UK Development Limited | 228 | Consented, not built |
| Kemsley Energy Park Battery Storage The West Of Barge Way | FPC Electric Land limited | 120 | Consented, not built |
| Thames Way, Northfleet - Battery Energy Storage Thames Way, Northfleet, Gravesend | Speedgreen Limited | 100 | Consented, not built |
| Darenth Road - Battery Energy Storage System W/O Darenth Road, Dartford | Net Zero Marine Services Limited | 99.9 | Consented, not built |
| Sellindge Substation, Church Lane - Battery Storage West of National Grid Converter Station, Church Lane, Aldington | Pivoted Power Llp | 57 | Consented, not built |
| Glassenbury - Battery Storage System Electricity Distribution Site, Glassenbury Road, Cranbrook, Ashford | Gresham House | 50 | Consented, not built |
| Owls Hatch Road, Thanet Way - Battery Energy Storage Facility R/O Share & Coulter Owls Hatch Road, S/O Thanet Way, Herne Bay | Root Power South Limited | 50 | Consented, not built |
| Ebbsfleet Lane - Battery Storage System North Of Solar Park Ebbsfleet Lane | Grenergy Renewables UK Limited | 49.9 | Consented, not built |
| New Barn Road - Battery Energy Storage Facility East Side Of New Barn Road, Gravesend | Aton Energy Development (Northfleet) Limited | 35 | Consented, not built |
| Sacketts Hill Farm - Battery Energy Storage System Land North Of Sacketts Hill Farm Sacketts Hill | Greenfield Limited | 22 | Consented, not built |
| Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage Reeds Solar Farm Alders Road Colts Hill | Low Carbon | 20 | Consented, not built |
| Wharf Road, Discovery Park - Battery Energy Storage Land Adjacent To Biomass Combined Heat And Power Plant, Wharf Road Discovery Park Sandwich | Kent Renewable Energy Limited | 10 | Consented, not built |
| Wouldham Road, Wouldham - Battery Storage Facility E/O Wouldham Road & N/O School Lane, Wouldham, Rochester | AMP Energy Services Limited | 7.5 | Consented, not built |
| Mid Kent College Medway Campus, Medway Road - Battery Storage, ASHP Mid Kent College Medway Campus, Medway Road, Gillingham | Mid Kent College | 1 | Consented, not built |
| Ramsgate Sports Centre, High Street - Solar Panels & Battery Storage Ramsgate Sports Centre, High Street, Ramsgate | Thanet District Council | 0.4 | Consented, not built |
| Ashford Road, Kingsnorth - Energy Storage Facility East of 1 Ellingham Industrial Centre, Ellingham Way | AMP Clean Energy | 0.2 | Consented, not built |
| Aylesham And District Community Workshop, Ackholt Road - Battery Storage Aylesham And District Community Workshop Trust, Ackholt Road Aylesham | AMP Clean Energy | 0.2 | Consented, not built |
| Castle Road, Eurolink - Battery Energy Storage System Verge Adj To Unit 8-10, Anchor Business Park, Castle Road, Eurolink, Sittingbourne | AMP Clean Energy | 0.2 | Consented, not built |
| Church Road, Sevington - Energy Storage Facility South West And North East Of Church Road | AMP Clean Energy | 0.2 | Consented, not built |
| Cobbs Wood Industrial Estate, Chart Road - Battery Energy Storage Cobbs Wood Industrial Estate, Chart Road, Ashford | AMP Clean Energy | 0.2 | Consented, not built |
| Corona Terrace & Hollow Lane - Micro Energy Storage Junction Of Corona Terrace And Hollow Lane | AMP Clean Energy | 0.2 | Consented, not built |
| Featherby Road, Bredgar Road - Micro Energy Storage Featherby Road Opposite Bredgar Road | AMP Clean Energy | 0.2 | Consented, not built |
| Four Elms Roundabout, Wainscott - Micro Energy Storage Verge By Four Elms Roundabout, Wainscott, Rochester | AMP Clean Energy | 0.2 | Consented, not built |
| Hornet Close, Pysons Road Industrial Estate - Energy Storage Facility Hornet Close, Pysons Road Industrial Estate, Broadstairs | AMP Clean Energy Services | 0.2 | Consented, not built |
| Mackenders Close - Micro Energy Storage Facility Adj To Hawkes Road, Eccles, Aylesford | AMP Energy Services Limited | 0.2 | Consented, not built |
| Markerstudy Business Park, Wraik Hill - Micro Energy Storage Prospect House, Markerstudy Business Park, Wraik Hill, Whitstable | Zake Sovereign Limited | 0.2 | Consented, not built |
| Micro energy storage facility Tonbridge Road, Pembury, Tonbridge | AMP Energy Services Limited | 0.2 | Consented, not built |
| Sandyhurst Lane, Boughton Aluph - Energy Storage Facility Electrical Substation North of, 314-316 Sandyhurst Lane | AMP Clean Energy | 0.2 | Consented, not built |
| Stanhope Road, Kingsnorth - Micro Energy Storage Facility North side of Summerhill, Stanhope Road | AMP Clean Energy | 0.2 | Consented, not built |
| Beechings Way, Eastcourt Lane - Battery Energy Storage System Beechings Way And Eastcourt Lane | AMP Clean Energy | – | Consented, not built |
| Britton Court Farm, Hackington Road - Battery Energy Storage Britton Court Farm, Hackington Road, Tyler Hill, Canterbury | Renewable Connections Developments Limited | – | Consented, not built |
| Chimmens Solar Farm Chimmens Solar Farm Land At Speedgate Farm Mussenden Lane Horton Kirby | RES Limited | – | Consented, not built |
| Commonwork Organic Farms Limited, Bore Place - Battery Storage Commonwork Organic Farms Ltd Bore Place Bore Place Road | Charles Holt Consultancy | – | Consented, not built |
| Eckley Farms, Marden - Solar Energy Farm N/O Little Cheveney Farm, Sheephurst Lane, Marden | Statkraft Wind UK Limited | – | Consented, not built |
| Medway One - Energy Hub Former Kingsnorth Power Station, Eschol Road, Hoo St Werburgh, Rochester | Low Carbon Limited | – | Consented, not built |
| Raspberry - Battery Storage NW/O Iwade, Sittingbourne | RWE | – | Consented, not built |
| Stonestreet Green - Solar Farm & Battery Storage Stonestreet Green, Aldington, Ashford | Evolution Power | – | Consented, not built |
| Old Rides Farm, Leysdown Road - Battery Energy Storage System Old Rides Farm, Leysdown Road, Eastchurch, Sheerness | Nat Power | 1,000 | In planning |
| Manor Farm, Dartford Road - Energy Storage System Dartford Road, Bexley | Net Zero Thirty Three Limited | 212 | In planning |
| Elvington Battery Energy Storage South & E/O Thornton Road, Tilmanstone, Deal | Pathfinder Clean Energy UK Limited | 49.5 | In planning |
| Idleigh Court Road, New Ash Green - Solar Array S/O Idleigh Court Road & E/O Hartley Bottom Road, New Ash Green, Gravesend | Evolution Power | 15 | In planning |
| Corona Terrace And Hollow Lane - Micro Energy Storage System Jnct Of Corona Terrace And Hollow Lane, Snodland | AMP Clean Energy | 0.2 | In planning |
| Platt Industrial Estate,Maidstone Road - Micro Energy Storage Facility Maidstone Road, Isles Quarry West, Platt, Borough Green, Sevenoaks | Aggregated Micro Power Holdings Plc | 0.2 | In planning |
| Elmley Road, Minster-On-Sea - Solar Farm & BESS East Of Sheppey Way Minster-on-sea Kent | British Solar Renewables Limited | – | In planning |
| Stangate West Landfill Site, Quarry Hill Road - Solar Park & Battery Stangate West Landfill Site, Quarry Hill Road, Borough Green | Infinis Solar Development Limited | – | In planning |
Battery storage in Lanarkshire
21 projects, 3,672 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Wishaw Battery Storage Facility Netherton Street Netherton Wishaw | Zenobe Energy | 50 | Operating |
| East Kilbride - Battery storage North E/O East Kilbride, 275kv Grid Substation, Cairnmuir Road, East Kilbride, Moffat | Engie Regeneration Limited | 49.9 | Operating |
| Coalburn II Energy Storage Facility - Battery Storage Facility Broken Cross Open Cast Mine Tower Road Douglas Lanark | Alcemi Storage Development Limited | 1,000 | Under construction |
| Muttonhole Road - Battery Storage Muttonhole Road, Brackenhill Park, Limekilnburn | Advanced Grid Solutions Limited | 500 | Consented, not built |
| Redshaw Battery Energy Storage 3km Se/O Douglas, 4km Nw/O Crawfordjohn, Biggar | BayWa r.e. UK Limited | 500 | Consented, not built |
| Newarthill Energy Park Legbrannock Road, Newarthill | Geocore Limited | 300 | Consented, not built |
| Cornhills Farm, Muttonhole Road - Battery Storage Cornhills Farm Muttonhole Road Hamilton | Big Battery (Sheriff Faulds Farm 1) Limited | 49.9 | Consented, not built |
| Milton Farm - Energy Storage System Milton Farm, Moffat | Renewco Power | 49.9 | Consented, not built |
| Biggar Road, Cleland - Battery Energy Storage System E/O Biggar Road, Cleland., Motherwell | Starlight Energy SPV 1 Limited | 30 | Consented, not built |
| Burnbank Street, Greenhill - Battery Storage Facility S/O Burnbank Street, Greenhill | Renewable Connections Developments Limited | 30 | Consented, not built |
| Langlands Gate, East Kilbride - Battery Energy Storage Langlands Gate, East Kilbride, Glasgow | Advanced Grid Solutions Limited | 30 | Consented, not built |
| Fernishaw Solar Farm & Battery Energy Storage Facility east of Fernieshaw Road and west of Muiredge and Jersey Road, Cleland | Elgin Energy (EEB67) | 25 | Consented, not built |
| Hagshaw Hill Hagshaw Hill Wind Farm, Douglas, Lanark | Scottish Power Renewables | 20 | Consented, not built |
| High Netherfauld House Farm 1, Tower Road - Battery Energy Storage System 390m Nnw/O High Netherfauld House Farm, Tower Road, Douglas | ESB (Harker) Limited | 502 | In planning |
| Hagshaw Energy Cluster – Western Expansion Hagshaw Hill Farm | 3R Energy Solutions Limited | 225 | In planning |
| Daer Wind Farm Land east of Daer Reservoir, South Lanarkshire/Dumfries and Galloway | E.ON Climate & Renewables UK Developments | 100 | In planning |
| Rivox Wind Farm - Wind farm Rivox Wind Farm Lowther Hills West Of Moffat | Belltown Power Limited | 90 | In planning |
| M74 West Renewable Energy Park M74 West Renewable Energy Park, Lanark, Strathclyde | Renewco Power | 50 | In planning |
| Malcolmwood Farm, Loanend Road - Battery Energy Storage System Malcolmwood Farm, Loanend Road, Blantyre | Bluestone Energy | 49.5 | In planning |
| Grayside Wind Farm Approximately 1.7km south of Lamington and 5.7km north east of Abington | Grayside WF | 20 | In planning |
| Newhouse, Biggar Road - Battery Energy Storage Biggar Road Newarthill | Ampyr Distribution Energy | – | In planning |
Battery storage in Lancashire
53 projects, 3,090 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Astra Centre, Royal Barn Road - Energy Storage R/o Astra Centre, Royal Barn Road, Rochdale | Masdar Arlington Energy Limited | 35 | Operating |
| Charnock Richard - Battery Storage Scrap Yard Town Lane Charnock Richard Chorley | Pulse Clean Energy | 30 | Operating |
| Lascar Works Lascar Works, Tanpits Road, Bury, BL9 5BY | Anesco | 20 | Operating |
| Clifton Marsh Waste Water Treatment Works CLIFTON MARSH WASTE WATER TREATMENT WORKS, PRESTON NEW ROAD, FRECKLETON | United Utilities | 2 | Operating |
| Lathom (Pilkington Technical Centre) Battery Storage Land To The E/O Lords Cottage, Hall Lane, Lathom, Ormskirk, Lancashire | Lightsource BP | 2 | Operating |
| Widow Hill, Balderstone Lane - Battery Energy Storage System Balderstone Lane, Burnley | P3P Partners LLP | 70 | Under construction |
| Whitegate Battery Storage The National Grid Station, Broadgate, Chadderton, Oldham | Pelagic Energy (Constantine Energy) | 57 | Under construction |
| Unit 5 XL Business Park Unit 5, X L Business Park, Statham Road, Skelmersdale, Lancashire | Amber Infrastructure Group | 49.9 | Under construction |
| Mount Pleasant Farm, Green Lane - Battery Storage Adjacent Mount Pleasant Farm, Green Lane, Barton | Barton Battery Storage | 45 | Under construction |
| Chadderton - Battery energy storage facility Unit 12 Howarth Court Gateway Crescent Chadderton Oldham | Field | 20 | Under construction |
| The Glowhouse The Glowhouse Limited, Moss Side Industrial Estate, Leyland | AMP Clean Energy | 5 | Under construction |
| Balle Street Land off, Balle Street, Darwen, Lancashire | STOR Power | – | Under construction |
| Fanny House Farm, Bay Gateway - Battery Storage Fanny House Farm, Heaton With Oxcliffe, Morcambe | Innova Renewables | 940 | Consented, not built |
| Avondale Nurseries, Spa Lane - Battery Energy Storage Avondale Nurseries, Spa Lane, Lathom, Ormskirk | Sandbrook Capital Bes Limited | 320 | Consented, not built |
| Bay Gateway - Battery Storage Facility North Of A683 Bay Gateway Heaton With Oxcliffe | Energi Generation | 200 | Consented, not built |
| Heysham Energy Storage Project N/O A683 Lancaster, Morecambe Bypass, Morecambe | Kona Energy Limited | 200 | Consented, not built |
| Hillside Farm, Lancaster Road - Battery Storage Hillside Farm Lancaster Road Heaton With Oxcliffe | Hamilton March | 100 | Consented, not built |
| The Old Vicarage, Reedley - Battery Storage Sw/O The Old Vicarage, Greenhead Lane, Reedley, Burnley | European Energy A/S | 100 | Consented, not built |
| Walshaw House, Regent Street - Battery Energy Storage Walshaw House, Regent Street, Nelson | R B Business Park Limited | 100 | Consented, not built |
| North Side Bay Gateway, Heysham - Battery Energy Storage North Side Bay Gateway, Heysham, Morecambe | Cragside Energy Limited | 90 | Consented, not built |
| Knuzden Moss Farm, Oswaldtwistle - Battery Energy Storage System Knuzden Moss Farm, Stanhill Road, Oswaldtwistle, Accrington | Root Power (North) Limited | 60 | Consented, not built |
| Penwortham - Battery storage Electricity Sub Station 210M From National Grid Sub Station, Howick Cross Lane 4M From Unn Howick Cross Lane Penwortham | Shaw-Energi Limited | 57 | Consented, not built |
| The Rake, Lower Jowkin Lane - Battery Energy Storage The Rake, Lower Jowkin Lane & Furbarn Road, Rochdale | Shaw-Energi Limited | 57 | Consented, not built |
| Lancaster Power Extension, Middleton Road - Energy Storage Facility S/O Middleton Clean Energy Plant, Middleton Road, Middleton, Morecambe | Infra Balance New Energy | 50 | Consented, not built |
| Middleton Clean Energy Plant Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe | Infra Balance New Energy | 49.9 | Consented, not built |
| Slack Lane, Westhoughton - Battery Energy Storage System West of Slack Lane, Westhoughton | Foundation Property & Capital Group | 45 | Consented, not built |
| Ellenroad Farm, Bentgate Street - Battery Energy Storage System Ellenroad Farm, Bentgate Street, Milnrow | Root Power (North) Limited | 30 | Consented, not built |
| West Moss Lane, Higher Ballam - Battery Energy Storage System West Moss Lane, Higher Ballam, Lytham St Annes | Lower 48 Energy BESS Limited | 30 | Consented, not built |
| Bristol Avenue - Battery Energy Storage Facility 281 BRISTOL AVENUE, BLACKPOOL | Henco International Limited | 25 | Consented, not built |
| Caton Road, Lancaster - Battery Storage Facility The North East Of Kidds Transport Limited Caton Road Lancaster | Energi Generation & Infinis Energy | 25 | Consented, not built |
| Davies Road - Whitebirk Battery Storage Davies Road, Blackburn | Field | 25 | Consented, not built |
| Peel Road - Battery Storage Peel Road, Opp Sub Station, Westby With Plumptons, Blackpool | Energi Generation | 20 | Consented, not built |
| Vause Farm - Battery Storage North Of Vause Farm Town Lane Charnock Richard | Sirius Renewable Energy Limited | 20 | Consented, not built |
| Park Road Battery Storage Park Road, Bacup | Arlington Energy Limited Avery Energy | 10 | Consented, not built |
| Cocker Avenue - Energy storage facility Unit 23, Cocker Avenue, Poulton Le Fylde | AMP Energy Services Limited | 7.5 | Consented, not built |
| Union Court Storage Facility Unit 1b Union Court, Union Road Bolton | Infinis Solar Developments Limited | 4.8 | Consented, not built |
| Chadderton - Battery Storage System Bentfield Industrial Units Stockfield Road Chadderton, Oldham | Zetex Plc | 2.5 | Consented, not built |
| Accrington and Rossendale College, Sandy Lane - Battery Storage Accrington & Rossendale College, Sandy Lane, Accrington | Nelson & Colne College | 1 | Consented, not built |
| Nelson and colne college, Scotland Road Nelson And Colne College Scotland Road | Nelson & Colne College | 1 | Consented, not built |
| Crown Business Park, Cowm Top Lane, Unit 7 - Energy Storage System Unit 7 Crown Business Park, Cowm Top Lane | AMP Clean Energy | 0.2 | Consented, not built |
| Moss Side Way - Micro Energy Storage Moss Side Way Moss Side | AMP Clean Energy | 0.2 | Consented, not built |
| Scot Lane - Micro Energy Storage System Scot Lane, Blackrod, Bolton | AMP Clean Energy | 0.2 | Consented, not built |
| Strawberry Fields Business Park, Berry Way - Energy Storage System Strawberry Fields Business Park Berry Way Euxton | AMP Clean Energy | 0.2 | Consented, not built |
| Archway Travel, Copse Road - Battery Storage Facility Archway Travel, Copse Road, Fleetwood | Renepower Energy Limited | – | Consented, not built |
| Dig Gate Lane - Battery Energy Storage Dig Gate Lane, Kingsway Business Park, Rochdale | Balance Power Projects Limited | – | Consented, not built |
| Former Bull & Butcher Pub - Battery Energy Storage Rossendale House 63 Rossendale Avenue Burnley | LNT Care Developments | – | Consented, not built |
| Gladstone Street, Little Harwood - Battery Energy Storage Facility Gladstone Street, Little Harwood, Blackburn | Conrad Energy (Developments) Limited | – | Consented, not built |
| Lowland Farm, Peel Road - Battery Energy Storage Facility Lowland Farm, Peel Road, Westby With Plumptons, Blackpool | Max Design Consultancy | 100 | In planning |
| Howick Hall Farm - Battery Storage Facility Howick Hall Farm Howick Cross Lane Penwortham Preston Lancashire PR1 0NS | Penwortham Storage Limited | 49.9 | In planning |
| Lowerfields Farm, Warren Lane - Battery Energy Storage System Lowerfields Farm Warren Lane | Renewable Connections Developments Limited | 27 | In planning |
| Green Energy Park, Eyes Lane - BESS Green Energy Park, Asland Walks Eyes Lane, Bretherton, Chorley | GA Pet Food Partners Group Limited | 5 | In planning |
| Shuttleworth Mead, Blackburn Road - Micro Battery Storage Unit 12 Shuttleworth Mead, Blackburn Road | AMP Clean Energy | 0.2 | In planning |
| he Yard, Holme Road, Burnley - Battery Storeage The Yard, Holme Road, Burnley | Larkfleet Group | – | In planning |
Battery storage in Leicestershire
31 projects, 3,021 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| National Grid Enderby Substation National Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire | Gore Street | 57 | Operating |
| Enderby Storage, Redcomb Farm Land Opposite Redcomb Farm, Desford Road, Lubbesthorpe, Leicester, Leicestershire | Statera Energy & Gresham House | 49.9 | Operating |
| Asfordby Business Park (1) Zone P, Asfordby Business Park, Welby Road, Melton Mowbray | UK Power Reserve | 23.4 | Operating |
| Hill Farm - Energy Barn Hill Farm, Spring Lane, Packington, Ashby de la Zouch, Leicestershire | Anesco& Green Hedge Energy UK | 10 | Operating |
| Land at and adjacent to Leicester Forest Services Leicester Forest East Services (Baines Lane), Adjoining Land And Land Adjacent To 61 Goodheart Way | Camborne Energy Storage | 1.5 | Operating |
| Swinford Battery Energy Storage System Swinford, Lutterworth | NatPower UK | 1,000 | Consented, not built |
| Normanton Energy Reserve - Battery Storage NW/O Earl Shilton Road Thurlaston | Exagen SPVO2 Limited | 500 | Consented, not built |
| West Thorpe Church Farm, Willoughby On The Wolds - Battery Energy Storage West Thorpe Church Farm, Willoughby On The Wolds, Loughborough | Integrum Renewable Energy Limited | 25 | Consented, not built |
| Albion Road - Micro Energy Storage South side of Albion Road Sileby | AMP Clean Energy | 0.2 | Consented, not built |
| Beacon Road, Epinal Way - Micro Energy Storage Verge of roundabout where Beacon Road meets Epinal Way | AMP Clean Energy | 0.2 | Consented, not built |
| Dysart Way, Birstall Street - Micro Energy Storage Dysart Way between Dysart Way and Birstall Street | AMP Clean Energy | 0.2 | Consented, not built |
| Enderby Leisure Centre, Mill Lane - Energy Storage System Enderby Leisure Centre, Mill Lane, Enderby, Leicester | AMP Clean Energy | 0.2 | Consented, not built |
| Gynsill Lane, Leicester Road - Micro Energy Storage Gynsill Lane meets Leicester Road Anstey | AMP Clean Energy | 0.2 | Consented, not built |
| Park View Street - Micro Energy System New Parks Boulevard, grass verge between New Parks Boulevard and New Parks Way | AMP Clean Energy | 0.2 | Consented, not built |
| Showground Way, Barleythorpe - Energy Storage Facility Rutland Showground, Showground Way, Barleythorpe, Rutland | AMP Clean Energy | 0.2 | Consented, not built |
| Derby Road, Lond Whatton - Battery Storage A6 Derby Road, Zouch, Lond Whatton | Aura Power BESS Limited | – | Consented, not built |
| Hydes Lane, Stretton Baskerville - Battery Storage N/O Hydes Lane, Stretton Baskerville, Hinckley | Balance Power Projects Limited | – | Consented, not built |
| Lodge Farm - Solar Farm & Battery Storage Wistow Estate Fleckney Road Wistow | Elgin Energy ES Co Limited | – | Consented, not built |
| Long Whatton - Solar Farm W/O Hathern Road Long Whatton | Endurance Energy Oakley Limited | – | Consented, not built |
| Lumiere - BESS The Sw/O Pickwell Lane, Whissendine, Rutland | RWE Renewables UK Limited | – | Consented, not built |
| Nottingham Road - Battery Storage The E/O Loughborough on the South side of A60/Nottingham Road Loughborough | NextPower SPV 9 Limited | – | Consented, not built |
| Braybrooke Battery Energy Storage System Kettering Road, Harborough Road, Braybrooke, Market Harborough | Aura Power Developments Limited | 500 | In planning |
| Eckland Lodge Farm, Braybrooke - Battery Energy Storage System Eckland Lodge Farm, Park Hill (land to West) Dingley Road (land to South), land to North of railway line, Braybrooke | Regener8 Power Limited | 500 | In planning |
| Braybrooke Village North, Harborough Road - Battery Energy Storage System Braybrooke Village, North, Harborough Road, Market Harborough | Elmya Energy Limited | 252 | In planning |
| Desborough Airfield, Desborough Road - Solar Farm & Energy Storage Desborough Airfield Desborough Road Stoke Albany | Innova Renewables | 100 | In planning |
| Beveridge Lane, Meets Regs Way - Micro Battery Storage North Of Beveridge Lane Where It Meets Regs Way Bardon Hill | AMP Clean Energy | 0.2 | In planning |
| Enderby Road Industrial Estate, Enderby Road - Battery Storage Adj Unit 16, Enderby Road Industrial Estate, Enderby Road, Whetstone, Leicester | AMP Clean Energy | 0.2 | In planning |
| Charley Road - Solar Farm Charley Road Nanpantan | Namene Solar | – | In planning |
| Forest Road - Energy Storage System W/O Enderby, Leicester | Innova Renewables | – | In planning |
| Freeby Lane, Green Energy Park - Solar Panels & Battery Storage Freeby Lane, Green Energy Park, Waltham On The Wolds | Downing Renewable Developments | – | In planning |
| Potters~ Hill - Battery Energy Storage Near To Potter Hill, Nottingham Road, Melton Mowbray | JBM Solar Projects 39 Limited | – | In planning |
Battery storage in Lincolnshire
70 projects, 6,460 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Leverton Farm - Energy Barn Leverton Farm, Birch Holt Farm, Burton Lincoln, Lincoln | Eelpower | 10 | Operating |
| Trondheim Way Battery energy storage Land At Trondheim Way Stallingborough | Vox Burns Limited | 80 | Under construction |
| Conesby Solar Farm Conesby Data Centre, Normanby Road | Rivington Energy | 72 | Under construction |
| Cowbridge Road, Bicker Fen - Battery Storage W/O Cowbridge Road, Bicker Fen, Boston | AGR Solar 2 Limited | 50 | Under construction |
| Sweetbriar Farm - Battery Energy Storage System S/O Sweetbriar Farm, Ulceby | Lightrock Power Limited | 800 | Consented, not built |
| Beacon Fen Energy Park E/O Sleaford, Btw Heckington & Helpringham, Sleaford | Low Carbon Limited | 600 | Consented, not built |
| Spalding Energy Park - Battery Storage Spalding Power Station West Marsh Road Spalding | Intergen Limited | 550 | Consented, not built |
| Bicker Fen Bess, Vicarage Drove - Battery Storage Bicker Fen BESS, Land off Vicarage Drove, Bicker Fen | FRV TH Powertek Limited | 400 | Consented, not built |
| Stallingboroughe, Stallingborough Road - BESS W/O A1173 Stallingborough, E/O Stallingborough Road, Keelby, Grimsby | Island Green Power | 375 | Consented, not built |
| Bicker Drove - Battery Energy Storage System N/O Bicker Drove, Boston | Net Zero Twenty Two Limited | 100 | Consented, not built |
| Little Hale Drove, Little Hale Fen - Battery Storage Lying To The South Of Little Hale Drove Little Hale Fen | Root-Power (South) Limited | 99 | Consented, not built |
| Scawby Brook, Brigg - Battery Storage Power Station Access Roads To Power Station, Scawby Brook Brigg | Centrica Plc | 99 | Consented, not built |
| Winterton Road - Battery Energy Storage N/O Gala Bingo, Winterton Road, Scunthorpe | Newton Energi Limited | 95 | Consented, not built |
| Little Crow Solar Park Land located 0.6km to the east of the British Steel site at Scunthorpe | INRG Solar | 90 | Consented, not built |
| Europa Way - Battery Storage Facility 1 Adj Europa Way, Grimsby | Newton Energi Limited | 80 | Consented, not built |
| Netherlands Way - Battery Energy Facility Netherlands Way, Immingham, Grimsby | Volta Energy Group | 80 | Consented, not built |
| Little Hale Fen - Solar Farm Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln | AGR Solar 2 Limited | 50 | Consented, not built |
| Hewitts Avenue, New Waltham - Battery Storage Adjacent To YEB Sub Station Hewitts Avenue New Waltham | Harmony HS (JB) Limited | 49.9 | Consented, not built |
| Immingham Solar Farm - Battery Storage Facility Adj To A180, To S/O Immingham, Immingham | One Planet Developments Limited | 30 | Consented, not built |
| North Lincolnshire Green Energy Park Flixborough Wharf, Flixborough Industrial Estate, Scunthorpe | Solar 21 Renewable Energy Limited | 30 | Consented, not built |
| Ash Tree Solar Farm & Battery Storage High Dike Road Londonthorpe | Low Carbon Limited | 25 | Consented, not built |
| Vicarage Drove - Solar farm & Battery storage Land at Vicarage Drove, Bicker, Boston | Renewable Connections Developments Limited | 20.5 | Consented, not built |
| West Burton Solar Project E/O River Trent, S/O the A1500 & N/O Saxilby, West Lindsey, Lincoln | Island Green Power | 20 | Consented, not built |
| Bradley Road - Battery Energy Storage System W/O Bradley Road, Grimsby | Renewable Connections Developments Limited | 10 | Consented, not built |
| Manor Farm Energy Storage Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness | Innova Renewables Limited | 10 | Consented, not built |
| Mallows Lane - Solar Farm & Battery Storage W/O Mallows Lane & N/O Pymoor Lane, Sibsey, Boston | Pathfinder Clean Energy UK Dev Limited | 5.3 | Consented, not built |
| Trondheim Way - Battery Storage Facility Trondheim Way, Stallingborough, Grimsby | Vox Energy Limited | 5 | Consented, not built |
| Boston Road - Energy Storage Facility E/O Boston Road, Spalding | AMP Clean Energy | 0.2 | Consented, not built |
| Boston West Business Park - Micro Energy Storage Rear of, Boston West Business Park, Sleaford Road | AMP Clean Energy | 0.2 | Consented, not built |
| Burton Lane - Micro Energy Storage Burton Lane End, Burton Waters, Lincoln | AMP Clean Energy | 0.2 | Consented, not built |
| Castle Sports Complex, Albion Street - Micro Energy Storage Castle Sports Complex, Albion Street, Spalding | AMP Clean Energy | 0.2 | Consented, not built |
| Chandlers Farm Equipment, Boston Road - Battery Storage Chandlers Farm Equipment Limited Boston Road | AMP Clean Energy | 0.2 | Consented, not built |
| Crease Drove, Crowland - Micro Energy storage Crease Drove Crowland | AMP Clean Energy | 0.2 | Consented, not built |
| Holbeach Road - Battery Energy Storage The South Side Of Holbeach Road, Spalding | AMP Energy Services Limited | 0.2 | Consented, not built |
| Ingoldmells Road, Burgh Le Marsh - Battery Storage Ingoldmells Road And A158, Burgh Le Marsh, Skegness | AMP Clean Energy | 0.2 | Consented, not built |
| Parkside Crescent - Micro Energy Storage Facility Parkside Crescent | AMP Energy Services Limited | 0.2 | Consented, not built |
| Roman Bank - Energy Storage Facility The North West Side Of Roman Bank, Spalding | AMP Energy Services Limited | 0.2 | Consented, not built |
| Sewage Pumping Station, Rookery Lane - Micro Energy Storage Sewage Pumping Station, Rookery Lane, Lincoln | AMP Clean Energy | 0.2 | Consented, not built |
| Sir Halley Stewart Playing Field, Winfrey Avenue - Battery Storage Sir Halley Stewart Playing Field, Winfrey Avenue, Spalding | AMP Energy Services Limited | 0.2 | Consented, not built |
| Whitehall-Belchmire Lane - Micro Energy Storage Facility Whitehall, Gosberton, Spalding | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Caudwell Farm, Hollbeach - Battery Storage Facility Caudwell Farm Holbeach St Matthews Spalding | Green Energy International | – | Consented, not built |
| Chapel Lane - Energy storage facility Chapel Lane, Keadby, Scunthorpe | Harmony Energy Storage | – | Consented, not built |
| Gate Burton - Solar & Energy Storage Park Gate Burton, Knaith Park & Willingham-by-Stow, Gainsborough | Low Carbon | – | Consented, not built |
| Gonerby Moor - Battery Storage South Of Cliff Lane Gonerby Moor | Lightsource BP | – | Consented, not built |
| Gunthorpe Road, Marsh -Battery Storage South of Gunthorpe Road Walpole Marsh Wisbech | Walpole Green Limited | – | Consented, not built |
| Hammond Bicker Fen - Battery Energy Storage System E/O Bicker Fen Substation, Bicker Fen, Boston | Bicker Drove Limited | – | Consented, not built |
| Heckington Fen Solar Park - Battery Storage Six Hundreds Farmhouse, Six Hundreds Drove East, Heckington, Sleaford, Boston | Ecotricity Limited | – | Consented, not built |
| Limes Farm Solar Farm & Battery Energy Storage Limes Solar Farm On Lands Circa 0.5km North Of Limes Farm Bourne | Downing Limited Liability Partnership | – | Consented, not built |
| New Earth Solutions West, High Dike - Solar Panels & Battery Srorage New Earth Solutions (West) Ltd, Copper Hill Industrial Estate, High Dike, Wilsford | New Earth Solutions (West) Limited | – | Consented, not built |
| Potterhill Farm - Battery Storage Northwest Of Meardsall Lane Swinderby | GridSource Limited | – | Consented, not built |
| Springwell, Lincoln - Springwell Solar Farm & Battery Storage Springwell Solar Farm, Springwell, Lincoln | EDF Energy Renewables | – | Consented, not built |
| Sutton Bridge Solar Farm - Walpole Battery Storage Sutton Bridge Solar Farm, Centenary Way, Sutton Bridge, Spalding | EDF Energy Renewables | – | Consented, not built |
| Tillbridge Solar Farm, Hemswell - Battery Storage Tillbridge Solar Farm, Hemswell | Tillbridge Solar Limited | – | Consented, not built |
| Vicarage Drove - Battery Storage Facility S/O Vicarage Drove, Bicker, Boston | Vicarage Drove Bess Limited (AGR Group) | – | Consented, not built |
| Vpi Power Station, Rosper Road, South Killingholme - Battery Storage Facility VPI Power Station, Rosper Road, South Killingholme | VPI Immingham Llp | – | Consented, not built |
| Welby Solar Farm, Welby - Battery Storage Welby Solar Farm, N/O Welby, Grantham | Island Green Power | – | Consented, not built |
| Willingham By Stow Farm, Marton Road - Battery Energy Storage System Willingham-By-Stow Farm, Marton Road, Stow, Gainsborough | FRV TH Powertek Limited | – | Consented, not built |
| Canners Lane Energy Park, High Dike - Battery Energy Storage East High Dike, Grantham | NatPower UK | 1,000 | In planning |
| Hill Rise, Coleby - Battery Energy Storage The S/O Hill Rise, W/O Coleby & N/O Navenby, Lincoln | Navenby Energy Limited | 1,000 | In planning |
| Green Man Road, Navenby - Battery Storage N/O Green Man Road, Navenby, Lincoln | Windel Energy & Canadian Solar | 400 | In planning |
| Stallingborough Road - Battery Storage Stallingborough Road, Grimsby | Island Green Power | 125 | In planning |
| Barfield Lane, Reepham - Battery Energy Storage System S/O Barfield Lane, Reepham, Lincoln | Fiskerton Bess Limited | 53 | In planning |
| Gunnerby Road - 30MW Battery Energy Storage E/O Gunnerby Road, Hatcliffe, Grimsby | Grenergy Renewables UK Limited | 30 | In planning |
| Marton Sewage Works, High Street - Battery Energy Storage Marton Sewage Works, High Street, Marton | Loire Capital Holdings Limited | 10 | In planning |
| Welton Gathering Centre, Sudbrooke - Battery Storage Welton Gathering Centre, Sudbrooke | Island Gas Limited | 3 | In planning |
| Pumping Station, Normanby Road - Micro Energy Storage Facility Ne/O Pumping Station, Normanby Road, Flixborough, Scunthorpe | AMP Clean Energy | 0.2 | In planning |
| Wardentree Lane - Battery Storage South of Wardentree Lane | AMP Clean Energy | 0.2 | In planning |
| Cottam Solar Project 6.5km SE/O and 4km NE/O Gainsborough, West Lindsey, Lincoln | Island Green Power | – | In planning |
| Fosse Green Energy 9km SW/O Lincoln, Lincoln | Windel Energy & Canadian Solar | – | In planning |
| Meridian Solar Farm - Battery Storage Meridian Solar Farm | Downing Renewable Developments | – | In planning |
Battery storage in London
9 projects, 422 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Clay Tye Farm Phase 1 - Storage Facility Clay Tye Farm, Clay Tye Road, Upminster | Harmony Energy Storage | 49.5 | Operating |
| Clay Tye Farm Phase 2 - Storage Facility Clay Tye Farm, Clay Tye Road, Upminster | Harmony Energy Storage | 49.5 | Operating |
| Western International Market (WIM) Site Western Int Market, Hayes Rd, Southall | London Borough of Hounslow | 0.2 | Operating |
| Southall Lane Waste Depot Waste Depot, Southall Lane, Southhall, Hounslow | London Borough of Hounslow | – | Operating |
| Riverside Resource Recovery Facility Battery Storage Riverside Energy From Waste Facility | Riverside Resource Recovery Limited | 2.5 | Under construction |
| Layhams Road - Battery Storage Facility N/O Warbank Social Club, Layhams Road, Keston | Penso Power (BW ESS) | 250 | Consented, not built |
| Mill Hill National Grid Substation National Grid Mill Hill Substa, Partingdale Lane, Barnet | Harbour Energy | 49.9 | Consented, not built |
| Riverside Energy Park Norman Road, Bexley, London | Cory Riverside Energy | 20 | Consented, not built |
| Custom House - Battery Energy Storage System Adj Custom House, Victoria Dock | Net Zero Marine Services Limited | 0.2 | Consented, not built |
Battery storage in Lothian
10 projects, 721 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Cockenzie Battery Storage System - Site A W/O Avenue Road, SE/O Edinburgh Road, S/O Ingis Farm, Cockenzie | Gresham House | 240 | Consented, not built |
| Cockenzie Battery Storage System - Site B W/O Avenue Road, SE/O Edinburgh Road, S/O Ingis Farm, Cockenzie | Gresham House | 102 | Consented, not built |
| Learielaw Farm, Learielaw - Battery Energy Storage Learielaw Farm, Learielaw, Broxburn | Intelligent Land Investments Group | 100 | Consented, not built |
| Duddingston Solar Farm and Battery Storage Duddingston, Newton, South Queensferry | Aithrie Net Zero Solar Limited | 20 | Consented, not built |
| Selms Muir - Solar Farm Selms Muir Kirknewton | Renewable Connections | – | Consented, not built |
| Trinlaymire Farm - Solar farm, Battery storage Trinlaymire Farm Threemiletown Linlithgow | Trinlaymire Net Zero Solar Limited | – | Consented, not built |
| Riccarton Mains Road - Battery Energy Storage 100 Metres N/O 81 Riccarton Mains Road | Miller Developments | 150 | In planning |
| Penicuik, Moorfoot Hills - Torfichen Wind Farm Sw/O Penicuik & Ne/O Stow, Moorfoot Hills, Gorebridge village, Edinburgh | RES Limited | 50 | In planning |
| Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage West Of Existing Kaimes Substation Old Burdiehouse Road | Kaimes Renewable Energy Park | 49.9 | In planning |
| Leyden Road - Battery Energy Storage S/O Leyden Road, Kirknewton | Trio Power Limited | 9 | In planning |
Battery storage in Merseyside
22 projects, 482 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Lister Drive Land Adjacent to Lister Drive, Carnegie Road, Liverpool | Arenko Cleantech & Stratcraft | 49.9 | Operating |
| Liverpool Energy Management Facility Land To The South Of, Carnegie Road, Liverpool | Statkraft UK | 49.9 | Operating |
| Land at Carnegie Road Carnegie Road, Liverpool, Merseyside | Ørsted | 20 | Operating |
| Burbo Bank Energy Storage Burbo Banks Electricity Sub Station, BRECK ROAD, POULTON | Ørsted | 2 | Operating |
| Hawthorne Road 491 Linacre Lane, Bootle, Merseyside | Bluefield Renewable Developments | 20 | Under construction |
| Crossens Pumping Station - Solar Array Crossens Pumping Station, Banks Road, Banks , Southport | Environment Agency | – | Under construction |
| Sutton Manor - Battery Storage Facility S/O National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens | Sizing John Limited | 57 | Consented, not built |
| Coopers Lane, Kirkby - Battery Storage Facility Coopers Lane, Kirkby, Liverpool | Pelagic Energy | 49.5 | Consented, not built |
| Lister Battery Limited - Battery Energy Storage System 126 Green Lane, Tuebrook, Liverpool | Lister Battery Limited | 6 | Consented, not built |
| Holiday Moss Landfill Site, Reeds Brow - Battery Storage Holiday Moss Landfill Site, Reeds Brow, Rainford, St Helens | Biffa Waste Services Limited | 3 | Consented, not built |
| Biffa Electricity Generating Compound, Burtonhead Road - Battery Storage Biffa Electricity Generating Compound And Gas Control Compound Former Ravenhead Landfill Site Burtonhead Road | Biffa Waste Services Limited | 1 | Consented, not built |
| Heysham Box, Leckwith Road - Battery Storage Heysham Box Leckwith Road Netherton Bootle L30 6UEHeysham Box Leckwith Road Netherton | AMP Clean Energy | 0.2 | Consented, not built |
| Heysham Box, Leckwith Road - Battery Storage Heysham Box Leckwith Road Netherton Bootle L30 6UEHeysham Box Leckwith Road Netherton | AMP Clean Energy | 0.2 | Consented, not built |
| Jeffrey Humble Playing Fields, Long Lane - Micro Energy Storage System Jeffrey Humble Playing Fields, Long Lane, Walton, Liverpool | AMP Clean Energy | 0.2 | Consented, not built |
| Leisure United Jericho Lane - Micro Energy Storage System Leisure United Jericho Lane, Otterspool Drive, Liverpool | AMP Clean Energy | 0.2 | Consented, not built |
| Leisure United Simpson - Micro Energy Storage System Leisure United Simpson, Hillfoot Road, Liverpool | AMP Clean Energy | 0.2 | Consented, not built |
| Biffa Waste Services, Dock Road South - Battery Storage Units Biffa Waste Services Limited, Dock Road South, Wirral | Biffa Waste Services Limited | – | Consented, not built |
| Rowan View Hospital, Villas Road - Battery Storage Rowan View Hospital, Villas Road, Sefton, Liverpool | Mersey Care NHS Trust | – | Consented, not built |
| Speke Hall Avenue - Battery Energy Storage System The W/O Speke Hall Avenue, Liverpool | Beryl Street Generation Limited | – | Consented, not built |
| Perimeter Road, Kirkby - Battery Energy Storage E/O Perimeter Road, Kirkby, Liverpool | Unknown | 165 | In planning |
| Cut Lane - Battery Energy Storage System N/O Cut Lane, Liverpool | Pivoted Power Llp | 57 | In planning |
| Millfield Lane, Haydock Industrial Estate - Micro Energy Storage The West Of Millfield Lane Haydock Industrial Estate Haydock | AMP Clean Energy | 0.2 | In planning |
Battery storage in Mid Glamorgan
12 projects, 668 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Pound Farm Lane - Battery Storage Pound Farm Lane, Tonteg, Pontypridd | Pulse Clean Energy | 200 | Consented, not built |
| Mynydd Maen Solar Farm (Cil-Lonydd) Cil-Onnydd Farm, Newbridge, Caerphilly | Cenin Renewables Limited | 35 | Consented, not built |
| Biffa Waste Services, Fochriw Road - Battery Storage Biffa Waste Services Ltd Trecatti Landfill Site Fochriw Road Pant-y-waun | Biffa Waste Services | 2 | Consented, not built |
| Rhydycar Business Park - Battery Energy Storage Systems Welsh Assembly Government Rhydycar Business Park | Welsh Assembly Government | 0.4 | Consented, not built |
| Ynyswen Industrial Estate, Ynys-Wen - Unit 36 - Battery Energy Storage Storm Front, Unit 36, Ynyswen Industrial Estate, Ynys-Wen, Treherbert, Treorchy | AMP Energy Services Limited | 0.4 | Consented, not built |
| Great Western Avenue, Coity Road - Battery energy storage NW/O Coity Road (West of Great Western Avenue) Bridgend | Power Initiatives Limited | – | Consented, not built |
| Upper Ogmore Wind Farm Upper Ogmore Wind Farm & Energy Storage Facility | RES UK & Ireland Limited | – | Consented, not built |
| Cefn Farm, Mount Road - Battery Energy Storage System Cefn Farm, Mount Road Rhigos | Tec Marina | 200 | In planning |
| National Road, Cilfynydd - Battery Energy Storage System North & S/O National Road, Cilfynydd, Pontypridd | Rewe 2 Limited | 200 | In planning |
| Llanwonno - Wind Farm Llanwonno, Phase 2 Wind Farm, Llwycelyn, Pontypridd | Cenin Renewables Limited | 30 | In planning |
| Coedcae Industrial Estate, Talbot Green - Micro Energy Storage Systems A473, Outside Coedcae Industrial Estate Talbot Green | AMP Clean Energy | 0.2 | In planning |
| Llanwonno Road, Ferndale Road - Micro Energy Storage Llanwonno Road Nr Ferndale Road | AMP Clean Energy | 0.2 | In planning |
Battery storage in Middlesex
2 projects, 49.9 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Long Lane, Stanwell - Battery Energy Storage E/O Long Lane, Stanwell, Staines | Harwood Project One Limited | 49.9 | Consented, not built |
| Heathrow Flightpath Car Park, Bath Road - Battery Energy Storage System NCP Car Park. Bath Road, Sipson | LPH UK 1 | – | Consented, not built |
Battery storage in Midlothian
1 project, 200 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Salters Battery Energy Storage System South of A68 and approximately c80m North of Dalkeith High School | Buccleuch Group | 200 | Consented, not built |
Battery storage in Moray
7 projects, 849 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Blackhillock Electricity Substation - Battery Energy Storage System 400m SE/O Blackhillock Electricity Substation, Keith | Zenobe Energy Limited | 300 | Under construction |
| Gibson Farm, Blackhillock - Battery Energy Storage System Gibsons Farm, Blackhillock, Keith | Noriker Power Limited | 349 | Consented, not built |
| Clash Gour located to the southwest, north and east of Berry Burn | EDF Energy Renewables& Force 9 | 50 | Consented, not built |
| Clashindarroch Wind Farm Extension Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie | Infinergy | 50 | Consented, not built |
| Corshellach Battery Energy Storage W/O Berryburn Substation, Forres | RES Limited | 49.9 | Consented, not built |
| Kellas Wind Farm 10km SW/O Elgin | E Power Limited | 30 | Consented, not built |
| Dorenell Extension Wind Farm 10 km south of Dufftown | Galileo | 20 | In planning |
Battery storage in Neath Port Talbot
2 projects, 22 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Pen y Cymoedd Energy Storage Pen y Cymoedd, Neath Port Talbot | Vattenfall | 22 | Operating |
| Mynydd y Gwryhd Solar Farm Land To The West Of, Cwmgors On Mynydd Uchaf, Adjoining Community Wind Turbi, Swansea, West Glamorgan | Awel Aman Tawe | – | Consented, not built |
Battery storage in Norfolk
42 projects, 3,174 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Hall Farm, West End Northwold - Solar Farm 90 West End Northwold, Thetford | Ampyr Solar Europe | 7.5 | Operating |
| North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme Manor Farm Crossdale Street Northrepps Cromer | Next Energy | 6 | Operating |
| The Everest System Lotus Car Factory, Potash Ln, Hethel, Norwich NR14 8EZ | Connected Energy | 0.1 | Operating |
| Hornsea Project Three - Battery Storage E/O Main Road, Swardeston | Orsted Power (UK) Limited | 300 | Under construction |
| Colton - Solar photovoltaic farm, Battery storage E/O Barnham Broom Road Colton | Pathfinder Clean Energy UK Dev Limited | 30 | Under construction |
| Bracon Ash Solar Land East Of Cranes Road Hethel Norfolk, Norwich | Luminous Energy Ltd | – | Under construction |
| Wymondham Road, Bracon Ash - Battery Energy Storage System W/O Wymondham Road, Bracon Ash, Norwich | Green Switch Capital | 228 | Consented, not built |
| Stoke Lane - Battery Energy Storage N/O Stoke Lane Dunston | FPC Electric Land Limited | 130 | Consented, not built |
| Hill Farm, Wacton Road - Battery Energy Storage System North Of Hill Farm Wacton Road Forncett St Peter | Green Switch Capital Limited | 120 | Consented, not built |
| Hickling Lane, Swainsthorpe -Battery Storage Land North Of Hickling Lane Swainsthorpe | EDF Energy Renewables | 114 | Consented, not built |
| Admiralty Road - Battery Energy Storage Facility South & E/o Admiralty Road, South Denes, Great Yarmouth | Abbey Power Solution Limited | 50 | Consented, not built |
| High Road, Saddlebow - Battery Storage NW of High Road Saddlebow | Lynn Power Limited | 50 | Consented, not built |
| Shereford Road, West Raynham Estate - Battery Energy Storage System S/O Shereford Road, West Raynham Estate, Hempton, Fakenham | Bluefield Renewable Developments Limited | 50 | Consented, not built |
| Norwich Substation Storage Facility Norwich Main Substation, Mangreen Hall Lane, Dunston, Norwich, Norfolk | Pivot Power | 49.9 | Consented, not built |
| Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage Estuary Farm, Edward Benefer Way, Kings Lynn | Namene Solar | 15 | Consented, not built |
| Three Bridges Solar Farm Three Bridges Solar Farm | Pathfinder Clean Energy UK Dev Limited | 15 | Consented, not built |
| Scottow Solar Farm - Battery Storage Adj Scottow Solar Farm, Scottow Innovation Park, Badersfield, Norwich | Connected Energy Limited | 4.3 | Consented, not built |
| Uphouse Farm - Sandpits Solar Farm & Battery Energy storage Uphouse Farm Swaffham Road South Raynham | Uphouse Farms Limited | 2.4 | Consented, not built |
| Burtt Way, Great Plumstead - Solar Battery Storage 2 Burtt Way, Great Plumstead, Norwich | Delta Fire Limited | 0.3 | Consented, not built |
| Long Stratton Leisure Centre, Long Stratton - Battery Long Stratton Leisure Centre, Swan Lane, Norwich | South Norfolk District Council | 0.3 | Consented, not built |
| Wymondham Leisure Centre, Norwich Road - BESS Wymondham Leisure Centre, Norwich Road, Wymondham | South Norfolk and Broadland Council | 0.3 | Consented, not built |
| Cromer Road - Micro Energy Storage Facility Cromer Road, East Runton, Cromer | AMP Energy Services Limited | 0.2 | Consented, not built |
| Thetford Sports Centre - Battery Energy Storage Solution Thetford Sports Centre, Croxton Road, Thetford | Parkwood Leisure Limited | 0.2 | Consented, not built |
| Docking Farm Solar Land North Of The Street, Cawston, Norwich | Metka EGN Projects Limited | – | Consented, not built |
| Flordon Road, Bracon Ash - Solar Panels & Battery Storage Land Off Marsh Lane Bracon Ash | Ralos Projects Limited | – | Consented, not built |
| Jafa, Great Dunham - Solar Photovoltaic Farm & Battery Storage Great Dunham, Palgrave Road, Kings Lynn | Low Carbon UK Solar Investment Co Limited | – | Consented, not built |
| Mangreen Hall Lane - Battery Storage Land Off Mangreen Hall Lane, Dunston, Norwich | Brockwell Energy Limited | – | Consented, not built |
| Meerdyke Solar Panels & Battery Storage SE of Poplar Farm Harps Hall Road Walton Highway | Downing Renewable Developments Llp | – | Consented, not built |
| Nowhere Lane, Norwich - Battery Energy Storage E/O Nowhere Lane, Reepham, Norwich | Albanwise Synergy Limited | – | Consented, not built |
| Sandringham Estate - Battery Storage Facility S/O Admirals Drive, Sandringham, Kings Lynn | Royal Sandringham Estate | – | Consented, not built |
| Sedgeford Hall Estate - Solar Panels & Battery Storage Sedgeford Hall Estate, Fring Road, Sedgeford, Kings Lynn | Regener8 Power | – | Consented, not built |
| Sluice Road, Wiggenhall St Germans - Solar Array & Battery Storage Sluice Road Wiggenhall St Germans | Power Different Limited | – | Consented, not built |
| Suggenhall Farm - Photovoltaic Solar Array & Battery Storage The S/O Suggenhall Farm Church Lane Rickinghall | RNA Energy Limited | – | Consented, not built |
| The Grange Solar Farm & Battery Storage Grange Farm, Old Bury Road, Palgrave, Diss | Pathfinder Clean Energy UK Dev Limited | – | Consented, not built |
| The Park Farm, Birds Corner - Battery Energy Storage The Park Farm, Birds Corner, Shipdham, Thetford | Regener8 Power Limited | 800 | In planning |
| Hall Farm, Hickling Lane - Battery Energy Storage Hall Farm North Of Hickling Lane Swainsthorpe | Innova Renewables Developments Limited | 400 | In planning |
| Market Lane And Carr Lane, Great Moulton - Battery Energy Storage System N/O Jnct Of Market Lane And Carr Lane, Great Moulton, Norwich | Field Long Stratton Limited | 400 | In planning |
| Mulbarton Road, Keswick - Battery Energy Storage System E/O Mulbarton Road, Keswick, Norwich | Greenfield Energy Developments Limited | 400 | In planning |
| Burgh Road, Aylsham - Micro Battery Storage The Intersection Of Aylsham Bypass And Burgh Road Aylsham | AMP Clean Energy | 0.2 | In planning |
| East Pye Solar Farm Btw Norwich Main and Bramford, Hempnall, Norwich | Island Green Power | – | In planning |
| The Droves Solar Farm - Battery Petticoat Drove, South Acre, Breckland | Island Green Power | – | In planning |
| Yarmouth Road, Blofield - Solar Park, Battery Storage, Cafes & Retail Adj Mcdonalds Yarmouth Road Blofield | Hemingford (Witchford) Limited | – | In planning |
Battery storage in North Yorkshire
45 projects, 3,344 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Osbaldwick Substation Os Field 5070, Hull Road, Dunnington, York | UK Battery Storage | 49.9 | Operating |
| Rusholme Grange Rusholme Grange, Rusholme Lane, Drax, Selby | Harmony Energy Storage | 40 | Operating |
| Darlington Road, Skeeby - Battery Energy Storage Se/O A6108 Darlington Road, Richmond | Atrato Onsite Energy & Harmony Energy | 35 | Operating |
| Wormald Green - Battery Energy Storage System Station Lane Burton Leonard | Harmony Energy Limited | 33 | Operating |
| Boscar Grange Farm Boscar Grange Farm, Thirsk Road, Easingwold, York, North Yorkshire | Gridserve | 27 | Operating |
| Cleveland Potash Boulby Mine, Loftus, Saltburn-by-the-Sea, Cleveland | Kiwi Power | 6 | Operating |
| Monk Fryston Battery Storage Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby | SSE Renewables | 320 | Under construction |
| Soay Solar Farm and Greener Grid Park Three Cocked Hat Plantation, Waplington Lane, Allerthorpe, York | Statkraft Uk Limited | 200 | Under construction |
| Monk Fryston Battery Storage Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby | Pelagic Energy & Constantine | 57 | Under construction |
| East York Energy Hub Adjacent To Gells Farm, Murton Way, York | York Energy Park Limited | 250 | Consented, not built |
| Springfield Farm, Hensall - Battery Energy Storage Facility Springfield Farm Weeland Road Hensall Selby Goole | Newton Energi Limited | 240 | Consented, not built |
| Drax Re-Power New Road, Drax, Selby, North Yorkshire | Drax Group | 200 | Consented, not built |
| Hales Lane - Battery Storage Facility Hales Lane, Drax, Selby | Aura Power | 100 | Consented, not built |
| Murton Way - Battery Energy Storage North W/O Murton Way, York | First Way Solar Limited | 100 | Consented, not built |
| Third Energy UK Gas Limited - Battery Energy Storage Third Energy Uk Gas Limited, Malton Road, West Knapton, Malton | Third Energy | 100 | Consented, not built |
| Lakeside Energy Storage Facility Off New Road | Tag Energy UK | 99.9 | Consented, not built |
| Monets Garden Battery, Osbaldwick - Energy Storage Facility The National Grid Substation, Osbaldwick Link Road, Osbaldwick, York | Monets Garden Battery Limited | 50 | Consented, not built |
| Meadowville, Hull Road - Battery Energy Storage System N/O Meadowville, Hull Road, Dunnington, York | UK Battery Storage Limited | 48 | Consented, not built |
| Hull Road, Lund - Battery Energy Storage System West of Hulll Road, Lund, Selby | Ylem Energy Limited | 40 | Consented, not built |
| Warren Lane, Bramham - Battery Energy Storage Warren Lane, Bramham, Tadcaster | Harmony Energy Limited | 35 | Consented, not built |
| Windmill Farm Solar Farm (Old Malton) Great Sike Road | Harmony Energy | 12.6 | Consented, not built |
| Camblesforth Solar Farm Land Off, Camela Lane, Camblesforth, Selby, North Yorkshire | Enray Power | 10 | Consented, not built |
| Jenny Field Drive The Hydro, Jenny Field Drive, Harrogate | Enstor Power | 5 | Consented, not built |
| Showfield Lane Land North Of Pyramid Systems, Showfield Lane, Malton | Enstor Energy | 5 | Consented, not built |
| Cramble Cross Poultry Unit, Back Lane - Battery Storage Cramble Cross Poultry Unit, Back Lane, North Cowton, Northallerton | G W Barker Limited | 0.2 | Consented, not built |
| Carlton Solar Farm S/O A645 Wade House Lane Drax Selby | Island Green Power | – | Consented, not built |
| Carr House Farm, East Heslerton - Battery Storage Carr House Farm, Carr Lane, East Heslerton, Malton | Renewable Connections Developments Limited | – | Consented, not built |
| Darnall Road - Battery Energy Storage Darnall Road, Sheffield | Mercia Power Response Limited | – | Consented, not built |
| Helios Renewable Energy Project Sw/O Camblesforth & N/O Hirst Courtney, Selby | Enso Green Holdings D Limited | – | Consented, not built |
| Hull Road - Battery Storage Facility Hull Road, Osgodby, Selby | Mercia Power Response Limited | – | Consented, not built |
| Os Field 6800 Fence Dike Lane - Battery Storage OS Field 6800 Fence Dike Lane Scruton | Lightrock Power Limited | – | Consented, not built |
| Os Field, Husthwaite - Battery Storage OS Field 2700 Carlton Husthwaite | Woolpots Solar Farm Limited | – | Consented, not built |
| Scalm Park, Wistow - Solar Farm & Battery Energy Storage Scalm Park Wistow | Grenergy | – | Consented, not built |
| Station Lane, South Stainley North Of Burton Top Farm Station Lane South Stainley | Boultbee Brooks Renewable Energy | – | Consented, not built |
| Wormald Green Solar Farm Land Comprising Field At 431305 464500 Station Lane Burton Leonard | Harmony Energy Limited | – | Consented, not built |
| Mowbray Battery Energy Storage Station Mowbray BESS, Haggitt Hill Lane, East Rounton, Northallerton | Mowbray Energy Park Limited | 1,000 | In planning |
| Low Moor Lane, Scotton - Battery Energy Storage System Low Moor Lane, Scotton | Harmony Energy Limited | 200 | In planning |
| New Oaks, Station Road - Battery Energy Storage System S/O The A645, Station Road, Camblesforth, Selby | Brockwell Energy Limited | 50 | In planning |
| Broad Lane, Cawood - Solar Farm & Battery Storage East Of Broad Lane Cawood | Quintas Cleantech | 10 | In planning |
| Market Weighton Road, Barlby - Solar Farm & Battery Storage Market Weighton Road Barlby | Quintas Cleantech | 10 | In planning |
| Sutton-on-the-Forest, Brownmoor Lane -BESS Sutton-on-the-Forest, Brownmoor Lane, York | Ampyr Energy UK Development Limited | 10 | In planning |
| Bellmoor BESS Facility - Battery Energy Storage System North Of Reservoir At Grizzlefield House Felixkirk Road | Private Developer | – | In planning |
| Fence Dike Lane - Battery Energy Storage System Os Field 6537 Fence Dike Lane, Scruton, Northallerton | Balance Power Projects Limited | – | In planning |
| Green Lane, Moor Monkton - Solar Panels & Battery Energy Storage System At 450299 453859 Green Lane, Moor Monkton, York | Eden Renewables | – | In planning |
| Lawrence House Farm - Solar Farm Lawrence House Farm, Scotton, Knaresborough | GRIDSERVE Sustainable Energy Ltd. | – | In planning |
Battery storage in Northamptonshire
33 projects, 771 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Grendon Lakes, Grendon - Battery Storage Facility Grendon Lakes, Main Road, Grendon, Northampton | Statera Energy | 50 | Operating |
| Chelveston Renewable Energy Park Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough | Federal Estates | 20 | Under construction |
| Silver Spinney Farm Silver Spinney Farm, Deanshanger Road, Wicken, Milton Keynes | Thrive Renewables | 5 | Under construction |
| Green Hill Solar Farm & Battery Storage Wilby Road, Mears Ashby | Island Green Power | 500 | Consented, not built |
| Grendon Road, Earls Barton - Battery Energy Storage System 301 Grendon Road, Earls Barton, Northampton | Greenfield Energy Developments Limited | 99.9 | Consented, not built |
| Welford Solar Farm - Solar Farm & Battery Storage North of South Kilworth Road | Welford Solar Farm Limited | 67 | Consented, not built |
| Electricity Sub Station, Lanchester Way - Micro Energy Storage Electricity Sub-station 2 Lanchester Way Royal Oak Industrial Estate | AMP Clean Energy | 0.2 | Consented, not built |
| Great Central Way, Byfield Road - Battery Storage South Of 15 Great Central Way, Byfield Road, Woodford Halse | AMP Clean Energy | 0.2 | Consented, not built |
| Moulton Park Industrial Estate - Micro Energy Storage S/O Clayfield Close, Moulton Park Industrial Estate, Northampton | AMP Clean Energy | 0.2 | Consented, not built |
| New Euroline Depot, Sopwith Way - Energy Storage System S/O New Euroline Depot, Sopwith Way, Daventry | AMP Clean Energy | 0.2 | Consented, not built |
| Newnham Drive, Heartlands Business Park - Micro Energy Storage Project South Of Newnham Drive, Newnham Drive | AMP Clean Energy | 0.2 | Consented, not built |
| Octagon Way, Weston Favell Retail Park - Energy Storage System Sw/O Octagon Way, Weston Favell Retail Park | AMP Clean Energy | 0.2 | Consented, not built |
| Old Tiffield Road - Micro Energy Storage Project Tove Depot Car Park, N/O Old Tiffield Road, Towcester | AMP Clean Energy | 0.2 | Consented, not built |
| Site K2, Sywell Road - Battery Storage Site K2, Sywell Road, Park Farm Industrial Estate, Wellingborough | AMP Clean Energy | 0.2 | Consented, not built |
| Tower Hill Road - Battery Energy Storage N/O Tower Hill Road, Corby | AMP Clean Energy | 0.2 | Consented, not built |
| Trinity Centre, Sinclair Drive - Energy Storage System West Of Junction With Trinity Centre Sinclair Drive | AMP Clean Energy | 0.2 | Consented, not built |
| Upper Heyford Roundabout, Daventry Link Road - Energy Storage System Upper Heyford Roundabout, Daventry Link Road, Upper Heyford | AMP Clean Energy | 0.2 | Consented, not built |
| Welton Road - Energy Storage System Footpath Welton Road | AMP Clean Energy | 0.2 | Consented, not built |
| Wootton Hall Park, Mereway - Micro Energy Storage Wootton Hall Park, Mereway, Northampton | AMP Clean Energy | 0.2 | Consented, not built |
| Halse Road - Solar Farm & Battery Storage Halse Road, south of Greatworth | JBM Solar Projects Limited | – | Consented, not built |
| Old Head Wood, Brigstock - Battery Storage North Of Old Head Wood Grafton Road Brigstock | Scottish Power Renewables | – | Consented, not built |
| Unit 2, Enterprise Court - Battery Energy Storage Unit Unitforce Uk Limited, Unit 2, Enterprise Court, Geddington Road, Corby | Mercia Power Response Limited | – | Consented, not built |
| Newnham Grange Farm - Battery Energy Storage N/O Newnham Grange Farm, Daventry | Neo Environmental (Belfast) | 15 | In planning |
| Oakley Bush Solar Farm - Battery Storage Newton Road, N/O Newton, Kettering | Buccleuch Estates Limited | 10 | In planning |
| Chelveston Road, Higham Ferrers - Energy Storage System Chelveston Road Higham Ferrers | AMP Clean Energy | 0.2 | In planning |
| Cottingham Road - Micro Energy Storage Project Cottingham Road | AMP Clean Energy | 0.2 | In planning |
| Farm Road -Battery Energy Storage The North West And South West Of Farm Road | AMP Clean Energy | 0.2 | In planning |
| Gainsborough Road, Oakley Road - Micro Energy Storage Gainsborough Road, Oakley Road, Corby | AMP Clean Energy | 0.2 | In planning |
| Glendon Wood Hospital, Prologis Park - Micro Energy Storage System The North West Of Glendon Wood Hospital Prologis Park | AMP Clean Energy | 0.2 | In planning |
| Northampton Road - Micro Energy Storage Verge Sw/O Northampton Road, Northampton Road, Rushden | AMP Clean Energy | 0.2 | In planning |
| Uppingham Road - Micro Energy Storage System Uppingham Road, Corby | AMP Clean Energy | 0.2 | In planning |
| Brixworth Landfill, Scaldwell Road - Solar Array & Battery Storage Brixworth Landfill Site Scaldwell Road Brixworth | SUEZ Recycling and Recovery UK Limited | – | In planning |
| Kettering Energy Park Burton Wold Wind Farm (land adj), Wold Road, Burton Latimer | irst Renewable Developments Limited | – | In planning |
Battery storage in Northumberland
15 projects, 283 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Ray Battery Storage Facility Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne | Vattenfall Wind Power | 20 | Operating |
| County Hall, Loansdean - Battery Storage Staff Car Park County Hall, Loansdean, Morpeth | Northumberland County Council | 0.4 | Operating |
| High Brockland Farm, Brock Lane - Battery Energy Storage System S/O High Brockland Farm, Brock Lane, West Sleekburn, Bedlington | Bluefield Renewable Developments Limited | 70 | Consented, not built |
| Low Horton - Battery Energy Storage System S/O A1061 & W/O A192, Cramlington | Bluefield Renewable Developments Limited | 50 | Consented, not built |
| West Sleekburn - Battery Storage Compound West Sleekburn, Bedlington | Enviromena Asset Management UK Limited | 30 | Consented, not built |
| Halfway House, Lincoln Hill - Energy Storage E/O Halfway House, Lincoln Hill, Humshaugh | Humshaugh Net Zero | 2.5 | Consented, not built |
| Bassington Industrial Estate - Battery Energy Storage System Bassington Industrial Estate, Cramlington | AMP Clean Energy | 0.2 | Consented, not built |
| Broadway House Farm Solar Farm Church Lane | Bluefield Renewable Developments Limited | – | Consented, not built |
| Quotient Sciences, Taylor Drive - Battery Storage SW/O Quotient Sciences, S/O Taylor Drive, Alnwick | The Duke of Northumberland Estate | – | Consented, not built |
| West Chevington Farm, West Chevington - Battery Storage E/O West Chevington Farm, West Chevington, Morpeth | Genesis One Limited | – | Consented, not built |
| Fourstones -Battery Energy Storage Fourstones, Hexham | Mespil Solar Energy | 60 | In planning |
| Burnt House Farm, Nedderton Village - Battery Energy Storage System Adj Burnt House Farm, Nedderton Village, Bedlington | Bluefield Renewable Developments Limited | 50 | In planning |
| Fourstones Substation, Fourstones - Solar Farm & Battery Energy Storage North Of Fourstones Substation Fourstones | ER New Projects 2 Limited | – | In planning |
| Seghill Household Waste Recovery Centre - BESS Seghill Household Waste Recovery Centre, Seaton Delaval, Cramlington | Suez Recycling and Recovery UK Limited | – | In planning |
| Seghill Household Waste Recovery Centre - BESS Seghill Household Waste Recovery Centre, Seaton Delaval, Cramlington | Suez Recycling and Recovery UK Limited | – | In planning |
Battery storage in Nottinghamshire
43 projects, 5,024 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| West Burton West Burton Power Station North Road West Burton Retford Nottinghamshire | EDF Energy Renewables | 49 | Operating |
| Eastcroft Municipal Depot Municipal Depot, Eastcroft , Nottingham | Nottingham City Council | 0.6 | Operating |
| Trent Basin Community Battery Depot East Of Trent Basin Trent Lane Nottingham | EvoEnergy | 0.5 | Operating |
| Staythorpe Road - Battery energy storage S/O Staythorpe Road Staythorpe | Ecap Renewables (Elements Green) | 360 | Under construction |
| Gainsborough Road, Saundby - Battery Storage Facility E/O Bumble Bee Farm, Saundby Road, Gainsborough Road, Saundby | Enso Energy & Cero Generation | 120 | Under construction |
| West Leake Lane, Ratcliffe - Battery Storage West Leake Lane West Leake Lane Ratcliffe On Soar | Sandbrook Capital BES Limited | 1,200 | Consented, not built |
| Torksey Ferry Road, Rampton - Battery Energy Storage S/O Torksey Ferry Road, Rampton, Retford | Tribus Clean Energy Limited | 500 | Consented, not built |
| West Burton Power Station, North Road - Battery Storage West Burton Power Station North Road West Burton | Fidra Energy & Drax | 500 | Consented, not built |
| Polly Taylors Road, High Marnham - Battery Energy Storage System N/O Polly Taylors Road, High Marnham, Newark | Field Energy | 400 | Consented, not built |
| Burton Wood Farm, Spring Lane - Battery Energy Storage Burton Wood Farm, Spring Lane, Lambley, Nottingham | Grenergy Renewables | 320 | Consented, not built |
| Steeple Renewables Project West Burton Power Station, Sturton-le-Steeple, Retford | Renewable Energy Systems RES Limited (Beaufort) | 150 | Consented, not built |
| Southfields Farm, Common Lane - Battery Storage Southfields Farm Common Lane Bramcote | Toton Battery Storage Limited | 130 | Consented, not built |
| West Leake Lane, Ratcliffe - Battery Storage West Leake Lane West Leake Lane Ratcliffe On Soar | Renewable Energy Systems RES ltd (Beaufort) | 99.9 | Consented, not built |
| Old Wood Energy Park - Battery Energy Storage W/O Bradmore Road & N/O Wysall Road, W/O Wysall, Nottingham | Exagen | 85 | Consented, not built |
| Main Street, Kelham - Solar Farm & Battery Energy Storage The W/O Main Street, Kelham, Newark | Assured Asset Solar 2 Limited (Peridot Solar) | 50 | Consented, not built |
| Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage Fields Farm Asher Lane Ruddington | Ridge Clean Energy Limited & L&G NTR Clean Power | 49.9 | Consented, not built |
| Cottam Power Station Cottam Power Station, Cottam, Retford, Nottinghamshire | EDF Energy | 49 | Consented, not built |
| Heron Solar Farm & Battery Storage North Of Staragglethorpe Road Stragglethorpe, Colnbrook | JBM Solar Projects 38 Limited | 20 | Consented, not built |
| Highfields Farm - Solar Farm & Battery Storage Ne/O Highfields Farm, Bunny Hill, Costock | Boultbee Brooks Renewable Energy Ltd | 8 | Consented, not built |
| Orston Shooting Ground, Bottesford Lane - BESS Orston Shooting Ground Limited, Bottesford Lane, Orston, Nottingham | NSAF Limited | 0.4 | Consented, not built |
| Newark Road, Wellow - Micro Energy Storage The West Side Newark Road Wellow | AMP Clean Energy | 0.2 | Consented, not built |
| Plymouth Avenue, Pinxton - Battery Energy Storage Facility 10 - 12 Plymouth Avenue Pinxton | AMP Energy Services Limited | 0.2 | Consented, not built |
| Sleaford Road, Newark On Trent - Battery Energy Storage Sleaford Road Newark On Trent | AMP Clean Energy | 0.2 | Consented, not built |
| Tamworth Road, Long Eaton - Micro Energy Storage The East Side Of Tamworth Road, Long Eaton, Nottingham | AMP Clean Energy | 0.2 | Consented, not built |
| Wharf Road & Beaufit Lane, Pinxton - Micro Energy Storage Wharf Road & Beaufit Lane, Pinxton, Nottingham | AMP Clean Energy | 0.2 | Consented, not built |
| Adj To The A614 - Solar Normanton Larches, Blyth Road, Worksop, Nottinghamshire | One Planet Developments Limited | – | Consented, not built |
| Albion Close - Battery Energy Storage Unit 4 Albion Close | Mercia Power Response Limited | – | Consented, not built |
| Cotmoor Solar Farm Land to the North of Hallought, Cotmoor Lane, Southwell | JBM Solar Projects | – | Consented, not built |
| Crabtree Lane, Skegby - Battery Energy Storage E/O Crabtree Lane & N/O Polly Taylors Road, Skegby, Newark | Enso Energy | – | Consented, not built |
| Kestral Road - Battery Energy Storage Facility Kestral Road | Mercia Power Response Limited | – | Consented, not built |
| Mansfield Road, Little Morton Farm - Battery Storage Mansfield Road (Next To Solar Farm) Little Morton Farm Little Morton | Mercia Power Response | – | Consented, not built |
| One Earth Solar Farm High Marnham, The border of Nottinghamshire, Newark | Orsted UK Limited & PS Renewables | – | Consented, not built |
| The Scrapyard, Bowbridge Lane - Battery Energy Storage System The Scrapyard, Bowbridge Lane, Balderton, Newark | Conrad Energy (Developments) Limited | – | Consented, not built |
| Tuxford Road Solar Farm Land North And South Tuxford Road Skegby | Enso Energy Limited | – | Consented, not built |
| Winkburn Lane, Winkburn - Battery Storage Winkburn Lane Winkburn | Lightsource SPV 196 | – | Consented, not built |
| Elkesley Southbound, Elkesley - Battery Energy Storage System Ne/O A1 Elkesley Southbound, Elkesley, Retford | Mespil Solar Energy | 480 | In planning |
| Staythorpe Road, Averham - Battery Storage Staythorpe Road Averham | SSE Battery Storage Limited | 300 | In planning |
| Gotham - Battery Energy storage Barton-in-Fabis Nottingham Road Gotham | Net Zero Energy Development Limited | 100 | In planning |
| Cottom Power Station Cottam Power Station | EDF Energy Thermal Generation Limited | 50 | In planning |
| Grove Way - Battery Energy Storage E/O Grove Way, Mansfield Woodhouse, Mansfield | AMP Clean Energy | 0.2 | In planning |
| Kelham Road And Great North Road - Micro Battery Storage Project Junction Kelham Road | AMP Clean Energy | 0.2 | In planning |
| Great North Road Solar Park north west of Newark on Trent, west of A1 and north of A617, Newark | Elements Green | – | In planning |
| Moto Hospitality, Trowell Services Area North - Solar Farm & Battery The Ne/O Moto Hospitality Limited, Trowell Services Area North M1 Trowell Services Northbound Off Slip, Trowell, Nottingham | Moto Hospitality Limited | – | In planning |
Battery storage in Orkney Islands
1 project, 2 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Orkney Storage Park Project Kirkwall, Orkney | Scottish Hydroelectric Power Distribution (SHEPD) | 2 | Operating |
Battery storage in Oxfordshire
29 projects, 1,555 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Cowley electricity sub-station Cowley Main Sub Station, Lower Blackberry Lane, Garsington, Oxford | Pivot Power | 49.9 | Operating |
| Aurora Solar Farm Twelve Acre Farm, Chilbridge Road, Eynsham, Witney | Low Carbon UK Solar Investment Company | 18 | Under construction |
| Ray Valley Solar Farm Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester | Low Carbon | – | Under construction |
| Culham Science Centre, Clifton Hampden - Battery Storage Facility N/O Culham Science Centre, Near Clifton Hampden, Abingdon | Statera Energy | 500 | Consented, not built |
| Appleford - Battery Energy Storage S/O B4016 Appleford | TBC 001 Limited | 300 | Consented, not built |
| Cowley Substation, Blackberry Lane - Battery Storage Energy System Adj Cowley Substation, Oxford | Penso Power (BW ESS) | 200 | Consented, not built |
| Woodstock Road, Yarnton - Battery Energy Storage System Oxford South Depot 1 Woodstock Road Yarnton | Schroders Greencoat | 52 | Consented, not built |
| Burcot Solar Farm Burcot Farm Burcot | Ethical Power | 49.9 | Consented, not built |
| Bicester Road, Launton - Battery Energy Storage W/O Bicester Road, Launton, Bicester | Powersun Limited | 40 | Consented, not built |
| Tar Solar Farm Tar Farm, Tar Road, Stanton, Witney | Bluefield Renewable Developments Limited | 40 | Consented, not built |
| Quarry Solar Farm & Battery Storage Facility University Farm, Hailey Witney | JBM Solar Projects 34 Limited | 35 | Consented, not built |
| Blenheim Net Zero Estate Land Between Woodstock Sewage, Banbury Road, B4027, Road Through Blenheim Park, Woodstock, Oxfordshire | Vanburgh Unit Trust | 1 | Consented, not built |
| Eynsham Fire Station, Old Station Way - Micro Energy Storage Eynsham Fire Station, Old Station Way, Eynsham, Witney | AMP Energy Services Limited | 0.2 | Consented, not built |
| Mcgregor Cory Limited, Middleton Road - Micro Energy Storage Facility Verge N/O Mcgregor Cory Limited, Adj Middleton Road, Banbury | AMP Clean Energy | 0.2 | Consented, not built |
| Barnstaples Farm Land at Barnstaples Farm, East Hanney, Wantage, Oxfordshire | Nextpower SPV 14 Limited | – | Consented, not built |
| Icknield Road, Ipsden - Solar Array & Battery Storage Icknield Gas to Grid Anaerobic Digestion Plant Icknield Road Ipsden | Icknield Gas Limited | – | Consented, not built |
| Nuneham Courtenay Solar Farm & Battery Storage Facility Land South West of Cowley Subs, Nuneham Courtenay, Oxford | Enso Energy (Cowley Baldon Green Limited) | – | Consented, not built |
| Pool Farm, Mill Lane, Stratton - Solar Farm Pool Farm Mill Lane Stratton Audley | JBM Solar Projects Limited | – | Consented, not built |
| Radley College, Kennington Gate - Solar Array & Battery Storage Radley College, N/O Kennington Gate, Abingdon | Radley College | – | Consented, not built |
| Shilton Road - Solar Park & Battery Storage Former Home Close Farm Shilton Road | Ecotricity Generation Limited | – | Consented, not built |
| The Sutton Courtenay Waste Management Site, Appleford Sidings The Sutton Courtenay Waste Management Site, Appleford Sidings Sutton Courtenay, Abingdon | Development at Sutton Courtenay Waste Management | – | Consented, not built |
| Westmill Farm - Battery Storage Westmill Farm, Highworth Road, Watchfield, Swindon, Oxon | Private Developer | – | Consented, not built |
| Witney Bypass, Stanton Harcourt Road - Battery Storage South Of The A40, Witney Bypass Stanton Harcourt Road | Voltwise Power Holdings Limited | 150 | In planning |
| Aston Road, Aston - Solar Panels & Battery Energy Storage System West of Aston Road, Aston | Ampyr Solar Europe | 40 | In planning |
| Caswell Lane, Brize Norton - Solar Farm & Battery Storage Caswell Lane Brize Norton | Ampyr Solar Europe | 30 | In planning |
| Snowswick Lane, Coleshill - Solar Farm Snowswick Lane near Coleshill | Abei Energy Limited | 25 | In planning |
| Willowfields Energy Park, Marcham - Battery Energy Storage Willowfields Energy Park, Se/O Kingston Bagpuize & W/O Marcham, Abingdon | Exagen Development Limited | 20 | In planning |
| Station Road, Ardley - Solar Farm & Battery Energy Storage System Station Road, Ardley, Bicester | Valencia Waster Management Limited | 4 | In planning |
| Appleford Sidings, Sutton Courtenay - Battery Storage Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon | Infinis Solar Developments Limited | – | In planning |
Battery storage in Pembrokeshire
7 projects, 752 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Goldborough Road, Hundleton - Battery Energy Storage Goldborough Road, Hundleton | Pembroke Green Limited (Enso Energy and Cero Generation) | 350 | Consented, not built |
| Pembroke Power Station, Pwllcrochan - Battery Storage Pembroke Power Station, Pwllcrochan | RWE Generation UK Plc | 350 | Consented, not built |
| The Greenlink Converter Station - Lambeeth Battery Energy Storage Agricultural Field, E/O The Greenlink Converter Station, E/O The Greenlink Converter Station Off Goldborough Road | Sirius EcoDev Limited | 49.9 | Consented, not built |
| Glyngwernen Farm, Uchaf Fawr - Battery Storage N/O Glyngwernen Farm, Uchaf Fawr, Felinfoel, Llanelli, Dyfed | Bartypower Limited | 2 | Consented, not built |
| Castle Terrace, Pill Road - Battery Energy Storage Castle Terrace, Pill Road, Milford Haven, Dyfed | AMP Clean Energy | 0.2 | Consented, not built |
| Honeyborough Industrial Estate - Micro Energy Storage Facility Unit 3, Honeyborough Industrial Estate, Neyland, Milford Haven | Aggregated Micro Power Plc | 0.2 | Consented, not built |
| Steynton Road And Sheffield Drive - Micro Energy Battery Storage Btw Steynton Road And Sheffield Drive, Milford Haven, Dyfed | AMP Clean Energy | 0.2 | Consented, not built |
Battery storage in Perth and Kinross
13 projects, 1,368 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Jamesfield Organic Centre - Battery Storage 140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar | Harmony Energy Storage | 49 | Operating |
| Perth Wastewater Treatment Works (Extension) Land 150 Metres South West Of, Rhynd, Perth, Tayside | Scottish Water | – | Operating |
| Haughend Farm - Alyth Battery Energy Storage System Haughend Farm, Meigle, Blairgowrie | EcoDev Group Limited | 900 | Consented, not built |
| Hallyburton - Battery Storage Hallyburton, Kettins, Blairgowrie | Balance Power Projects Limited | 100 | Consented, not built |
| Shindour, Feddal Hill Wood - Battery Energy Storage Facility Shindour, Feddal Hill, Wood Braco, Dunblane | Whirlwind Energy Storage Limited | 50 | Consented, not built |
| Newburgh Road, Abernethy - Battery Energy Storage Facility 200 Metres N/O Pitcurran House, Newburgh Road, Abernethy | Opdenergy | 49.9 | Consented, not built |
| Newhouse Farm - Energy Storage Facility 170 Metres S/O Newhouse Farm, Perth | Intelligent Land Investments Group | 49.9 | Consented, not built |
| Old Gallows Road - Battery storage Old Gallows Road | Foresight Group | 49.9 | Consented, not built |
| Tir Artair - Battery Energy Storage Facility W/O Tir Artair, Killin, Perthshire | Opdenergy | 49.9 | Consented, not built |
| Binn Eco Park - Battery Binn Eco Park Wind Farm Glenfarg | Green Cat Renewables Developments | 10 | Consented, not built |
| Acharn Forest - Battery Storage Acharn Forest, Killin, Tayside, lomond | Biomass Energy Renewables Llp | 9.9 | Consented, not built |
| Glentarken Wind Farm Drummond Estate, Drummond, Perth | SSE Renewables Wind Farms UK Ltd | 50 | In planning |
| Meall Dearg Wind Farm - Wind Farm Meall Dearg Wind Farm, 6km S/O Aberfeldy, Perth | Energiekontor (UK) Limited | – | In planning |
Battery storage in Powys
3 projects, 50.4 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Garn Fach Wind Farm Land approximately 2km west of Llaithddu, 5km north-west of the village of Llanbadarn Fynydd and 8km to the south of Newtown, Powys, Wales | EDF Renewables | 50 | Consented, not built |
| Dyffryn Industrial Estate, Pool Road - Energy Storage Facility Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown | AMP Energy Services Limited | 0.2 | Consented, not built |
| Unit B, Mochdre Industrial Estate - Micro Energy Storage Facility Unit B, Mochdre Industrial Estate, Newtown | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
Battery storage in Renfrewshire
8 projects, 1,095 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Whitelee Wind Farm Battery Storage Extension Eaglesham Moor, Whitelee Forest, Fenwick Moor, East Kilbride, South of Glasgow | Scottish Power Renewables (formerly Arcus Consultancy Services) | 50 | Operating |
| Land off Shilton Lane Land Bet Shilton Cottage & M89, Shilton Lane, Bishopton, Strathclyde | Gresham House | 40 | Operating |
| Land SW of Shilton Cottage Site 300 metres South West of, Old Greenock Road, Bishopton, Strathclyde | Muirhall Energy | 29.9 | Operating |
| Middleton Road, Linwood - Battery Storage Former Water Treatment Works, Middleton Road, Linwood, Paisley, Strathclyde | Scottish Water Horizons | – | Operating |
| Neilston Greener Grid Park Site 400 metres North West of Sergeantlaw, Gleniffer Road, Paisley | Statkraft UK LTD | 50 | Under construction |
| Neilston Greener Grid Park - Phase 2 Site 400 metres North West of Sergeantlaw, Gleniffer Road, Paisley | Statkraft UK LTD | 750 | Consented, not built |
| Neilston - Battery Storage 400 Metres North East Of Glenview Caplaw Road Neilston | Apatura (GPC 1119 Ltd) | 150 | Consented, not built |
| Houston Solar PV Farm & Energy Storage Facility Houston Village Hall, 19 Main Street, Houston, Johnstone | The Old Rectory | 25 | Consented, not built |
Battery storage in Rhondda Cynon Taff
3 projects, 42 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Hirwaun Stor Generation - Battery Storage HIRWAUN STOR GENERATION, MAIN AVENUE, HIRWAUN | Pulse Clean Energy | 21.8 | Operating |
| Energy Centre Royal Mint Royal Mint, Llantrisant, Pontyclun, Mid Glamorgan | Infinite Energy Renewables | 20 | Operating |
| Abercwmboi Rugby Club, Aberaman - Micro Energy Storage Facility Abercwmboi Rugby Club, Cardiff Road, Aberaman, Aberdare, Mid Glamorgan | AMP Energy Services Limited | 0.2 | Consented, not built |
Battery storage in Scottish Borders
5 projects, 567 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Eccles II Substation - Battery Energy Storage System W/O Eccles Substation, approximately 2.3 km S/O Leitholm | Matrix Renewables | 500 | Under construction |
| Bankhead Farm - Energy Storage System Bankhead Farm, Fishcross, Alloa | Low Carbon Storage | 25 | Consented, not built |
| Dunside Wind Farm W/O Dunside Longformacus Duns | EDF Energy | 20 | Consented, not built |
| Scawd Law Wind Farm Land to the north east of Innerleithen approximately 3 km to the east of the B709 and 4 km north of the A72 | Fred Olsen Renewables | 12 | In planning |
| Leithenwater Wind Energy Hub - Wind Farm Leithenwater Wind Energy Hub, 4.5km NE/O Peebles, Peebles | Belltown Power Limited | 10 | In planning |
Battery storage in Shetland
3 projects, 26 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Northern Isles New Energy Solution (NINES) 1 Lerwick, Shetlands | Scottish Hydroelectric Power Distribution (SHEPD) | 1 | Operating |
| Foula Community Electricity Scheme Foula, Shetland, Shetland Islands | Foula Community Electricity Trust | – | Operating |
| Neshion Energy Park - BESS Neshion Energy Park, E/O Sullom Voe Oil Terminal and the Shetland Gas Plant, Shetland | Neshion Energy Park | 25 | In planning |
Battery storage in Shropshire
25 projects, 708 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Albrighton Solar farm Land To The North of Harriotts Hayes Lane, Codsall Wood, Wolverhampton | Big60Million/Belectric | – | Operating |
| Bubney Farm Bubney Farm, Grindley Brook, Whitchurch | AlphaReal | – | Operating |
| Rock Farm - Solar Farm SE Of Rock Farm Rocks Green Ludlow | Enviromena | 12 | Under construction |
| Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage Cheswell Grange Farm, Cheswell Drive, Cheswell, Newport | Ethical Power | – | Under construction |
| Rednal Airfield, West Felton - Battery Energy Storage Rednal Airfield Rednal West | Private Developer | 300 | Consented, not built |
| Buildwas - Battery Energy Storage N/O A4169 Buildwas, Telford | Greenfield Energy Developments Limited | 100 | Consented, not built |
| Hollydale, Buildwas Road - Battery Storage adjacent Hollydale, Buildwas Road, Ironbridge | Telford Four Limited | 40 | Consented, not built |
| Steventon Road - Battery Energy Storage Steventon Manor, Steventon Road, Ludlow | Greenfield Company | 23 | Consented, not built |
| Hollins Lane - Battery Energy Storage S/O Hollins Lane, Market Drayton | Hydrock Consultants Limited | 13 | Consented, not built |
| Bath Mews, Minsterley - Battery Storage Facility North Of Bath Mews Minsterley | Fig Power | 10 | Consented, not built |
| Bridge Farm, Uffington - Battery Energy Storage The S/O Uffington Shrewsbury | Hydrock | 8 | Consented, not built |
| Cold Move, Maes-Y-Clawdd Cold Move Maes-y-clawdd | Cold Move Limited | 1 | Consented, not built |
| Brassey Road - Micro Energy Storage Facility Farr & Harris, Brassey Road, Shrewsbury | AMP Energy Services Limited | 0.2 | Consented, not built |
| Ercall House, Stafford Park - Micro Energy Storage Facility Adjacent Ercall House, Stafford Park 1, Stafford Park | AMP Clean Energy | 0.2 | Consented, not built |
| Farr & Harris - Energy Storage Facility Farr & Harris Limited, Maes-Y-Clawdd, Oswestry | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Hortonwood - Energy Storage Facility Highway Verge Fronting Veolia I W M F, Hortonwood, 60 Hortonwood, Telford | AMP Clean Energy | 0.2 | Consented, not built |
| Radford House - Energy Storage Facility Opp Radford House, Stafford Park 7, Telford | AMP Clean Energy | 0.2 | Consented, not built |
| Stafford Park - Battery Energy Storage Stafford Park 13, Telford | AMP Clean Energy | 0.2 | Consented, not built |
| Buildwas Bank - Battery Energy Storage Buildwas Bank, N/O Silvertrees, Jiggers Bank, Coalbrookdale, Telford | Lower Coalmoor BESS Limited | – | Consented, not built |
| Cefn-Y-Maes Farm, Rhydycroesau - Solar Park North Greenfields Lane Cefn-y-Maes Farm Ffordd Cefn-y-Maes Rhydycroesau | Positech Energy Limited | – | Consented, not built |
| Myttons Solar Farm Land N/O Roden Lane Farm | JBM Solar Projects Limited | – | Consented, not built |
| Tiddiecross Lane, Charlton - Tiddiecross Solar Farm & Battery Storage N/O Tiddiecross Lane, Telford | Boultbee Brooks Renewables Walkford Moor Limited | – | Consented, not built |
| Battery Shrewsbury Substation, Uffington - Battery Energy Storage SW/O Shrewsbury Substation, Uffington, Shrewsbury | Lower 48 Energy BESS Limited | 100 | In planning |
| Pelham Road, Upton Magna - Battery Energy Storage System North Of Berwick Wharf | Elgin Energy Esco Limited | 100 | In planning |
| Bayston Hill Quarry, Sharpstones Lane - BESS Bayston Hill Quarry, Sharpstones Lane, Bayston Hill, Shrewsbury | Tarmac Trading Limited | – | In planning |
Battery storage in Somerset
32 projects, 405 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Fideoak Mills Fideoak Mills, Upcott Road, Bishops Hull, Taunton, Somerset | Kiwi Power (formerly Taunton Battery Storage) | 30 | Operating |
| JB Wheaton JB Wheaton, Chard Junction, Chard, Somerset | E.ON UK | 8.8 | Operating |
| Higher Hill Farm Energy Storage Land At Higher Hill Farm, Butleigh Hill, Butleigh, Glastonbury, Somerset | British Solar Renewables & Western Power Distribution & RES | 0.3 | Operating |
| Fordham Grange - Battery energy storage R/O Nursery Gardens & Fordham Grange, Nursery Gardens, Chard | Numatic International Limited | – | Operating |
| Midsomer Norton - Battery Energy Storage System S/O Unit 18, Midsomer Enterprise Park, Midsomer Norton, Radstock | Conrad Energy (Developments) II Limited | 6 | Under construction |
| Station Road & Nye Road, Sandford - Battery Energy Storage System North Of Station Road And West Of Nye Road Sandford | Aura Power Developments Limited | 100 | Consented, not built |
| Summerway Drove, East Bower - Battery Storage Summerway Drove, Bridgwater | Renewable Connections Developments Limited | 90 | Consented, not built |
| Bluebell Wood Solar Farm & Battery Storage S/O Flexham Farm, Bradford Road, Rode, Frome | Low Carbon UK Solar Investment Co Limited | 50 | Consented, not built |
| Hele Manor Farm, Bradford On Tone - Battery Storage System Hele Manor Farm, Hele Road, Bradford on Tone | STOR 107 Limited | 20 | Consented, not built |
| The Transmitting Station, Williton - Battery Storage (Wyndham Estate) N/O the Transmitting Station, Washford, Williton | Elgin Energy ES Co Limited | 20 | Consented, not built |
| Smithyard Lane - Battery Storage adjacent to Gas Substation, Smithyard Lane, Williton | Conrad Energy Limited | 15 | Consented, not built |
| Ash Farm, Charlton Road - Battery Storage System Ash Farm, Charlton Road, Holcombe, Radstock | Ash Farm Solar Limited | 10 | Consented, not built |
| Bransby Way, Heron Moor School - Micro Energy Storage Facility S/O Bransby Way, W/O Heron Moor School, Weston Super Mare | AMP Clean Energy | 0.2 | Consented, not built |
| Ilchester Road - Micro Energy Storage Facility Ilchester Road, Yeovil | AMP Energy Services Limited | 0.2 | Consented, not built |
| Wellington RFC, Corams Lane - Micro Energy Storage Facility Wellington Rfc, Corams Lane, Wellington | AMP Clean Energy | 0.2 | Consented, not built |
| Westbury Crescent, Loxton Road - Micro Energy Storage Facility Westbury Crescent, Loxton Road & Porlock Close, Weston Super Mare | AMP Clean Energy | 0.2 | Consented, not built |
| Weston Youth Centre, Coleridge Road - Energy Storage South Side Of Coleridge Road, R/O Weston Youth Centre, Weston Super Mare | AMP Clean Energy | 0.2 | Consented, not built |
| Brains Solar Farm Solar Site South Of Brains Farm Moor Lane Wincanton | NextPower SPV 13 Limited | – | Consented, not built |
| Brinsea Green Farm, Brinsea Lane - Battery Storage Land At Brinsea Green Farm Brinsea Lane Congresbury | RWE Renewables UK | – | Consented, not built |
| Bunford Park, Plot 1B - Battery Energy Storage Facility Plot 1b, Bunford Park, Yeovil | Abbey Manor Group Limited | – | Consented, not built |
| Camp Road, West Coker - Battery Energy Storage Camp Road, West Coker, Yeovil | Conrad Energy | – | Consented, not built |
| Ham Farm, Creech St Michael - Battery Energy Storage System Ham Farm, Ham, Creech St Michael. | Novus Renewable Services Limited | – | Consented, not built |
| Impens Farm - Solar Farm & Battery Storage Impens Farm, Petherton Road, North Newton, Bridgwater | Enso Energy Limited | – | Consented, not built |
| Lower Stock Farm, Langford - Battery Energy Storage System Land At Lower Stock Farm Bakers Lane Langford Churchill | Statkraft UK Limited | – | Consented, not built |
| Parcel 2882, Water Lane - Battery Storage S/O Water Lane, Bristol | Pathfinder Clean Energy UK Dev Limited | – | Consented, not built |
| Shearston, North Petherton - Battery Storage Kings Farm, Shearston, North Petherton | Conrad Energy (Developments) II Limited | – | Consented, not built |
| The Strawberry Line, Brinsea Road - BESS West & E/O The Strawberry Line, Brinsea Road, Congresbury, Bristol | RWE Renewables UK | – | Consented, not built |
| Whitley Solar Park, Ashcott - Battery Energy Storage Whitley Solar Park Ashcott | NextEnergy Capital LLP | – | Consented, not built |
| Frome Power, Styles Close - Energy Storage Facility N/O Styles Close & E/O The Existing Frome, 132/33kv Bulk Supply Point Substation, Frome | Trina Solar UK Hold Co Limited | 30 | In planning |
| Manor Farm, Wick Lane - Solar Farm & Battery Storage Manor Farm Wick Lane Hewish Puxton | Qair UK | 24 | In planning |
| Saltlands Avenue -Battery Storage Saltlands Avenue, Bridgwater | Somerset County Council | – | In planning |
| Taunton Substation - Battery Storage adjacent to Taunton Substation, Fideoak, Bishops Hull | Conrad Energy (Development II) Limited | – | In planning |
Battery storage in South Glamorgan
20 projects, 1,586 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Flat Holm Microgrid Project Flat Holm Island | Wind & Sun | – | Operating |
| Panasonic Manufacturing, Pentwyn - BESS Matsushita Electrical, Wharfedale Road, Pentwyn, Cardiff | Panasonic Manufacturing UK | 1.1 | Under construction |
| Rover Way, Splott - Energy Park & Data Centre Rover Way Splott | Latos Cardiff Limited | 1,000 | Consented, not built |
| Ipswich Road, Cardiff - Battery Storage First Choice Accident Repair, Ipswich Road, Penylan, Cardiff | Green Frog Power 214 Limited | 93 | Consented, not built |
| Sully Moors Road - Battery Energy Storage Facility The Former Barry Power Station, Sully Moors Road, Dinas Powys | Centrica Plc Head Office | 50 | Consented, not built |
| The Wales Millennium Centre, Bute Place - Battery Energy Storage The Wales Millennium Centre Bute Place Butetown | Newton Energi Limited | 0.5 | Consented, not built |
| Gabalfa Interchange - Micro Energy Storage Pennard Place By Gabalfa Interchange Mynachdy | AMP Clean Energy | 0.2 | Consented, not built |
| Llanedeyrn Drive - Micro Energy Storage Project Llanedeyrn Drive | AMP Clean Energy | 0.2 | Consented, not built |
| Brynwell Farm Brynwell Farm, on land between the A4232 and Leckwith village | Brynwell Farm Solar Limited | – | Consented, not built |
| Land at Pen Onn - Solar Farm Land at Pen Onn, Llancarfan, Barry | Iolo Energy | – | Consented, not built |
| Old Wallace Farm, Dyffryn - Battery Energy Storage Old Wallace Farm, Dyffryn | Green Field Energy Developments Limited | – | Consented, not built |
| Vianshill Farm, Parc Dyffryn - Solar Farm & Battery Storage Land at Vianshill Farm, The Downs, St Nicholas, Vale of Glamorgan | Cenin Renewables Limited | – | Consented, not built |
| Castle Road, Burton - Battery Energy Storage System N/O Castle Road, Burton, Rhoose, Barry | Rewe 7 Limited | 440 | In planning |
| Caerau Lane, By Port Lane - Micro Energy Storage Caerau Lane, by Port Lane, Wenvoe | AMP Clean Energy | 0.2 | In planning |
| Lloyd George Avenue, Butetown - Micro Battery Storage Lloyd George Avenue, Butetown | AMP Clean Energy | 0.2 | In planning |
| Nettlefold Road, Meets Ocean Way - Micro Battery Storage Nettlefold Road, Meets Ocean Way | AMP Clean Energy | 0.2 | In planning |
| Cardiff Metropolitan University Plas Gw, Llantrisant Road - Battery Cardiff Metropolitan University Plas Gwyn, Llantrisant Road, Llandaff, Cardiff | Cardiff Metropolitan University | – | In planning |
| Cardiff Metropolitan University, Cyncoed Road - Solar Panels & BESS Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed | Cardiff Metropolitan University | – | In planning |
| Cardiff Metropolitan University, Llandaff Campus - Solar Panels Cardiff Metropolitan University Llandaff Campus, 200 Western Avenue, Llandaff | Cardiff Metropolitan University | – | In planning |
| Tramshed, Pendyris Street - Solar Panels & Battery Storage Tramshed Pendyris Street Grangetown | Tewdric Energy | – | In planning |
Battery storage in South Yorkshire
45 projects, 5,242 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Nether Moor Field Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire | Thurcroft Energy (Max Design Consultancy) | 49.9 | Operating |
| Barnsley Battery Energy Storage Land West of Hopewell Street, Stairfoot, Barnsley | G2 Energy & SMS Energy Services Ltd | 40 | Operating |
| Blackburn Meadows Blackburn Meadows in Sheffield, South Yorkshire | E.ON UK | 10 | Operating |
| Thrybergh Hydroelectric Scheme Thrybergh weir, Kilnhurst, South Yorkshire | Barn Energy | 0.3 | Operating |
| Stairfoot Battery Storage Facility Oaks Business Park, Oaks Lane, Hoyle Mill | Noriker Power Limited | – | Operating |
| Common Farm - Solar Farm & Battery Storage Common Farm, Todwick Road, Dinnington, Rotherham | Banks Renewable | 49 | Under construction |
| J3 Business Park - Battery Energy Storage Facility J3 Business Park, Wright Business Park, Balby Carr Bank, Balby, Doncaster | Forepower Limited | 10 | Under construction |
| Thorpe Marsh Power Station - Battery Energy Storage Thorpe Marsh Power Station Marsh Lane Barnby Dun Doncaster | West Burton Energy | 1,450 | Consented, not built |
| Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage Thorpe Marsh Power Station, Marsh Lane, Barnby Dun, Doncaster | West Burton Energy & Banks Group | 1,400 | Consented, not built |
| The Balk, Almholme - Energy Storage System The Balk, Almholme, Doncaster | Innova Renewables | 1,025 | Consented, not built |
| Fordtead Lane, Thorpe Marsh - Battery Energy Facility Land At Fordstead Lane Almholme Doncaster | Newton Energi Limited | 180 | Consented, not built |
| Moat Lane, Wickersley - Battery Storage Facility Moat Lane, Wickerlsey, Rotherham | Newton Energi Limited | 100 | Consented, not built |
| Green Lane, Thurcroft - Battery Energy Storage Facility Green Lane, Thurcroft, Rotherham | Newton Energi Limited | 85 | Consented, not built |
| Cutts Bros, Wharf Road - Battery Storage Facility Cutts Bros, Wharf Road, Doncaster | Newton Energi Limited | 50 | Consented, not built |
| Swangate Project - Energy Storage System Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow | Econergy International Limited | 50 | Consented, not built |
| Claire Court, Rawmarsh Road - Battery Energy Storage Facility Claire Court, Rawmarsh Road, Northfield | Conrad Energy (Developments) Ii Limited | 40 | Consented, not built |
| Tofts Lane, Hunshelf - Battery Storage Tofts Lane, Hunshelf | Harmony HS (JV) Limited | 40 | Consented, not built |
| West Melton Electricity Substation - Energy Storage System SW/O West Melton Electricity Substation Elsecar Road Brampton Bierlow | Brampton Energy Storage Limited | 26 | Consented, not built |
| Yarra Industrial Estate, Loicher Lane - Battery Storage Yarra Industrial Estate North Side Of Loicher Lane Ecclesfield | Ecclesfield Power Limited | 20 | Consented, not built |
| J3 Business Park - Battery Storage Facility Balby Carr Bank, Doncaster | Forepower Limited | 16 | Consented, not built |
| Woodlands - Battery Energy Storage Electricity Sub-station Compound Land To The West Of County Way Woodlands Doncaster | Infinis Battery Storage Limited | 1.2 | Consented, not built |
| Hazlehead Wind Farm Battery Hazlehead Battery, Wind Farm, Crow Edge, Hazlehead Wind Farm, Sheffield | Banks Renewables | 1 | Consented, not built |
| Aggreko UK, Sandall Stones Road - Battery Energy Storage Aggreko Uk Limited, Kirk Sandall Industrial Estate, Sandall Stones Road, Kirk Sandall, Doncaster | Aggreko UK Limited | – | Consented, not built |
| Aven Industrial Park, Tickhill Road - Battery Storage Aven Industrial Park Tickhill Road Maltby | Power Initiatives Limited | – | Consented, not built |
| Fenwick Solar Farm & Battery Storage Thorpe Marsh Substation, Barnby Dun, Doncaster | Boom Developments Limited | – | Consented, not built |
| Hunsley Street - Battery Energy Storage Jnt Hunsley Street Carlisle Road Sheffield | Mercia Power Response | – | Consented, not built |
| Magna Way, Templeborough - Battery Energy Storage Facility Fusion At Magna, Magna Way, Templeborough, Rotherham | Newton Energi | – | Consented, not built |
| Orgreave Place - Flexible Energy Facility Adj 24 Orgreave Place, Sheffield | DBS 1 Limited | – | Consented, not built |
| Petre & Carlisle Street East & Petre Street - Battery Storage Rear Of 400 Petre Street And Carlisle Street East, And Site Of 350 Petre Street | Mercia Power Response | – | Consented, not built |
| Thurcroft Battery Storage, Green Lane - Battery Energy Storage System Thurcroft Battery Storage, Green Lane, Thurcroft, Rotherham | HC ESS7 LIMITED | – | Consented, not built |
| Upwell Street - Battery Energy Storage Formerly MHH Contracting Limited Upwell Street Sheffield | Newton Energi Limited | – | Consented, not built |
| Warren Farm Solar Farm & Battery Storage Land At Warren Farm Dunsville Doncaster | Enso Green Holdings I Limited | – | Consented, not built |
| The Tween Bridge Solar Farm Moor Owners Rd, Thorne, Doncaster | RWE | 400 | In planning |
| Maltby Solar Farm North Of Stainton Lane At Maltby Colliery Stainton | Infinis Energy Services Limited | 50 | In planning |
| Thurcroft Interchange Energy Park - Battery Energy Storage System Morthern Lane, Thurcroft, Rotherham | Exagen | 50 | In planning |
| Brinsworth Road, Brinsworth - Battery Energy storage N/O Brinsworth Road, Brinsworth, Rotherham | Root Power South Limited | 40 | In planning |
| Butt Lane, Hooton Pagnell Battery Energy Storage Butt Lane, Hooton Pagnell, Doncaster | British Solar Renewables | 30 | In planning |
| Mere Flats Solar Farm Moor Lane Micklebring | NextPower UK | 16 | In planning |
| New South Farm, Piper Lane - Solar Farm New South Farm, Piper Lane, Aston, Sheffield | Abei Energy Group | 12 | In planning |
| Eco Power Stadium, Stadium Way - Battery Energy Storage Eco Power Stadium Stadium Way | Doncaster Rovers Football Club Limited | 0.4 | In planning |
| Green Lane, Scawthorpe - Micro Energy Storage S/O Green Lane, Scawthorpe, Doncaster | AMP Clean Energy | 0.2 | In planning |
| Chesterfield Road, Swallownest - Battery Energy Storage Chesterfield Road, Swallownest, Sheffield | Conrad Energy Developments Ii Limited | – | In planning |
| Hard Lane, Kiveton Park - Battery Energy Storage System W/O Hard Lane, Kiveton Park, Sheffield | Harmony Energy | – | In planning |
| Moorhouse Grange, Moorhouse Lane - Battery Energy Moorhouse Grange, Moorhouse Lane, Moorhouse, Doncaster | Zetland Group | – | In planning |
| Whitestone Solar Farm 3 Separate Sites, Rotherham | Net Zero One Ltd | – | In planning |
Battery storage in Staffordshire
33 projects, 2,958 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Noriker Power Staunch Holditch House, Holditch Road, Chesterton | Hazel Capital& Noriker Power | 20 | Operating |
| Keele University Keele, Newcastle-Under-Lyme | Keele University | – | Operating |
| Cellarhead Substation, Rownall Road - Battery Energy Facility East of Cellarhead Substation, and West of Rownall Road, Wetley Rocks | C&S Energy Limited | 400 | Under construction |
| Lions Den, Hammerwich - Battery Storage Facility N/O A5 Lions Den, Hammerwich, Burntwood | Elgin Energy Services Limited | 100 | Consented, not built |
| Newfields Farm, Rownall Road - Battery Energy Storage Newfields Farm, Rownall Road, Wetley Rocks, Stoke on Trent | REPD Limited | 99.9 | Consented, not built |
| Armshead Farm, Armshead Road - Battery Energy Storage Facility Adj Armshead Farm, Armshead Road, Werrington, Stoke on Trent | Conrad Energy (Developments) Limited | 50 | Consented, not built |
| Hinksford Substation, Hinksford Lane - Battery Energy Storage Adj To Hinksford Substation, Hinksford Lane, Hinksford, Kingswinford | Balance Power Projects Limited | 50 | Consented, not built |
| Levedale Road, Levedale - Battery Energy Storage Land On South West Side Of Levedale Road | Anglo Renewables Limited | 50 | Consented, not built |
| Penstone Lane, Penn 1 - Battery Storage Facility Field At (Penn 1) Penstone Lane Lower Penn | Anglo Renewables Limited | 50 | Consented, not built |
| Brown Edge - Battery Storage Bemersley Road, Brown Edge | Anesco | 49.5 | Consented, not built |
| Draycott Cross Road - Battery Storage System Draycott Cross Road, Stoke on Trent | Balance Power Projects Limited | 40 | Consented, not built |
| Rubber and Allied Products Rubber & Allied Products Ltd, Turner Crescent, Newcastle-Under-Lyme, Staffordshire | Volta Energy Storage | 40 | Consented, not built |
| Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage Lower Farm Drointon Lane Grindley | Innova Renewables | 30 | Consented, not built |
| Upper Newton Farm (Blythe House) - Solar Farm & Battery Storage Upper Newton Farm, Draycott Road, Upper Tean | Innova Renewables | 30 | Consented, not built |
| Aspley House Farm, Aspley Lane - Battery Storage Facility Aspley House Farm Aspley Lane Slindon Stafford | Hydrock | 10 | Consented, not built |
| Brooms Road - Micro Energy Storage Ne/O Brooms Road, Stone | AMP Clean Energy | 0.2 | Consented, not built |
| Coaldale Road & Ore Close, Lymedale Business Park - Micro Energy Storage Ore Close | AMP Clean Energy | 0.2 | Consented, not built |
| Cromartie Hobbycraft, From Park Hall Road - Micro Energy Storage Entrance To Cromartie Hobbycraft From Park Hall Road | AMP Clean Energy | 0.2 | Consented, not built |
| Barlaston - Battery Energy Storage System Adj Meaford Road Barlaston Stoke On Trent | Dorrymee Limited | – | Consented, not built |
| Burton Enterprise Park, Hawkins Lane - Battery Energy Storage Burton Enterprise Park Hawkins Lane Burton upon Trent | FPC Electric Land Limited | – | Consented, not built |
| Euro Car Parts - Solar Panels & Battery Storage Euro Car Parts Tam2 Birch Coppice Business Park Danny Morson Way Dordon | Ivegate Limited | – | Consented, not built |
| Grey Friars Way - Battery Storage Greyfriars Way | Mercia Power Response | – | Consented, not built |
| The 4 Candles, High Street - Battery Storage The 4 Candles, 91 High Street, Wolstanton, Newcastle Under Lyme | DCMS | – | Consented, not built |
| Drakelow - Battery Energy Storage System North of Main Street, Walton Up on Trent | Tagenergy Development UK Limited | 1,000 | In planning |
| Cellarhead Substation, Rownall Road - Battery Storage Facility SOUTH OF CELLARHEAD SUBSTATION AND WEST OF, Rownall Road, Wetley Rocks, Staffordshir | S & C Energy Limited | 400 | In planning |
| Leek Road, Werrington - Battery Energy Storage Leek Road, Werrington, Stoke on Trent | Masdar Arlington Energy | 300 | In planning |
| Hawkesyard Estate, Rugeley Road - Battery Energy Storage Land Adj Hawkesyard Estate Rugeley Road | GSC Hawkesyard Limited | 100 | In planning |
| Tean Leys Farm, Tean Leys - Battery Storage Tean Leys Farm, Tean Leys, Lower Tean, Stoke on Trent | Tean Leys Energy Storage Limited | 70 | In planning |
| Yew Tree Farm, Drointon Lane Yew Tree Farm Drointon Lane Grindley Stafford | Push Energy | 30 | In planning |
| Upper Leigh - Battery Energy Storage System Lower Tean Leys, Tean Leys, Lower Tean | Lightrock Power | 20 | In planning |
| Flashbrook Road, Knighton - Solar Farm Adj Haberdashers Arms, Flashbrook Road, Knighton, Stafford | Scottish Power Renewables | 15 | In planning |
| Cellarhead Substation, Rownall Road - Battery Storage Adjacent Cellarhead Substation, Rownall Road, Wetley Rocks | Sirius Renewable Energy Limited | 2.6 | In planning |
| Greenfields Farm, Thorney Edge Road - Battery Energy Storage Greenfields Farm, Thorney Edge Road, Bagnall, Stoke on Trent | Enso Energy | – | In planning |
Battery storage in Stirling
3 projects, 418 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Glenside Farm - Battery Storage Glenside Farm, Plean | Apatura | 400 | Consented, not built |
| Earlsburn Avenue - Earlsburn Wind Farm Extension Earlsburn Avenue, Stirling | Naturalis Energy & REG Wind Power & Falck Renewables | 18 | Consented, not built |
| Central Boulevard, Central Park - Micro Energy Storage Facility The South Of 4 Central Boulevard Central Boulevard Central Park Larbert | AMP Clean Energy | 0.2 | Consented, not built |
Battery storage in Strabane
3 projects, 92 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Battery Energy Storage Facility Development in Derry Lands Approximately 64 M Sw/o 18 Balliniska Rd., Approximately 80 M SE/o Springtown Industrial Estate | Heron Property Limited | 17 | Consented, not built |
| Battery Energy Storage Development in Tyrone Lands Approximately 195m North of 18 Shannaghy Road, Killeter, Tyrone | Gronan Wind Farm Limited | – | Consented, not built |
| Power Generation in Development in Claudy Lands 85M Northeast Of No. 10 Gortnaran Road, Claudy | Ballyarton Energy Limited | 75 | In planning |
Battery storage in Strathclyde
57 projects, 5,333 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Coalburn Energy - Battery Storage 700m N/O Birkhill Mill, Cairnhouses Road, Lanark | Alcemi Storage Development Limited | 500 | Operating |
| Kilmarnock South Substation - Battery storage Kilmarnock South Substation Treeswoodhead Road | Zenobe Energy | 300 | Operating |
| Glasgow Airport Solar Farm 50 Metres East Of Walkinshaw Gardens Barnsford Road Paisley | AGS Airports Limited | – | Operating |
| Windyhill Battery Storage Facility Windyhill, Baljaffray Road, Glasgow | Energy GridPower Ltd & Revera Energy | 200 | Under construction |
| Cumberhead West Wind Farm Cumberhead Forest | 3R Energy Solutions Limited | 40 | Under construction |
| Douglas West Wind Farm (extension) Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark | ScottishPower Renewables (UK) Limited | 20 | Under construction |
| Auchentiber Road - Battery Energy Storage System Auchentiber Road, Port Glasgow, Kilmalcolm | Apatura GPC 700 Limited | 700 | Consented, not built |
| Hagshaw, Conexus West -Battery Energy Storage System Hagshaw, M74 Heat & Power Park, Conexus West, W/O Jnct 11 of M74, Coalburn, Lanark | 3R Energy Solutions Limited | 500 | Consented, not built |
| Red Moss - Battery Storage Red Moss, B7078, Crawfordjohn, Biggar | Green Switch Capital Limited | 342 | Consented, not built |
| Carlisle Road - Battery Energy Storage System Coalburn Battery Energy Storage System, Adj Carlisle Road, B7078, Coalburn, Lanark | Zenobe Energy | 200 | Consented, not built |
| North Lanrigg Energy Storage Carlisle Roadm Motherwell | North Lanrigg Battery Storage Limited | 200 | Consented, not built |
| Whitehill Energy Storage Whitehill Farm, Coatbridge Road | Intelligent Land Investments Group | 200 | Consented, not built |
| Downiebrae Road, Rutherglen - Battery Energy Storage System Downiebrae Road, Rutherglen | Battery Box Limited | 150 | Consented, not built |
| Rogerhill Solar and Battery Energy Storage System Land 300M West Of Rogerhill Farm Rogerhill Farm Vere Road Kirkmuirhill | Green Switch Capital Limited | 100 | Consented, not built |
| Port of Dundas - Battery Storage Port of Dundas, Mary Street, Glasgow | Fig Power | 90 | Consented, not built |
| Saturland Farm, Salterland Road - Battery Energy Storage System Saturland Farm, 168 Salterland Road, Glasgow | Resources Unlimited LLP | 60.8 | Consented, not built |
| Holmquarry Road - Battery Storage Holmquarry Road | Big Battery (Holmquarry Road) Limited | 60.4 | Consented, not built |
| Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System Inchbean Farm, Treeswoodhead Road, Shortlees, Kilmarnock | RNA Energy Limited | 60 | Consented, not built |
| East Rogerton Cottage, Markethill Road - Battery Storage Facility East Rogerton Cottage, Markethill Road, East Kilbride, Glasgow | Apatura - GPC 680 Limited | 55 | Consented, not built |
| Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage Eaglesham | Scottish Power Renewables | 50 | Consented, not built |
| Broomloan Road - Battery Energy Storage 322 Broomloan Road, Glasgow | Lifetime Property Limited | 49.9 | Consented, not built |
| Flatterton Farm, Flatterton Road - Battery Storage Flatterton Farm, Flatterton Road, Greenock | Big Battery (Flatterton Farm) Limited | 49.9 | Consented, not built |
| SSE Taynuilt Substation - Battery Energy Storage Adjacent To SSE Taynuilt Substation Taynuilt | Downing Energy Development Company Limited | 49.9 | Consented, not built |
| Well Street - Battery Storage Former Gasholder Station At Junction With Underwood Road Well Street | Larkfleet Group | 49.5 | Consented, not built |
| Sclenteuch Wind Farm Sclenteuch Wind Farm, Cumnock | RES Limited | 45 | Consented, not built |
| Glentaggart - Battery Energy Storage Mid Rig, Glentaggart, Douglas, Biggar | South Lanarkshire Council & Brockwell Energy Limited | 42 | Consented, not built |
| Ladyfield Renewable Energy Park Ladyfield Wind Farm, Inveraray | Ridge Clean Energy Limited | 41.4 | Consented, not built |
| Dalmarnock Road - Battery Storage Dalmarnock Road, Adjacent To A749 & Downiebrae Road Rutherglen | EcoDev Group Limited | 40 | Consented, not built |
| Knockair, Dougliehill Road - Battery Storage Facility Former Dougliehill Water Treatment Works, Dougliehill Road, Port Glasgow | Renewco Power | 24 | Consented, not built |
| Wardlaw Wood Windfarm - Battery Storage East Of Wardlaw Wood Windfarm | Community Windpower Limited | 20 | Consented, not built |
| Tofts - Battery Storage Site Of Former Bridgend Mill Tofts | Telford Three Limited | 19.9 | Consented, not built |
| Greenburn Wind Park Land Adj Former Opencast, Greenburn Wind Park, New Cumnock, Cumnock, Strathclyde | REG Windpower Limited | 10 | Consented, not built |
| Elvanfoot, Leadhills Road - Battery Storage 335M West Of 52 Dumfries Road Leadhills Road Elvanfoot | Muirhall Energy Limited | 9.8 | Consented, not built |
| Rowan Wind Farm Kilberry Wind Farm Kilberry | Energiekontor UK Limited | 5 | Consented, not built |
| Whitelaw Brae Wind farm Whitelaw Brae Wind Farm, Tweedsmuir, Biggar | Thrive Renewables | 4 | Consented, not built |
| Glenhove Pumping Station, Glenhove Road - BESS Glenhove Pumping Station Glenhove Road Carbrain | Scottish Water | 3.1 | Consented, not built |
| Forthside Way - Battery Storage Unit The Peak Stirling Sports Village Forthside Way, Stirling | Stirling Council | 1 | Consented, not built |
| Heathland Wind Farm Heathland Wind Farm, Near Forth, Lanark | EDF Energy Renewables | – | Consented, not built |
| Scottish Fire & Rescue Service, Westburn Drive - Solar Array & BESS Scottish Fire And Rescue Service Headquarters Westburn Drive Cambuslang | Scottish Fire and Rescue Service | – | Consented, not built |
| East Fulwood Energy Storage Houston Road, Freeland, Erskine | Lightsourcebp | 400 | In planning |
| Bodinglee Wind Farm Bodinglee Road, Wiston, Biggar | Banks Group | 106 | In planning |
| Braidfield Road, Hardgate - Battery Storage Facility Braidfield Road, Hardgate, Clydebank | Intelligent Land Investments Group Plc | 100 | In planning |
| Hagshaw Hill III Energy Project - LDES Hagshaw Hill Iii Wind Farm, Opencast Mine At Poniel Access Roads Douglas, Lanark | 3R Energy Solutions Limited | 50 | In planning |
| Ravengill Energy Park - Wind Farm & Battery Energy Storage Ravengill Energy Park, 1km N/O Leadhills Village & 1.5km S/O Abington Village | Renewco Power Limited | 50 | In planning |
| South Kyle Wind Farm 2 N/W of South Kyle wind farm, Ayr | Vattenfall | 50 | In planning |
| Watchman Energy Park 11 km south of Crawford and 7 km south of Elvanfoot, Biggar | Renewco Power | 50 | In planning |
| Govan Battery Energy Storage System Adj To 603 Helen Street, Glasgow | Vital Energi Utilities Limited | 49.9 | In planning |
| Leadhills Road, Elvanfoot Phase 2 - BESS 190M Northwest Of 3 Leadhills Road Leadhills Road Elvanfoot | Elvanfoot Energy Storage 2 Limited | 49.9 | In planning |
| Laigh Park Water Treatment Works - Battery Energy Storage System Laigh Park Water Treatment Works, Abercorn Street, Paisley | Bluestone Energy | 49.5 | In planning |
| Breezy Hill, North Kyle Forest Estate - BESS The North Kyle Forest Estate, Approximately 4.5km N/O Dalmellington, Ayr | Brockwell Energy Limited | 40 | In planning |
| Elvanfoot, Leadhills Road - Phase 3 - BESS 290m Nw/O 3 Leadhills Road, Elvanfoot, Biggar | Elvanfoot Energy Storage 3 Limited. | 25 | In planning |
| Vale of Leven Wind Farm Kilpatrick Hills, Bonhill, Alexandria | Coriolis Energy Limited | 20 | In planning |
| Barbana Road, Redwood Drive & Redwood Crescent - Battery Storage Barbana Road, Adjacent To The Junction Of Redwood Drive And Redwood Crescent | AMP Clean Energy | 0.2 | In planning |
| Main Street - Battery Storage Main Street Straiton | AMP Clean Energy | 0.2 | In planning |
| Clyde Gateway Trade Park, Dalmarnock Road - Battery Energy Storage 155m N/O 1a Clyde Gateway Trade Park, Dalmarnock Road, Rutherglen, Glasgow | NextPower Rutherglen Limited | – | In planning |
| Hare Hill Wind Farm Repowering Near New Cumnock | SSE Renewables | – | In planning |
| Loch Awe - Eredine Wind Farm Btw Loch Awe & Loch Fyne, Lochgilphead | RWE Renewables UK Limited | – | In planning |
Battery storage in Suffolk
52 projects, 1,486 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Bramford Substation Land Adjacent To, Bullen Lane, Bramford, Ipswich, Suffolk | Pivot Power & EDF Renewables | 57 | Operating |
| Tye Lane - Solar Farm N/O Tye Lane, Bramford, Ipswich | EDF Energy Renewables | – | Operating |
| University Of Suffolk Campus North University Of Suffolk Campus N, New Street, Ipswich | Suffolk County Council | – | Operating |
| Bullen Lane - Battery Storage S/O Bullen Lane | Cambridge Power Limited & Pivot Power | 100 | Under construction |
| Norwich Road Industrial Estate Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth | Eelpower Limited | 50 | Under construction |
| Church Farm, The Channel - Bramford Solar Farm and Battery Storage S/O Church Farm, E/O The Channel, Burstall, Somersham, Ipswich | Bramford Green Limited | – | Under construction |
| Bullen Lane, Bramford - Battery Energy Storage Adj To Bullen Lane, Bramford, Ipswich | Clearstone Energy Limited | 400 | Consented, not built |
| Yaxley, Eye Airfield Industrial Estate - Battery Storage System S/o Eye Airfield Industrial Estate Castleton Way Yaxley, Eye | Field Yaxley Limited | 200 | Consented, not built |
| Surmer Hall, Church Walk - Solar Farm & Battery Storage South Of Sturmer Hall Church Walk Sturmer | Boultbee Brooks (Renewables Rowley Hill) Limited | 22 | Consented, not built |
| Wissett Solar Farm, Wissett - Battery Storage (Apple Tree) UKZ139 BC Wissett Solar Farm, Grays Lane, Wissett | Pathfinder Clean Energy UK Dev Limited | 10 | Consented, not built |
| Coxhall Road, Tattingstone - Battery Storage South Of Coxhall Road Tattingstone | AMP Energy Services Limited | 5 | Consented, not built |
| Burnt House Farm, Hoxne Road - BESS Burnt House Farm, Hoxne Road, Eye | Ford Farms (Suffolk) Limited | 0.4 | Consented, not built |
| Africa Alive, Whites Lane - Battery Energy Storage System Africa Alive Whites Lane Kessingland | Zoological Society of East Anglia | 0.2 | Consented, not built |
| Alexandra Road, Windham Road - Energy Storage System Alexandra Road/Windham Road Junction Chilton Industrial Estate | AMP Clean Energy | 0.2 | Consented, not built |
| Beacon House, White House Road - Battery Storage Facility Beacon House, White House Road, Ipswich | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Birkfield Drive - Micro Energy Storage Facility R/O St Josephs College, Birkfield Drive, Ipswich | AMP Clean Energy | 0.2 | Consented, not built |
| Church Field Road, Waldingfield Road - Micro Energy Storage Church Field Road By Waldingfield Road | AMP Clean Energy | 0.2 | Consented, not built |
| College Heath Road, Mildenhall - Micro Energy Storage System Electricity Sub Station, College Heath Road, Mildenhall, Bury St Edmunds | AMP Clean Energy | 0.2 | Consented, not built |
| Crown Car Park - Micro Energy Storage Facility Crown Car Park, Charles Street, Ipswich | AMP Clean Energy | 0.2 | Consented, not built |
| Curzon Road, Chilton Industrial Estate - Micro Energy Storage The End Of Curzon Road, Chilton Industrial Estate, Sudbury | AMP Clean Energy | 0.2 | Consented, not built |
| Gatacre Road - Micro Energy Storage Facility R/O 4-8 Gatacre Road | AMP Clean Energy | 0.2 | Consented, not built |
| Harvest Drive, Gisleham - Micro Energy Storage Harvest Drive, Gisleham, Lowestoft | AMP Clean Energy | 0.2 | Consented, not built |
| Haverhill Road, Little Wratting - Micro Energy Storage Haverhill Road Little Wratting Suffolk | AMP Clean Energy | 0.2 | Consented, not built |
| Homefield Road - Micro Energy Storage Facility 10 Homefield Road, Haverhill | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Marguerite Jeffries Centre - Micro Energy Storage Unit Marguerite Jeffries Centre, Ipswich | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Mount Road & Prigmore Drive, Great Barton - Battery Energy Storage System Access Road From C692 To The Flying Fortress Ph Great Barton | AMP Clean Energy | 0.2 | Consented, not built |
| Outside Crown House, Crown Street - Micro Energy Storage Outside Crown House, Crown Street, Ipswich | AMP Clean Energy | 0.2 | Consented, not built |
| Park Farm House, Vicarage Lane - Energy Storage System Park Farm House, Vicarage Lane, Ipswich | AMP Energy Services Limited | 0.2 | Consented, not built |
| Phoenix Business Park, Haddenham Road - Micro Energy Storage Facility Verge Adjacent 1 Phoenix Business Park Haddenham Road Gisleham | AMP Clean Energy | 0.2 | Consented, not built |
| Phoenix Road, Haddenham Road - Micro Energy Storage Facility Adjacent 11 Phoenix Road Haddenham Road Gisleham | AMP Clean Energy | 0.2 | Consented, not built |
| Progress Way, Eye Airfield Industrial Estate - Micro Energy Storage Verge Off Progress Way, Eye Airfield Industrial Estate, Eye | AMP Clean Energy | 0.2 | Consented, not built |
| Progress Way, Mid Suffolk Business Park - Energy Storage System Verge Off Progress Way, Eye Airfield Industrial Estate, Eye | AMP Clean Energy | 0.2 | Consented, not built |
| Raeburn Road South and Gainsborough Lane - Micro Energy Storage System Raeburn Road South & Gainsborough Lane | AMP Clean Energy | 0.2 | Consented, not built |
| Westbourne Branch Library, Sherrington Road - Micro Energy Storage Adjacent To Westbourne Branch Library Sherrington Road | AMP Clean Energy | 0.2 | Consented, not built |
| Woodhall Business Park - Micro Energy Storage System Woodhall Business Park, Sudbury | AMP Clean Energy | 0.2 | Consented, not built |
| Aldeby Landfill Site Solar Park Aldeby Landfill Site, Beccles | Infinis Solar Developments Limited | – | Consented, not built |
| Brandon Fields Estate, Brandon Fields - Battery Energy Storage Brandon Fields Estate, Brandon Fields, Brandon | OPDE Energy | – | Consented, not built |
| Firsfield Solar Farm E/O Firsfield, Bardwell, Bury St Edmunds | Enray Power Limited | – | Consented, not built |
| Suffolk Yacht Harbour, Levington - Solar Array North Of Suffolk Yacht Harbour Levington | Suffolk Yacht Harbour Limited | – | Consented, not built |
| Red House Farm, Old Norwich Road - Battery Energy Storage System Red House Farm Old Norwich Road Yaxley | The Surrey Research Park | 520 | In planning |
| Greybarn Solar Energy Farm Greybarn Solar Energy Farm Land At Bramford, Flowton And Burstall | Statkraft UK | 55 | In planning |
| Kettleburgh Road Easton - Solar Panels & Battery Storage North Of Kettleburgh Road Easton And Land South Of The Street Letheringham | Quintas Cleantech | 50 | In planning |
| Wales End Road, Cavendish - Battery Energy Storage System N/O Wales End Road, Cavendish, Sudbury | Noventum Power Limited | 10 | In planning |
| Barnards Meadow, Barnards Way - Micro Energy Storage Facility South Of Barnards Meadow Barnards Way | AMP Clean Energy | 0.2 | In planning |
| Birkfield Drive, Mallard Way - Battery Storage Birkfield Drive, Near Mallard Way, Ipswich | AMP Clean Energy | 0.2 | In planning |
| Dairy Farm, Burgh Road - Solar Array & Battery Storage Dairy Farm Burgh Road Wheatacre | E S Burroughs & Son | 0.2 | In planning |
| Felixstowe Road & Anson Road - Micro Energy Storage Intersection Of Felixstowe Road And Anson Road Martlesham | AMP Clean Energy | 0.2 | In planning |
| George Lambton Avenue, Bill Rickaby Drive - Battery Energy Storage George Lambton Avenue, Opp Bill Rickaby Drive | AMP Clean Energy | 0.2 | In planning |
| Halesworth Middle School, Harrisons Lane - Micro Energy Storage System Adj Halesworth Middle School, Harrisons Lane, Halesworth | Aggregated Micro Power Holdings Plc | 0.2 | In planning |
| Landseer Park Entrance, Landseer Road - Micro Energy Battery Storage Landseer Park Entrance, Landseer Road | AMP Clean Energy | 0.2 | In planning |
| Mansbrook Boulevard - Micro Energy Battery Storage Facility West Mansbrook Boulevard | AMP Clean Energy | 0.2 | In planning |
| The Street, Hacheston - Battery Energy Storage System South On Electricity Sub Station, The Street, Hacheston, Woodbridge | Balance Power Projects Limited | – | In planning |
Battery storage in Surrey
30 projects, 668 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Dorking Battery Energy Storage System Milton Court Farm, Milton Court Lane, Dorking, Surrey, RH4 3LY | Grid Battery Storage (GBSL) | 6 | Operating |
| Sunbury Battery Energy Storage System - Battery Energy Storage System Ne/O Eco Park, Charlton Lane, Shepperton | EcoDev Group Limited | 200 | Consented, not built |
| Penn Croft Farm, Crondall - Battery Energy Storage Facility Penn Croft Farm Penn Croft Crondall Farnham | Fleet BESS Limited & SSE Energy Solutions Limited | 100 | Consented, not built |
| Crondall Road, Crondall - Fleet Bramley Battery Energy Storage West Side Of Crondall Road, Crondall, Farnham | Cragside Energy Limited | 99.9 | Consented, not built |
| Barnett Wood Lane - Battery Storage Northwest of Barnett Wood Lane | Bluestone Energy | 98 | Consented, not built |
| Rushett Lane - Battery Storage System North Of Rushett Lane Chessington | Enso Energy | 30 | Consented, not built |
| Caterham Bypass - Battery Energy Storage E/O Caterham Bypass, Caterham | Root-Power Limited | 12 | Consented, not built |
| Addlestone Moor, Chertsey Road - Micro Energy Storage System The end of Addlestone Moor, by Chertsey Road | AMP Clean Energy | 0.2 | Consented, not built |
| Aldershot Road, Fairlands - Micro Energy Storage Unit Grass verge near 45 St Michaels Avenue | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Electricty Sub Station, Wilders Close - Micro Energy Storage Electricty Sub Station Land To The Rear Of 10 - 12 Fairmead | AMP Clean Energy | 0.2 | Consented, not built |
| Godstone Fire Station, Fosterdown - Micro Energy Storage Facility Verge at Godstone Fire Station, Fosterdown, Godstone | AMP Clean Energy | 0.2 | Consented, not built |
| Hollywood Quarter, Church Street East - Micro Energy Storage Facility Hollywood Quarter Church Street East | ZAKE Developments | 0.2 | Consented, not built |
| Rydens Road - Micro Energy Storage Rydens Road, Walton on Thames | AMP Clean Energy | 0.2 | Consented, not built |
| Verge At Succombs Hill, By Wapses Lodge Roundabout - Battery Storage Verge At Succombs Hill, By Wapses Lodge Roundabout, Caterham | AMP Clean Energy | 0.2 | Consented, not built |
| W R Sports Club, The Centre - Micro Energy Storage Facility W R Sports Club, The Centre, Woodthorpe Road, Ashford | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| West Side Of France Hill Drive - Battery Energy Storage The West Side Of France Hill Drive, Camberley | AMP Clean Energy | 0.2 | Consented, not built |
| Woking Road & Whitemore Road - Battery Storage System Btw Woking Road And Whitemore Road, Guildford | AMP Clean Energy | 0.2 | Consented, not built |
| Woodhatch Place, Cockshot Hill - Micro Energy Storage System Woodhatch Place 11 Cockshot Hill | AMP Energy Services Limited | 0.2 | Consented, not built |
| Duxhurst Farm, Duxhurst Lane - Solar Farm Duxhurst Farm Duxhurst Lane Sidlow | Enviromena | – | Consented, not built |
| University For The Creative Arts, Falkner Road - ASHP & Battery Storage University For The Creative Arts Falkner Road | University for the Creative Arts | – | Consented, not built |
| University for the Creative Arts , Ashley Road - GSHP, Battery & Solar Panels University College For The Creative Arts 21 Ashley Road | University for the Creative Arts | – | Consented, not built |
| Weymanor Road - Battery Storage N/O Weymanor Road, Addlestone | FPC Electric Land Limited | – | Consented, not built |
| Bowenhurst Farm, Mill Lane - Battery Energy Storage Bowenhurst Farm & Stud, Mill Lane, Farnham | Bowenhurst BESS Limited | 100 | In planning |
| Guildford Road Battery Storage Facility W/O Guildford Road | Conrad Energy (Developments) Limited | 14 | In planning |
| Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage Twynersh Meadows Land west of Thorpe Road and north of St Anns Road | Runnymede Borough Council | 5 | In planning |
| Lucas Green Road - Micro Energy Storage System Battery Box Lucas Green Road West End | AMP Clean Energy | 0.2 | In planning |
| Merstham Community Hub, Merstham - Energy Storage Facility Merstham Community Hub, Merstham, Redhill | Aggregated Micro Power Holdings Plc | 0.2 | In planning |
| Tilford Road, Nr Tower Road - Micro Energy Storage Facility Tilford Road, Tower Road Jnct, Hindhead | AMP Clean Energy | 0.2 | In planning |
| Garson Farm, Winterdown Road - Solar Panels & Battery Storage Garson Farm, Winterdown Road | Thompson Brothers Esher Limited | – | In planning |
| London Road - Battery Storage 273 London Road, Staines-upon-Thames | Reliagen Energy Limited | – | In planning |
Battery storage in Tayside
15 projects, 469 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Dundee Technology Park Land At Technology Park, South Road, Dundee, Tayside | Gigabox Developments | 49.9 | Operating |
| Dunsinane Industrial Estate Land To The W/O Kinnoull Stree, Dunsinane Avenue, Dunsinane Industrial Estate, Dundee, Tayside | JLEN Environmental Assets Group | 49.9 | Operating |
| Pleasance Road - Battery Energy Facility 130 Metres South East Of Coupar Angus Substation Pleasance Road Coupar | Gresham House | 49.9 | Operating |
| Stirling Battery and Solar Energy Park Mains Of Keithick Farm, Keithick, Blairgowrie | EcoDev Group Limited | 50 | Consented, not built |
| Coupar Angus, Pleasance Road - Battery Energy Facility 130 Metres South East Of Coupar Angus Substation Pleasance Road | Gresham House Asset Management Limited | 49.9 | Consented, not built |
| Shindour - Energy Storage Facility Shindour Feddal Hill Wood Braco, Dunblane | Gigabox Developments Limited | 49.9 | Consented, not built |
| Killin Switching Station, Boreland - Boreland Energy Storage Park E/O Killin Switching Station, Boreland, Glen Lochay, Killin | Boreland Energy Limited | 43 | Consented, not built |
| Locarno Works, Brown Street - Battery Storage Locarno Works Brown Street | Torridon Developments Limited | 39.9 | Consented, not built |
| Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm Mains Of Keithick Farm, Keithick, Blairgowrie | EcoDev Group Limited | 16 | Consented, not built |
| Newburgh Road, Abernethy - Energy Storage 110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth | Centrica Business Solutions | 15 | Consented, not built |
| Binn Farm Solar Farm Binn Farm, Glenfarg, Perth | Trio Power Limited & BLC Energy | 6 | Consented, not built |
| East Gormack Farm - Battery storage 100 Metres SW/o East Gormack Farm, Blairgowrie | Lornty Farms | – | Consented, not built |
| Loch Levens - Solar Array and Battery Land 70 Metres North East Of Loch Levens Larder Wester Balgedie | Loch Levens Larder | – | Consented, not built |
| Rowan Gate - Solar Farm 400 Metres Ne/O Rowan Gate, Bardrill Road, Blackford, Auchterarder | Blackford Farms | – | Consented, not built |
| Brunt Hill Wind Farm & Battery Storage 4.5km Nw/O Kinross, Kinross | E Power Limited | 50 | In planning |
Battery storage in Torfaen
1 project, 0 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Pentre Bach Solar Farm Pentre Bach adjacent to Pentre Lane, Cwmbran | Elgin Energy EsCo Ltd | – | Consented, not built |
Battery storage in Tyne and Wear
24 projects, 529 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Port of Tyne Port of Tyne, Tyne Dock, South Shields, Tyne & Wear | Foresight | 35 | Operating |
| Tynemouth Energy Storage System (TESS) Newcastle | Enel (formerly Element Power) | 25 | Operating |
| Standby Embedded Stor Power Plant - Battery storage Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields | Green Frog Power 214 Limited | 20 | Under construction |
| Newburn Bridge Road - Battery Storage Facility Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne | The Renewables Infrastructure Group Limited | 100 | Consented, not built |
| West Boldon Substation - Battery Energy Storage East of the West Boldon Substation, 400 metres south of the A184 and 300m East of the A189 in South Tyneside | Whirlwind Energy Storage Limited | 60 | Consented, not built |
| Hastings Hill Farm, Foxcover Road - Battery Energy Storage Hastings Hill Farm, Foxcover Road, East Herrington, Sunderland | Root Power (North) Limited | 38 | Consented, not built |
| Fox Cover Road - Battery Energy Storage Land At Foxcover Road Sunderland | Newton Energi Limited | 30 | Consented, not built |
| Stephenson Road - Micro Energy Storage North Side Of Stephenson Road, Stephenson, Washington | AMP Clean Energy | 0.2 | Consented, not built |
| AESC UK, Giga Factories, Plot 2 - Plant 3, Warehouse, Office & Sub-stations N/O The A1290 And W/O International Drive, Washington, East Boldon | AESC UK Limited | – | Consented, not built |
| Evolve Business Centre Evolve Business Centre, Cygnet Way, Houghton-Le-Spring, Tyne and Wear | Sunderland City Services | – | Consented, not built |
| Hamar Close & Wallsend Road, High Flatworth - Battery Energy Storage Land To The North And East Of Flatworth 132KV Electricity Substation South Of Hamar Close And North Of Wallsend Road | Harmony Energy Storage | – | Consented, not built |
| Newburn Haugh Battery Storage Systemc Land To The South Of Former Glassworks Northumberland Road | Balance Power Projects Limited | – | Consented, not built |
| Newcastle International Airport Phase 2 - Battery Storage Adj Newcastle International Airport, S/O The Eastern End Of The Runway & W/O Dinnington Road, Newcastle Upon Tyne | Newcastle International Airport | – | Consented, not built |
| Newcastle International Airport Phase 3 - Battery Storage Adj Newcastle International Airport, S/O The Eastern End Of The Runway & W/O Dinnington Road, Newcastle Upon Tyne | Newcastle International Airport | – | Consented, not built |
| Newcastle International Airport Phase 4 - Battery Storage Adj Newcastle International Airport, S/O The Eastern End Of The Runway & W/O Dinnington Road, Newcastle Upon Tyne | Newcastle International Airport | – | Consented, not built |
| Planet Place, Stephenson Industrial Estate - Unit 27 - Battery Energy Storage Unit 27, Planet Place, Stephenson Industrial Estate, Killingworth, Newcastle Upon Tyne | Private Developer | – | Consented, not built |
| Saint Marys Car Park, Saint Marys Boulevard - Battery Storage Saint Marys Car Park, Saint Marys Boulevard | Sunderland City Council | – | Consented, not built |
| Union Hall Road, Lemington - Battery Energy Storage Facility Ew/O 2 Riversdale Way Union Hall Road, Lemington, Newcastle-upon-Tyne | Newton Energi | – | Consented, not built |
| Venus Park, Trading Estate - Battery Energy Storage Venus Park,Narvik Way,Tyne Tunnel Trading Estate,North Shields | Northumberland Estates | – | Consented, not built |
| Church Bank - Battery Storage System Formerly M H Southern, Church Bank, Jarrow | AMG Energy | 100 | In planning |
| Newburn BESS - Battery Energy Storage System North East Concrete Limited, High Street, Newburn, Newcastle Upon Tyne | Fig Power | 90 | In planning |
| Salters Lane - Solar Panels Salters Lane, Houghton Le Spring | Grupotec Solar Uk 9 Limited | 18 | In planning |
| Greenhead Energy Park West Of Coalburns Substation And North West Of Chopwell | Exagen | 13 | In planning |
| Port Of Tyne, Tyne Dock - Battery Storage Port of Tyne Tyne Dock South Shields | Port of Tyne Battery Storage Limited | – | In planning |
Battery storage in Vale of Glamorgan
1 project, 50 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Pancross & Oaklands Solar Farm Land at Pancross and Oaklands Farm, near Bonvilston | Infinis | 50 | Under construction |
Battery storage in Warwickshire
19 projects, 372 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Crimscote Solar Farm and Storage Project Crimscote WimpstoneView | Regener8 SPV1 Limited | – | Under construction |
| Eastfields Farm, Harbury - Battery Storage AddressEastfields Farm, Deppers Bridge, Harbury | Vantage RE | – | Under construction |
| Park Lane, Astley - Battery Energy Storage N/O Park Lane Farm, Park Lane, Astley, Nuneaton | Tor Energy Solar Limited | – | Under construction |
| Symmetry Park Energy Centre South Eastern Part Of Zone D N/O Coventry Road, Thurlaston Rugby | Tritax Symmetry | – | Under construction |
| Burton Green Farm - Battery Energy Storage Burton Green Farm, Hob Lane, Kenilworth | Conrad Energy (Developments) Limited | 100 | Consented, not built |
| Honiley Road - Solar Farm & Battery Storage W/O Honiley Road,(A4177), Honiley, Kenilworth | Enso Green Holdings Limited | 57 | Consented, not built |
| Camp Farm, Knowle Hill - Battery Storage 400 Metres W/O Camp Farm, Knowle Hill, Hurley, Atherstone | Ampyr Solar Europe | 50 | Consented, not built |
| Weddington Road - Battery Energy Storage Nuneaton Old Edwardians Rugby Football Club, Weddington Road, Nuneaton | Fig Power | 49.9 | Consented, not built |
| Micro Energy Storage Unit, Kenilworth Road - Micro Energy Storage Facility Micro Energy Storage Unit, Kenilworth Road, Old Milverton, Leamington Spa | AMP Clean Energy | 0.2 | Consented, not built |
| Ashorne Hill - Solar Farm Chesterton Fields Farm, Fosse Way, N/O The M40 & S/O Habury Lane At Ashorne Hill | JBM Solar Projects Limited | – | Consented, not built |
| Bishops Bowl Fishery - Battery Energy Storage Bishops Bowl Fishery, Southam | Mercia Power Response | – | Consented, not built |
| Elms Farm - Solar Farm & Battery Storage Elms Farm, Watling Street, Hinckley | Low Carbon UK Solar Investment Co Limited | – | Consented, not built |
| Fosse Way - Battery Storage W/O Fosse Way, Se/O Radford Semele, Leamington Spa | Staffordshire Solar 1 Limited | – | Consented, not built |
| Middle Road Farm - Solar Farm & Battery Storage Adj Fosse Way and Middle Road Farm, Middle Road, Radford Semele, Leamington Spa | Leicestershire Solar 1 Limited /Novergy | – | Consented, not built |
| Sherbourne - Solar Farm North of A46, Sherbourne Hill, Sherbourne | Namene Solar | – | Consented, not built |
| Stoneshollow Solar Farm Church Farm, Washpit Lane, Barlestone, Nuneaton | JBM Solar Projects Limited | – | Consented, not built |
| Bungalow Farm, Smeaton Lane - Battery Energy Storage Bungalow Farm, Smeaton Lane, Stretton Under Fosse, Rugby | Integrum Renewable Energy Limited | 60 | In planning |
| Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery Storage 295 Metres Nw/O Marston Sewerage Pumping Station, Bodymoor Heath Lane, Bodymoor Heath Road, Sutton Coldfield | Anesco Limited | 50 | In planning |
| Newgate Coolliery - Solar Farm & Battery Storage Bedworth Lane, Astley Lane, Coolliery Wood | Sirius Environmental Limited | 5 | In planning |
Battery storage in West Glamorgan
20 projects, 1,049 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Parc Solar Caenewydd Parc Solar Caenewydd Swansea Road Gorseinon Swansea | Infinis Solar Developments | 46 | Under construction |
| Swansea Greener Grid Park Land West Of, Rhydypandy Road, Morriston, Swansea | Statkraft UK & Swansea Grid Solutions | – | Under construction |
| Lletty Scilp Farm, Swansea North - Energy Storage System W/O Lletty Scilp Farm, Swansea North, Felindre | Innova Renewables | 400 | Consented, not built |
| Bryntywod, Llangyfelach - Battery Energy Storage System East Of Bryntywod Llangyfelach | FRV TH Powertek Limited | 200 | Consented, not built |
| Rhydypandy Road, Morriston - Battery Energy Storage System W/O Rhydypandy Road, Morriston, Swansea | Statkraft UK | 100 | Consented, not built |
| Chosen Park, Baglan Energy Park - Unit 3 - Battery Storage System Unit 3, Chosen Park, Lane From Brunel Way To Sewage Pumping Station, Baglan Energy Park, Neath | Aldustria Energy Storage | 30 | Consented, not built |
| John Green Frog Power Compound, John North Road - Battery System Tir John Green Frog Power Compound Tir, John North Road, Port Tennant | Green Frog Power Limited | 20 | Consented, not built |
| Brynwhilach Solar Farm, Morriston - Battery Storage Bryn Whilach Farm Morriston | Swansea Bay University Health Board | 1 | Consented, not built |
| Swansea University, Fabian Way - Battery Energy Storage Swansea University Bay Campus, Fabian Way, Crymlyn Burrows, Swansea | Swansea University | 0.5 | Consented, not built |
| Central Avenue - Battery Storage Junction Of Central Avenue And Polaris Drive Baglan Energy Park | AMP Clean Energy | 0.2 | Consented, not built |
| Corporation Road, Nant Y Felin - Micro Energy Storage Corporation Road, Opp Nant Y Felin, West Industrial Park, Swansea | Battery Box Limited | 0.2 | Consented, not built |
| Ferryboat Close, Swansea Enterprise Park - Micro Energy Storage Unit Ferryboat Close, Swansea Enterprise Park, Swansea | AMP Clean Energy | 0.2 | Consented, not built |
| Garngoch Industrial Estate, Penllergaer - Micro Energy Storage Facility Unit 3, Garngoch Industrial Estate, Gorseinon Road, Penllergaer | AMP Clean Energy | 0.2 | Consented, not built |
| Morfa Stadium, Normandy Road - Battery Storage S/O Morfa Stadium, Btw Brunel Way And Normandy Road | AMP Clean Energy | 0.2 | Consented, not built |
| Gwenlais Farm, Carmel Road - Gwenlais Solar Farm Ne/O Gwenlais Farm, Carmel Road, Pontlliw, Swansea | Solar Securities Group Limited | – | Consented, not built |
| Abergelli Farm, Felindre - Battery Storage Abergelli Farm Felindre | EDF Energy Renewables | 250 | In planning |
| Felinfach, Swansea West Industrial Estate - Micro Energy Storage Plots M & N Felinfach Swansea West Industrial Estate | AMP Clean Energy | 0.2 | In planning |
| Kemys Way - Micro Energy Storage Facility S/O Kemys Way, Swansea Enterprise Park, Swansea | AMP Clean Energy | 0.2 | In planning |
| Kemys Way, Swansea Enterprise Park - Battery Energy Storage S/O Kemys Way, Swansea Enterprise Park, Swansea | AMP Clean Energy | 0.2 | In planning |
| Plot U, Felin Fach - Micro Energy Storage Plot U Felin Fach Fforestfach | AMP Clean Energy | 0.2 | In planning |
Battery storage in West Lothian
6 projects, 351 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Drumshoreland Road Battery Storage Facility Site At Drumshoreland Road Pumpherston | Engie Regeneration Limited | 49.9 | Operating |
| Broxburn Land at Lookabootye, by Broxburn, adjacent to the Lookabootye substation. | Renewable Energy Systems (RES) | 20 | Operating |
| Pond Industrial Park, Whitburn Road - Pond Battery Storage Pond Industrial Park, Whitburn Road, Bathgate | Banks Renewables | 200 | Consented, not built |
| Middlerigg - Battery Energy Storage Middlerigg | Galileo Green Energy Scotland Limited | 49.9 | Consented, not built |
| Drumcross Battery Storage Land West Of Mossbank Cottages Drumcross Bathgate | Muirhall Energy | 30 | Consented, not built |
| Tormywheel Wind Farm Extension Tormywheel Wind Farm, Levenseath, Forth | Muirhall Energy | 1 | Consented, not built |
Battery storage in West Midlands
65 projects, 2,820 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Golds Hill - Battery Storage Adj Tame Valley Canal, Golds Hill Way, Tipton | Constantine Energy Storage ltd | 57 | Operating |
| Bustleholme Substation Western Power Distribution Bus, Woodruff Way, Walsall, West Midlands | Pivot Power | 49.9 | Operating |
| Coventry National Grid Substation National Grid Substation, Parrotts Grove, Coventry, West Midlands | Pivot Power | 49.9 | Operating |
| Bloxwich Battery UNIT 5, BLOXWICH LANE INDUSTRIAL ESTATE, BLOXWICH LANE, WALSALL, WS2 8TF | Gresham House Energy Storage | 41 | Operating |
| Anchor Lane Energy Centre Land adj to Birmingham Canal S, Anchor Lane, Anchor Bridge, Bilston, West Midlands | Suncredit | 4 | Operating |
| EPSRC Willenhall Willenhall, Wolverhampton | University of Sheffield& Eon& Uniper | 2 | Operating |
| Pepperhill Solar Farm - Solar Farm & Battery Storage The South Of Holyhead Road Albrighton | Low Carbon | – | Operating |
| Hams Hall - Battery Energy Storage System East & Se/O Dunton Hall, Kingsbury Road, Curdworth, Sutton Coldfield | Welbar Energy Storage Limited & Penso Power (BW ESS) | 400 | Under construction |
| Little Beanit Farm, Balsall Common - Berkswell Battery Storage Little Beanit Farm Waste Lane Balsall Common Solihull | Penso Power (BW ESS) | 200 | Under construction |
| T Main Road, Ansty - Battery Energy Storage System Main Road, Ansty | FRV Tyler Hill BESS 1 Ltd | 200 | Consented, not built |
| Edwin Richards Quarry, Portway Road - Battery Storage Edwin Richards Quarry Portway Road | Downing Energy Development Company Limited | 100 | Consented, not built |
| Pool Hall Farm, Lower Penn - Battery Storage Pool Hall Farm Lower Penn | Elgin Energy Esco Limited | 100 | Consented, not built |
| Ebstree Road, Trysull, Seisdon - Battery Energy Storage South of Ebstree Road Trysull, Seisdon | NZED Projectco 3 limited | 99.9 | Consented, not built |
| Illeybrook Farm - Battery Energy Storage Illeybrook Farm, Illey Lane, Halesowen | Net Zero Eleven Limited | 99.8 | Consented, not built |
| Hams Hall, Hams Lane - Battery Energy Storage System 290 Metres E/O Hams Hall Electricity Sub Station, Hams Lane, Lea Marston, Sutton Coldfield | Eon UK Plc | 98 | Consented, not built |
| Henwood Lane, Catherine De Barnes - Battery Storage Facility E/O Henwood Lane, Catherine-De-Barnes, Solihull | ARL016 | 98 | Consented, not built |
| Holly Lane Energy Park - Solar Farm & Battery Storage Holly Lane Energy Park | Exagen | 75 | Consented, not built |
| Illey Lane - Battery Energy Storage Illey Lane, Hunnington, Halesowen | Grenergy Renewables UK Limited | 70 | Consented, not built |
| Oaklands Farm, New Road - Battery Energy Storage Oaklands Farm New Road Featherstone | Conrad Energy (Developments) II Limited | 70 | Consented, not built |
| Canalside - Battery Storage System S/O Flash Lane | Greenfield Energy Developments Limited & Renewable Power Capital | 60 | Consented, not built |
| Beechwood Farm, Hodgetts Lane - Battery Storage Beechwood Farm Hodgetts Lane Berkswell | Enso Energy Limited | 57 | Consented, not built |
| Lowlands Farm - Battery Storage adj to M5 Motorway, Lowlands Farm, Illey Lane, Halesowen | Anglo Renewables | 50 | Consented, not built |
| Penstone Lane, Lower Penn 2 - Battery Storage (Penn 2) Penstone Lane Lower Penn | Anglo Renewables Limited | 50 | Consented, not built |
| South Staffordshire Railway Walk, Castlecroft - Battery Storage South Staffordshire Railway Walk, Castlecroft Road, Castlecroft, Wolverhampton | Balance Power Projects Limited | 50 | Consented, not built |
| Upper Latherford Farm, Latherford Lane - Battery Energy Storage System Upper Latherford Farm Latherford Lane Latherford | Net Zero Twelve Limited | 50 | Consented, not built |
| Ebstree Road, Trysull - Battery Energy Storage Land to the rear of Hollybush Inn, Ebstree Road, Trysull | Bengrove Bess Limited | 49.9 | Consented, not built |
| Hobble Lane, Great Wyrley - Battery Energy Storage Off Hobble Lane, Great Wyrley, Walsall, Walsall | Anglo ES Great Wyrley Limited | 49.9 | Consented, not built |
| Hodgetts Lane, Berkswell - Electricity Storage Facility E/O Hodgetts Lane, Berkswell, Solihull | Coventry Energy Storage Limited | 49.9 | Consented, not built |
| Lichfield Road, Watton Lane - Battery Storage Junction Lichfield Road Watton Lane Water Orton | Anglo ES Water Orton Limited | 49.9 | Consented, not built |
| Wombourne Road, Wombourne - Battery Energy Storage System E/O Wombourne Road, Wombourne | Pathfinder Clean Energy UK Dev Limited | 49.5 | Consented, not built |
| Chapel Lane - Battery Energy Storage System Adj The Duckery, Chapel Lane, Great Barr, Walsall | Anesco Limited | 49.4 | Consented, not built |
| Chillington Estate, Chillington Park - Battery Storage Chillington Estate Chillington Park Chillington | Elgin Energy Esco Limited | 40 | Consented, not built |
| Mcdonnell Drive, Exhall - Battery Energy Storage System Site 126b005 - Mcdonnell Drive, Mcdonnell Drive, Exhall | Greenfield Energy Developments Limited | 30 | Consented, not built |
| Tanners Lane - Battery Energy Storage System Off Tanners Lane, Coventry | Tag Energy Development UK Limited | 30 | Consented, not built |
| Torrington Avenue Battery Storage Facility Torrington Avenue, Coventry | Power Initiatives Limited | 30 | Consented, not built |
| Fordhouse Lane - Battery Energy Storage System 165 Fordhouse Lane, Stirchley, Birmingham | FPC (Electric Land) Limited | 20 | Consented, not built |
| Maybrook Road - Battery facility Maybrook Business Park - Unit 6 Maybrook Road Sutton Coldfield | Conrad Energy (Develeopments) Limited | 13.1 | Consented, not built |
| Marston Fields Farm, Kingsbury Road - Battery Energy Storage 230 Metres West Of Marston Fields Farm Kingsbury Road Lea Marston | PACE Wedge Energy Limited | 10 | Consented, not built |
| Midland Quarry Products, Smith Road - Battery Storage Adjacent Midland Quarry Products Smith Road | Gresham House Devco Pipeline Limited | 10 | Consented, not built |
| Albrighton Substation, Beamish Lane - Battery Storage North of Albrighton Substation, Beamish Lane, Albrighton | Fig Power (part of Hydrock) | 7 | Consented, not built |
| Bull Lane - Micro Energy Storage Delta Gardens, Opp 74 & 76 Bull Lane, Greets Green Road, West Bromwich | AMP Clean Energy | 0.2 | Consented, not built |
| Charlemont Open Space, Charlemont Road - Micro Energy Storage Charlemont Open Space Beaconview Road | AMP Clean Energy | 0.2 | Consented, not built |
| Element Court, Hilton Cross Business Park - Micro Energy Storage Facility 1-8 Element Court, Hilton Cross Business Park, Featherstone | AMP Clean Energy | 0.2 | Consented, not built |
| Energyst Rental Solutions, Station Road - Micro Energy Storage Facility Energyst Rental Solutions Unit 4e, Station Road, Four Ashes | AMP Clean Energy | 0.2 | Consented, not built |
| Greets Green Playing Field, Wattle Road - Energy Storage System Adj Sub Station Greets Green Playing Field, Wattle Road, West Bromwich | AMP Clean Energy | 0.2 | Consented, not built |
| Latherford Close, Four Ashes - Micro Energy Storage Latherford Close Four Ashes | AMP Clean Energy | 0.2 | Consented, not built |
| Northfield, Merritts Brook Lane - Battery Storage Merritts Brook Lane Land at rear of 103-107 Northfield | Aggregated Micro Power Holdings Plc | 0.2 | Consented, not built |
| Ridgacre Enterprise Park, Ridgacre Road - Micro Energy Storage Facility Adj Unit 1, Ridgacre Enterprise Park, Ridgacre Road, West Bromwich | AMP Clean Energy | 0.2 | Consented, not built |
| Sedgley Road West - Micro Energy Storage The South Side Of Sedgley Road West, Tipton | AMP Clean Energy | 0.2 | Consented, not built |
| Tat Bank Road, Western Road - Micro Energy Storage Fronting Club 99 Tat Bank Road, W/O Western Road, Oldbury | AMP Clean Energy | 0.2 | Consented, not built |
| Upper Church Lane - Energy Storage Facility East Side Of Upper Church Lane, Tipton | AMP Clean Energy | 0.2 | Consented, not built |
| York Road - Micro Energy Storage Facility York Road, Rowley Regis | AMP Clean Energy | 0.2 | Consented, not built |
| Corley Smorral Lane - Battery Storage 350 metres NW/O Marlwood Bungalow & Land E/O Breach Oak Lane, Corley Smorral Lane Astley Fillongley, Coventry | Barrs Family Enterprises Limited | – | Consented, not built |
| County Lane - Solar farm The W/O County Lane, Albrighton, Wolverhampton | Boultbee Brooks Renewable Energy Limited | – | Consented, not built |
| Danks Way - Battery Storage Danks Way | JRB Generation Limited | – | Consented, not built |
| Four Ashes, Deepmore Lane - Solar Farm S/O Four Ashes, Deepmore Lane, Coven, Wolverhampton | Renewable Connections | – | Consented, not built |
| Jaguar Land Rover, Lode Lane – Battery Storage Unit Jaguar Land Rover, Lode Lane | Jaguar Landrover Limited | – | Consented, not built |
| New Summer Street, Hockley - Battery Storage Facility The N/O New Summer Street, Hockley, Birmingham | Voltaria Limited | – | Consented, not built |
| Wolverhampton Road - Micro Energy Storage Facility The South-West Side Of Wolverhampton Road, Oldbury | AMP Clean Energy | – | Consented, not built |
| Coventry National Grid Substation, Hawkesbury Hall - Battery Storage S/O Coventry National Grid Substation, Hawkesbury Hall, Parrotts Grove, Coventry | Bluestone Energy | 98 | In planning |
| Wishaw Lane, Sutton Coldfield - Battery Energy Storage Part of land to the south of Bulls Lane and on the east side of Wishaw Lane Sutton Coldfield | Wiggins Hill BESS Limited | 50 | In planning |
| Hodgetts Lane, Berkswell - Electricity Storage Facility Hodgetts Lane Berkswell | Anglo ES Berkswell Limited | 49.9 | In planning |
| Birmingham And Solihull Rugby Club, Forshaw Heath Lane - Solar Panels Birmingham And Solihull Rugby Club Ltd Forshaw Heath Lane Earlswood | Birmingham & Solihull Rugby Football Club | – | In planning |
| Bognop Road, Essington - Solar Farm & Battery Energy Storage South Of Bognop Road Essington | Intelligent Alternatives Limited | – | In planning |
| The Gate, International Drive - Battery Storage Adjacent The Gate International Drive Shirley | IM Properties Plc | – | In planning |
Battery storage in West Sussex
10 projects, 1,044 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Kings Barn Farm - Energy Barn Kings Barn Farm, Steyning, West Sussex | Anesco& Green Hedge Energy UK | 10 | Operating |
| South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt South terminal car park forecourt, first point, buckingham gate, gatwick, crawley | Gatwick Airport Limited | – | Under construction |
| Great Oak Energy Hub Adj To Shipley Road, Southwater, Horsham | Clearstone Energy Limited | 400 | Consented, not built |
| Bolney Substation - Battery Storage Land off Bob Lane, North Lodge, Twineham, Haywards Heath | One Planet Developments Limited | 264 | Consented, not built |
| Bolney - Battery Storage Land east of Wineham Lane, Wineham, Henfield | Elements Green | 200 | Consented, not built |
| Libra Energy Stability Project - Battery Energy Storage Coombe Farm, Bob Lane, Twineham, Haywards Heath | Lightrock Power | 100 | Consented, not built |
| Boxgrove Common, Tinwood Lane - Battery Energy Storage System Boxgrove Common Tinwood Lane Eartham | Net Zero Fifteen Limited | 70 | Consented, not built |
| The Aspen, Burrell Road - Micro Energy Storage Facility The Aspen Burrell Road | ZAKE Developments | 0.2 | Consented, not built |
| Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage Cobwood Solar Farm, Burnthouse Lane, Cowfold, Horsham | Low Carbon UK Solar | – | Consented, not built |
| Horsham Road - Solar Farm & Battery Storage Huddlestone Farm Horsham Road Steyning | Gülermak | – | Consented, not built |
Battery storage in West Yorkshire
39 projects, 2,596 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Kirkhaw Lane - Battery Storage Energy Ferrybridge Power Station, Kirkhaw Lane, Knottingley | SSE Enterprise Contracting | 150 | Operating |
| Kirkhaw Lane Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley | Walker & Son (Hauliers) Limited | 20 | Operating |
| Bradford West Substation (Harrop Edge Farm) Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford | UK Battery Storage | 49.9 | Under construction |
| Holmfield - Battery Energy Storage Parkinson Spencer Refractories Holmfield Halifax | Parkinson Spencer Refractories | 0.2 | Under construction |
| Holmfield Battery Storage Adj To Sidhil Business Park, Holmfield Industrial Estate, Holmfield, Halifax | Masdar Arlington Energy | 500 | Consented, not built |
| Rawfield Lane - Battery Energy Storage System East Of Rawfield Lane Fairburn | Harmony Energy Limited | 200 | Consented, not built |
| Bradford West, Harrop Lane, Wilsden - Battery Storage Harrop Lane, Wilsden, Bradford | 24 Power Limited | 100 | Consented, not built |
| Lane Side - Energy Storage S/O Lane Side, Wilsden, Bradford | Net Zero Twenty Three Limited | 100 | Consented, not built |
| Peat Dykes Farm, Harrop Lane - Battery Energy Storage System Peat Dykes Farm, Harrop Lane, Wilsden, Bradford | Brockwell Storage & Solar Limited | 100 | Consented, not built |
| Ferrybridge, Stranglands Lane - Battery Energy Storage Adjacent To The Former Ferrybridge Powerstation | One Planet Developments Limited | 99.9 | Consented, not built |
| Neil Fox Way - Battery Storage South Of Wakefield B Substation And East Of Neil Fox Way | Harmony Energy Limited | 99.9 | Consented, not built |
| Skelton Grange Battery Storage Facility Former Skelton Grange Power Station Site West Road North Leeds | Catalyst Capital LLP | 99 | Consented, not built |
| Midland Road - Battery Energy Storage Midland Road, Bradford | Unknown | 80 | Consented, not built |
| Ashday Hall Farm, Ashday Lane - Battery Energy Storage Ashday Hall Farm, Ashday Lane, Halifax, Elland | Sandbrook Capital Bes Limited | 65 | Consented, not built |
| Redcote Lane, Armley - Battery Storage Facility Storage Land Adjacent 4 Redcote Lane Burley | Cambridge Power Limited | 60 | Consented, not built |
| Cooksland Farm, Old Snydale -Battery Energy Storage Cooksland Farm, Old Snydale, Pontefract | Ylem Energy Limited & Root Power | 50 | Consented, not built |
| Hayton House, North Aberford - Solar Farm & Battery Storage Hayton House, Great North Road, North Aberford, Leeds | Econergy International Limited | 50 | Consented, not built |
| Westfield Road, Carlton - Battery Storage Westfield Road Carlton | Firma Vogt Solar Limited | 50 | Consented, not built |
| Buslingthorpe Green - Battery Energy Storage Buslingthorpe Green, Penraevon Industrial Estate, Leeds | Living Power Plc | 49.9 | Consented, not built |
| Lowfields Energy Storage Project Land To South Of, Lowfields Way, Lowfields Business Park, Elland | UK Battery Storage | 49.9 | Consented, not built |
| Newton Lane, Ledston - Battery Storage Facility Newton Lane, Ledston, Castleford | Harmony LS Limited | 25 | Consented, not built |
| Stainland Road, Salterhebble - Battery Storage Facility South Of Sub Station Stainland Road Elland Calderdale | Whirlwind Energy Storage Limited | 25 | Consented, not built |
| Stor Generation Plant - Battery Storage Stor Generation Plant, Duncombe Road, Bradford | Green Frog Power 214 Limited | 12 | Consented, not built |
| Phoenix Healthcare Distribution Centre - Battery Storage Phoenix Healthcare Distribution Centre, 3 Newmarket Lane, Stanley, Leeds | Phoenix Medical Supplies | 3.4 | Consented, not built |
| Former Howden Clough, Howden Clough Road - Battery Units Former Howden Clough Landfill Site, Howden Clough Road, Morley, Leeds | Biffa Waste Services Limited | 2 | Consented, not built |
| Dalton Lane Land At, Dalton Lane, Keighley, West Yorkshire | Endless Energy | – | Consented, not built |
| Gelderd Road, Beeston - Battery Storage East Of Gelderd Road Adjacent To Philippa Way Beeston | Avon Utilities And Generation | – | Consented, not built |
| Holmfield Industrial Estate - Energy Storage Facility E/O Holmfield Industrial Estate, Halifax | Smith Brothers Holmfield BESS Limited | – | Consented, not built |
| Low Farm, Flockton - Battery Storage Low Farm, Wakefield Road, Flockton, Huddersfield | Downing LLP | – | Consented, not built |
| Station Road - Energy Storage Facility Adj Holme Bank Mills Station Road Mirfield | Energy Optimisation Solutions | – | Consented, not built |
| Stranglands Lane - Battery energy storage Holmfield Lane Stranglands Lane Knottingley | Harmony Energy Storage Limited | – | Consented, not built |
| Kellingley Farm, Stocking Lane - Battery Energy Storage Kellingley Farm, Stocking Lane, Kellingley, Knottingley | Newton Energi Limited | 240 | In planning |
| Stocking Lane - Battery Energy Facility Stocking Lane, Weeland Road, Knottingley | Nel Tiger | 200 | In planning |
| Old Allen Road, Wilsden - Battery Energy Storage System Old Allen Road, Wilsden, Bradford | Renewable Connections Developments Limited | 99.9 | In planning |
| Juniper Farm, Main Street - BESS Juniper Farm, N/O Main Street And E/O Woodgate Lane, Weeton, Leeds | ABEI Energy Group | 10 | In planning |
| Woodcock Solar Farm, Sweeming Lane - Battery Energy Storage Woodcock Solar Farm, Se/O Little Fenton, Sweeming Lane, Little Fenton, Leeds | AEUK Solar Project IX | 4.7 | In planning |
| Tate & Lyle Sugars, Ripley Drive - Solar Panels & Battery Energy Storage Tate & Lyle Sugars, Ripley Drive | Tate & Lyle Limited | 0.6 | In planning |
| The West Yorkshire Transport Centre, Cleckheaton Road - Battery Storage The West Yorkshire Transport Centre Lying To The South West Of Cleckheaton Road Low Moor | AMP Clean Energy | 0.2 | In planning |
| Light Valley Solar, Selby Road -Battery Energy Storage Light Valley Solar Sites, Selby Road, Monk Fryston, Leeds | Light Valley Solar Limited (Island Green Power) | – | In planning |
Battery storage in Wiltshire
38 projects, 1,919 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Melksham Substation East Storage Land to the south of Melksham Substation Westlands Farm Westlands Lane Whitley Melksham | Statera Energy & Melksham East Storage | 50 | Operating |
| Minety South - Battery Storage Land South of Minety Substation Minety | Statera Energy | 50 | Operating |
| Minety South 2 - Battery Storage Facility Purlieus Farm, Minety, Malmesbury | Statera Energy | 50 | Operating |
| Stonehill Energy Storage / Lower Minety Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury | Penso Power (BW ESS) | 50 | Operating |
| Stonehill Energy Storage / Upper Minety Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury | Penso Power (BW ESS) | 50 | Operating |
| Mannington Battery Storage Plant Mannington Depot Telford Way, Service Road, Mannington, Swindon, Wiltshire | Still Waters Green Technology | 49.9 | Operating |
| Salisbury Substation Land Adjacent To, Salisbury Substation, Wilton, Salisbury | SSE Renewables | 49.5 | Operating |
| B and Q Distribution Centre Highworth Road Unit 1, B and Q Distribution Centre, Milne Way, Swindon, Wiltshire | Kingfisher & Solar Century | – | Operating |
| Leigh Delamere - Solar farm & Battery storage The S/O The M4 At Leigh Delamere, To The W/O Leigh, Delamere Motorway Services, Chippenham | Eden Renewables | 40 | Under construction |
| Brindley Close (Extension) Land At, Brindley Close, Cheney Manor Industrial Estate, Swindon | Public Power Solutions | 6 | Under construction |
| Corner Copse Solar Farm Corner Copse Solar Farm, Stanton Fitzwarren, Swindon | BayWa r.e. UK Limited | – | Under construction |
| Studley Farm - Solar Farm & Battery Storage Studley Farm, Atworth, Melksham | Aura Power | – | Under construction |
| Wick Farm, Melksham Substation Land North of Melksham Substat, Near Melksham, Chippenham | JBM Solar Projects | – | Under construction |
| Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham | ADV 003 Limited | 150 | Consented, not built |
| Queenslaine Farm, Highworth Road - Battery Energy Storage System E/O A361 Highworth Road, Queenslaine Farm, Highworth, Swindon | Elgin Energy | 66 | Consented, not built |
| Fairholme, Minety - Battery Storage Dog Trap Lane , Minety | Pelagic Energy | 50 | Consented, not built |
| Stonehill Energy Storage Stonehill, Minety | Penso Power (BW ESS) | 50 | Consented, not built |
| National Grid Minety Substation National Grid Minety Substatio, Stonehill, Charlton, Malmesbury, Wiltshire | Harbour Energy | 49.9 | Consented, not built |
| Ravensroost Farm, Minety - Battery Energy Storage Ravensroost Farm, Minety, Malmesbury | Conrad Energy Developments II Limited | 49.9 | Consented, not built |
| Forest Gate - Solar Farm & Battery Storage Forest Gate, Pewsham, Chippenham | Eden Renewables | 40 | Consented, not built |
| Red Barn - Solar Farm & Battery Storage Red Barn, East of Kington St Michael | Eden Renewables | 40 | Consented, not built |
| Catsbrain Farm - Battery Storage N/O Kingsdown Road & West Of Catsbrain Farm Swindon | Conrad Energy (Developments) II Limited | 30 | Consented, not built |
| Whaddon Lane, Hilperton west of Whaddon Farm, Whaddon Lane, Hilperton | British Solar Renewables | 18 | Consented, not built |
| Minety Substation Land Near Minety Substation, Stonehill, Charlton, Malmesbury | JBM Solar Project | 10 | Consented, not built |
| Mill Farm, Teffont - Battery Energy Storage Electricity Sub Station 73m From Goldens 9m From Unnamed Road, Road To Mill Farm, Teffont, Salisbury | Private Energy Partners Pty Limited | 8.5 | Consented, not built |
| Somerford Farm, Brinkworth - Battery Storage Somerford Farm, Brinkworth | Pelagic Energy | 6.6 | Consented, not built |
| Studley Grange Landfill Site, Garden Centre Road - Battery Storage Studley Grange Landfill Site, Garden Centre Road, Studley | Biffa Waste Services | 1 | Consented, not built |
| Codford Biogas - Battery Energy Storage System Codford Biogas, Malmpit Hill, Codford, Warminster | Codford Biogas Limited | – | Consented, not built |
| Codford Solar Farm Phase 4 East Farm, Codford St Mary, Warminster | JM Stratton & Company | – | Consented, not built |
| Crudwell Road Solar Farm & Battery Storage Land west of A429 (Crudwell Road) North of Malmesbury | Five Lanes Solar Limited | – | Consented, not built |
| Mod Lyneham, Calne Road - Solar Array ( Project Cubit) Mod Lyneham, Calne Road, Lyneham, Chippenham | Kier Construction Southern Limited | – | Consented, not built |
| Pond Lane, Minety - Battery Storage Facility Pond Lane , Minety | Pelagic Energy | – | Consented, not built |
| Storridge Road - Battery Storage The west side of Storridge Road, Westbury | NextPower SPV 15 Limited | – | Consented, not built |
| Lime Down - Battery Storage W/O Corston, N/O Hullavington, Chippenham | Island Green Power | 500 | In planning |
| Brockleaze, Neston Park Estate - Battery Energy Storage Neston Park Estate, Corsham | Grenergy Renewables UK Limited | 450 | In planning |
| Sands Farm Quarry, Low Lane - Battery Storage Sands Farm Quarry, Low Lane, Calne | Valencia Waster Management Limited | 4 | In planning |
| Blackthorn Solar Farm Boscombe Down Solar Farm, Porton Road | Eden BD Solar Limited | – | In planning |
| Cooles Farm, Minety - Solar Park/Battery Storage Cooles Farm, Minety | Ecotricity Generation Limited | – | In planning |
Battery storage in Worcestershire
22 projects, 554 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Doverdale - Solar Farm & Battery Storage Northwest of Doverdale, Southall Lane, Doverdale, Worcester | RWE | 49.9 | Operating |
| Littleton Solar Farm S/O Blakes Hill, Access Off Buckle Street, Honeybourne | Stark Energy & SSE Renewables | – | Operating |
| Rectory Farm, Rectory Lane - Battery Storage Rectory Farm Rectory Lane Upton Warren | Tag Energy | 30 | Consented, not built |
| Pershore Lane, Tibberton - Battery Energy Storage System Pershore Lane, Tibberton, Worcester | Sirius Renewable Energy | 14 | Consented, not built |
| Copcut Lane, Copcut -Micro Energy Storage System Copcut Lane And A38 Junction, Copcut, Droitwich | AMP Clean Energy | 0.2 | Consented, not built |
| Worcester Rugby Football Club, Hindlip - Micro Energy Storage Facility Worcester Rugby Football Club, Westons Fields, Offerton Lane, Hindlip, Worcester | AMP Clean Energy | 0.2 | Consented, not built |
| Astwood Lane - Greener Grid Park & Energy Storage Land South Of Astwood Lane Feckenham Redditch | Statkraft Wind UK Limited | – | Consented, not built |
| Bishampton Solar Energy Park, Broad Lane - Battery Energy Storage Bishampton Solar Energy Park Broad Lane Bishampton | Infinis Energy Storage Limited | – | Consented, not built |
| Fibden Farm, Hampton Lovett - Battery Energy Storage System S/O Broad Alley, Hampton Lovett, Cutnall Green, Droitwich | Grenergy Renewables | – | Consented, not built |
| Greenfields Farm, Worcester Road - Battery Energy Storage Greenfields Farm, Worcester Road, Upton Warren, Bromsgrove | Mercia Power Response Limited | – | Consented, not built |
| Home Farm Home Farm Twyning Road Strensham | Canadian Solar & Novergy | – | Consented, not built |
| Home Farm Land at (OS 9033 4090) Bourne Road Defford | Canadian Solar & Novergy | – | Consented, not built |
| Lower Strensham - Battery Energy Storage Solar Panel Farm At Bourne Road Defford | Next Energy | – | Consented, not built |
| The Hop Pocket - Battery Storage Facility The Hop Pocket, B4214 From A4103 To Gorsty Lane, Bishops Frome, Worcester | The Hop Pocket Shopping Village | – | Consented, not built |
| Worcester Road, Wychbold - Battery Storage Hut Webbs Of Wychbold Worcester Road Wychbold Droitwich Spa | Webbs Garden Centre | – | Consented, not built |
| Wheaten Hill Farm - BESS Wheaten Hill Farm, Salt Way, Feckenham, Redditch | Boom Power Limited | 400 | In planning |
| The Waddings, Knighton-On-Teme - Battery Energy Storage System The Waddings, Knighton-On-Teme, Tenbury Wells | Integrum SPV 22298 Limited | 60 | In planning |
| Droitwich Road, Martin Hussingtree - Solar Park Os 8864 6045 Droitwich Road, Martin Hussingtree | Ecotricity Limited | – | In planning |
| Feckenham Energy Storage System Feckenham Energy Storage System, S/O Salt Way, Salt Way, Redditch, Feckenham, Redditch | Anesco Limited | – | In planning |
| Fibden Farm - Battery Storage Facility Fibden Farm, Droitwich | Grenergy Renewables | – | In planning |
| Lincomb Farm - Battery Storage Facility Lincomb Farm, Lincomb Lane, Lincomb, Hartlebury, Stourport on Severn | EL Asset Co.1 Limited | – | In planning |
| Roundhill, Earls Common Road, Stock Green - Solar Farm Earls Common Road Stock Green | JBM Solar Projects 11 Limited | – | In planning |
Battery storage in Yorkshire
1 project, 20 MW where stated
| Project | Operator | Capacity MW | Stage |
|---|---|---|---|
| Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage South & W/O Froghall Farm, Wyton Road, Preston, Hull | GAM Capital Limited | 20 | Consented, not built |
Every project, with its planning record, is published as JSON. The consented and planned sites are also a layer on the live map: zoom into Britain and switch on Battery projects.